Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Challenge Of Building Tunnel Boring Machines For The Eurotunnel Protect
By David L. Shearer
INTRODUCTON James Howden first secured an order for two Service Tunnel Boring machines in November 1986. These Tunnel Boring machines were 5.7 and 5.4 metres in diameter and the full length includi
Jan 1, 1989
-
Water Supply Sourcing Options for Oil Sands Mines
By Leslie F. Sawatsky
Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin
May 1, 2004
-
No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?
By S Christensen
In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha
Jan 1, 2002
-
Engineering Classification of Shales
By Robert A. Siokler
Approximately 75 percentage of the earth's land surface is comprised of shale or shale-like materials. Shale itself is composed of the residue from an almost infinite variety of weathered parent
Jan 1, 1986
-
OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment
By Gene R. Reid
The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p
Jan 1, 1975
-
Determination of Fracture Toughness of Anisotropic Rocks Under Water Vapour Pressure by Semi-Circular Bend Test
Failure of rock materials is a process of crack propagation. Crack initiation takes place when the crack tip stress intensity K reaches a critical value called fracture toughness, K1C. The rock fractu
Dec 6, 2010
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel
By Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
In Situ Fracturing Mechanics Stress Measurements to Improve Underground Quarry Stability Analyses
By Anna M. Ferrero
Stability condition of underground excavations have to be assessed to guarantee safe operations within the quarrying working areas. This objective requires a reliable assessment of the rock mass natur
May 1, 2009
-
Chuquicamata Sulphide Plant: Tailing Disposal
By R. M. Kuralt
CONCESSION from the Chilean government granting the company use of the Rio Salado water stipulates that a minimum of 35,000 metric tons of such salty water must be diverted from the Salado daily, and
Jan 1, 1952
-
A Modelling Study of the Dynamics of Sulphide Heap Leach Processes with a View to Improved and Novel Applications
By Jochen Petersen, David G. Dixon
"Although heap leaching may be perceived as a somewhat low-tech route for the extraction of low-grade minerals, the underlying physical, chemical and biological processes are in fact extremely complex
Jan 1, 2003
-
A New Series Of Bureau Of Mines Reports Announced
A new series of reports called ?Mineral Perspectives" (MP's) has been initiated by the Bureau of Mines with the publication of MP-1 titled, "Far East and South Asia" by K.P. Wang and the staff of
Jan 1, 1977
-
Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing Mining, Metallurgy and Exploration (06a20e42-2867-46de-b95c-3ec174a5f1de)
By Antti Porvali, Vivek Agarwal, Mari Lundström
Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2·H2O) by a
-
Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing Mining, Metallurgy and Exploration
By Antti Porvali, Vivek Agarwal, Mari Lundström
Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2·H2O) by a
-
Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities
By Godfrey MacDonald
"The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East
Jan 1, 1997
-
Design Of Cooper River Bridge Foundations
By Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
IC 8338 The Interindustry Structure Of The U.S. Mining Industries-1958
By Kung-Lee Wang
This report describes the linkage of all mining sectors with all other manufacturing, services, and final demand sectors of the U.S. economy. Besides being a basic data source, it provides a framework
Jan 1, 1967
-
St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles
By J. L. Goen
The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large
Jan 1, 2004
-
Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective
By K. Barr, F. Grenier, J. Hettinger
"To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build
Jan 1, 1988
-
An Empirical Analysis of Progressive Value and Risk of Exploration in the Plutonic Marymia Gold Belt,Western Australia
By M Fallon
The full history of exploration successes, failures and related costs from initial greenfield exploration in 1987 to the current brownfield stages was analysed for the Plutonic Marymia Gold Belt of We
Jan 1, 2009
-
Successful Design of the NICO Grinding Circuit for Unusually Hard Ore
By Mike Samuels, John Starkey
"This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi
Jan 1, 2010