Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine

    By Adrian L. Moodie

    Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.

    Jan 1, 2011

  • SME-ICGCM
    Practical Detection Of Underground Mine Roof Failure

    By David Bigby

    The paper describes research undertaken on an ECSC/K HSE project which investigated several potential physical principles which might be harnessed to provide a non-intrusive means of determining the e

    Jan 1, 2004

  • SME-ICGCM
    Potential Application of Short Encapsulation Pull Test (Sept) Data to Project Relative Roof Control Risk

    By Yoginder Paul Chugh, Jason E. Tinsley

    "Over the last five years, the authors have compiled a database of Short Encapsulation Pull Test (SEPT) evaluations from Interior Basin (Basin) coal mines. Typically, SEPT data are analyzed to obtain

    Jan 1, 2016

  • SME-ICGCM
    Economic Impact of Ascending Mine?Waters in Germany

    By Axel Preusse

    Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste

    Jan 1, 2013

  • SME-ICGCM
    Roof Instability Rating (RIR) System and Its Application at Enlow Fork Mine

    By John C. Stankus

    ldentifcation of potential roof problems in coal mines has long been a complex issue due to the wide variety of mining and geological conditions. It is well known that mine roof falls are related to m

    Jan 1, 2001

  • SME-ICGCM
    Some Factors Influencing Stability Of Longwall Gateroad

    Excessive roadway closure in the gateroads impedes the passage of equipment, supplies, personnel and ventilation air in longwall panels. This pager describes several factors that influence the gat

    Jan 1, 1994

  • SME-ICGCM
    Hydraulic Prestressing Units: An Innovation In Roof Support Technology (6dbf7428-5679-47b2-a60c-95193c59dbda)

    By Thomas Barczak

    A new generation of hydraulic mine support prestressing devices has been developed. These thin-walled steel shells are machine-welded and can be inflated with water or any liquid to provide prestressi

    Jan 1, 2004

  • SME-ICGCM
    In-Situ Investigation Into The Causes Of Falls Of Roof In South African Collieries

    By J. Nielen van der Merwe

    The main objective of the research described in the paper was to determine the causes of falls of roof in South African coal mines. The south African Colliery Manager's Association and the member

    Jan 1, 2001

  • SME-ICGCM
    Characterization of Tensile and Shear Loading on Smooth and Indented Wires and PC–strand Cable Bolts

    By Steven Derycke, Stephen C. Tadolini, Anand Bhagwat

    "The tensile and shear strength of intrinsic bolting support systems has always been a major concern of designers. A comprehensive laboratory testing program was designed to evaluate the tensile and s

    Jan 1, 2015

  • SME-ICGCM
    The Introduction of Uk Rockbolting Technology into Coal MinesAround the World

    By Graham Daws

    The introduction of UK rock bolting technology has been applied in many large underground coal mines around the world. This paper explains the methods that have been applied for its successful introdu

    Jan 1, 2011

  • SME-ICGCM
    Forecasting Roof Falls with Monitoring Technologies - A Look at the Moonee Colliery Experience (4e80a5f5-32b0-43df-a54a-da0b54b2c984)

    By Anthony Lannacchione

    There has been a persistent need to forecast roof falls so that miner's exposure to hazardous underground environments can be minimized. Several monitoring techniques have been developed and are

    Jan 1, 2005

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f

    Jan 1, 2011

  • SME-ICGCM
    Non-Destructive Testing on Fully Grouted Rockbolts

    By Dieter Wittenberg

    The use of thc ultrasound technique for monitoring rockbolt support has at last provided support engineers with a measunng system capable of pinpointing fracture failuns in fully-grouted rockbolts. Th

    Jan 1, 2001

  • SME-ICGCM
    Prediction of Roof Fall Rate in Coal Mines Using Fuzzy Logic

    By Ebrahim Ghasemi

    Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred

    Jan 1, 2011

  • SME-ICGCM
    Calculating the Mining-Induced Horizontal Deformation Indices

    By Krzysztof Tajdus

    In Europe, horizontal strain is a primary parameter for estimating building hazard resistance. Other measured indices, like curvature, are less important, since in most cases of European excavation de

    Jan 1, 2011

  • SME-ICGCM
    A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal Pillars

    By Yunxin Qiu

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp

    Jan 1, 1992

  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011