Search Documents

  • SME
    The Challenge Of Building Tunnel Boring Machines For The Eurotunnel Protect

    By David L. Shearer

    INTRODUCTON James Howden first secured an order for two Service Tunnel Boring machines in November 1986. These Tunnel Boring machines were 5.7 and 5.4 metres in diameter and the full length includi

    Jan 1, 1989

  • CIM
    Water Supply Sourcing Options for Oil Sands Mines

    By Leslie F. Sawatsky

    Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin

    May 1, 2004

  • AUSIMM
    No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?

    By S Christensen

    In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha

    Jan 1, 2002

  • SME-ICGCM
    Engineering Classification of Shales

    By Robert A. Siokler

    Approximately 75 percentage of the earth's land surface is comprised of shale or shale-like materials. Shale itself is composed of the residue from an almost infinite variety of weathered parent

    Jan 1, 1986

  • NIOSH
    OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment

    By Gene R. Reid

    The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p

    Jan 1, 1975

  • AUSIMM
    Determination of Fracture Toughness of Anisotropic Rocks Under Water Vapour Pressure by Semi-Circular Bend Test

    Failure of rock materials is a process of crack propagation. Crack initiation takes place when the crack tip stress intensity K reaches a critical value called fracture toughness, K1C. The rock fractu

    Dec 6, 2010

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • CIM
    In Situ Fracturing Mechanics Stress Measurements to Improve Underground Quarry Stability Analyses

    By Anna M. Ferrero

    Stability condition of underground excavations have to be assessed to guarantee safe operations within the quarrying working areas. This objective requires a reliable assessment of the rock mass natur

    May 1, 2009

  • AIME
    Chuquicamata Sulphide Plant: Tailing Disposal

    By R. M. Kuralt

    CONCESSION from the Chilean government granting the company use of the Rio Salado water stipulates that a minimum of 35,000 metric tons of such salty water must be diverted from the Salado daily, and

    Jan 1, 1952

  • IMPC
    A Modelling Study of the Dynamics of Sulphide Heap Leach Processes with a View to Improved and Novel Applications

    By Jochen Petersen, David G. Dixon

    "Although heap leaching may be perceived as a somewhat low-tech route for the extraction of low-grade minerals, the underlying physical, chemical and biological processes are in fact extremely complex

    Jan 1, 2003

  • NIOSH
    A New Series Of Bureau Of Mines Reports Announced

    A new series of reports called ?Mineral Perspectives" (MP's) has been initiated by the Bureau of Mines with the publication of MP-1 titled, "Far East and South Asia" by K.P. Wang and the staff of

    Jan 1, 1977

  • SME
    Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing Mining, Metallurgy and Exploration (06a20e42-2867-46de-b95c-3ec174a5f1de)

    By Antti Porvali, Vivek Agarwal, Mari Lundström

    Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2·H2O) by a

  • SME
    Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing Mining, Metallurgy and Exploration

    By Antti Porvali, Vivek Agarwal, Mari Lundström

    Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2·H2O) by a

  • CIM
    Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities

    By Godfrey MacDonald

    "The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East

    Jan 1, 1997

  • DFI
    Design Of Cooper River Bridge Foundations

    By Osama Safaqah

    The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town

    Jan 1, 2005

  • NIOSH
    IC 8338 The Interindustry Structure Of The U.S. Mining Industries-1958

    By Kung-Lee Wang

    This report describes the linkage of all mining sectors with all other manufacturing, services, and final demand sectors of the U.S. economy. Besides being a basic data source, it provides a framework

    Jan 1, 1967

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • CIM
    Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective

    By K. Barr, F. Grenier, J. Hettinger

    "To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build

    Jan 1, 1988

  • AUSIMM
    An Empirical Analysis of Progressive Value and Risk of Exploration in the Plutonic Marymia Gold Belt,Western Australia

    By M Fallon

    The full history of exploration successes, failures and related costs from initial greenfield exploration in 1987 to the current brownfield stages was analysed for the Plutonic Marymia Gold Belt of We

    Jan 1, 2009

  • CIM
    Successful Design of the NICO Grinding Circuit for Unusually Hard Ore

    By Mike Samuels, John Starkey

    "This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi

    Jan 1, 2010