Search Documents

  • SAIMM
    The use of mixed integer linear programming for long-term scheduling in block caving mines

    By G. van Hout, D. Rahal

    Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can ca

    Jan 1, 2003

  • IIMP
    Flotación en la descarga de la molienda primaria: una alternativa para mejorar la performance metalurgica en la Compañía Minera Raura

    By Fernando Bermejo

    El presente texto describe la implementación del método Flash - Flotation para el proceso de optimización de plantas concentradoras polimetálicas en la Compañía minera Raura donde se tienen diferentes

    Sep 12, 2005

  • SME-ICGCM
    Improving Design Methodology For Innovative Rock Mechanics Design

    By Dwayne C. Kicker

    This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a

    Jan 1, 1989

  • NIOSH
    OFR-106-81 A Training Program For Conventional And Raise Drill Shaft Construction Personnel

    By J. Bongarra

    This report describes the development of the instructional design and content of a training program for shaft construction miners and supervisors. The recommended training approach is based on the res

    Jan 1, 1979

  • AUSIMM
    New Zealand Institute of Mining Engineers

    I would take this, opportunity of thanking you for the high honour you have conferred on me in electing me to the responsible position of President. You may rest assured I will use my best endeavours

    Jan 1, 1901

  • AUSIMM
    Raub Gold-Genesis and Recovery

    The Raub Gold Mines are situated approximately in the centre of the Malayan Peninsula in the State of Penang. Part of the area, now known as "Raubhole," was opencut some 800 years ago by the

    Jan 1, 1945

  • NIOSH
    IC 8862 Land Utilization And Reclamation In The Mining Industry, 1930-80

    By Wilton Johnson

    The Bureau of Mines study indicates that land utilized by the mining industry for mineral extraction and processing from 1930 through 1980 amounted to 5.7 million acres, or 0.25 percent of the land ma

    Jan 1, 1981

  • CIM
    In Situ Monitoring of Cemented Paste Backfill Pressure to Increase Backfilling Efficiency

    By M. W. Grabinsky, B. D. Thompson

    ABSTRACT: Use of cemented paste backfill (CPB) offers economic and environmental advantages over other backfill methods. However, many operations have limited knowledge of how their CPB behaves in sit

    Jan 1, 2011

  • AUSIMM
    The Preparation of Sections of Copper-Lead Alloys For Metallographic Examination

    In the course of work being carried out in the Lubricants and Bearings Section of the Council lor Scientific and Industrial Research on the production of copper4ead 'bearings for 'use in air

    Jan 1, 1944

  • SME
    Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, Austria

    By Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin

    PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973

    Jan 1, 2005

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • AUSIMM
    X-Ray Diffraction Analysis of Broken Hill Dusts

    The problems of using comparatively simple x-ray diffraction equipment for quantitative analysis are examined. Internal standard and direct calibration procedures based upon the measurement of integra

    Jan 1, 1968

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • AUSIMM
    Primary Magmatic Segregation Deposits in New Zealand, their Characteristics and Tectonic Setting

    Mineral deposits in New Zealand whose origin can be ascribed to primary magmatic segregations are associated with mafic-ultramafic complexes related to two orogenic episodes which took place during Pa

    Jan 1, 1980

  • AUSIMM
    Managing the Impact of Environmental Law on Major Resource Development Projects

    Ensuring the success of a major resource development project, whether in the Gippsland Basin or elsewhere, is typically both a complex and costly process. It is therefore imperative from the point o

    Jan 1, 1992

  • AUSIMM
    The Structure of the Rosebery Ore Deposit, Tasmania

    The pyrite-sphalerite-galena and barite orebodies at the Rosebery mine are concordant with the shale host rock and have been deformed into one system of folds with an associated axial plane cleavage.

    Jan 1, 1972

  • AUSIMM
    Mining Legacies – Understanding Life-of-Mine Across Time and Space

    By M Pepper, C R. Roche, G M. Mudd

    "The Australian mining industries approach to life-of-mine planning has improved considerably in recent decades. It now needs to be matched by, and embedded in, mining governance systems that utilise

    Jul 16, 2014

  • SAIMM
    Utility-based framework for optimal mine layout selection, subject to multiple-attribute decision criteria

    By F. M. C. C. Vieira

    Four mining alternatives for exploiting an ultra-deep orebody were assessed through a multidisciplinary evaluation process which involved: the generation of a 3D geological model; the design and sched

    Jan 1, 2003

  • AUSIMM
    Integrated Maintenance Services at the Los Pelambres Mine in Chile - The Lessons Learnt and Best Practices Developed from a Long-Term Sustainable Relationship

    By L Avalos, F Melo Miranda, J Misle, M Ingwersen

    "Los Pelambres, majority owned by the Chilean company Antofagasta Minerals, is one of the leading producers of copper and molybdenum in the country. It is located high in Andes Mountains, over 3000 me

    Jul 15, 2013

  • SAIMM
    Electrode Management ? Investigation Into Soft Breaks At 48MVA FeCr Closed Furnace

    By P. K. Sahoo, C. R. Ray, S. S. Rao

    Good operation of Soderberg electrodes is dependent upon high quality electrode paste coupled with better electrode management procedures. Without having a good electrode operation, it is not possible

    Jan 1, 2007