Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Sub-Surface Ground Movements Associated With Longwall Mining

    By P. Gaskell

    The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics

    Jan 1, 1988

  • SME-ICGCM
    Potential Of A Void Diffusion Model To Predict Longwall Subsidence In The Illinois Coal Basin

    In this paper, the authors attempt to apply a simplified non-homogeneous void diffusion model (NHVDM) to predict surface subsidence for longwall mining in Illinois. A generalized error function subsid

    Jan 1, 1990

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    Coal Pillar Life Prediction in the Vaal Basin, South Africa

    By J. Nielen van der Merwe

    This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri

    Jan 1, 1998

  • SME-ICGCM
    Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?

    By Wouter Hartman

    Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int

    Jan 1, 2012

  • SME-ICGCM
    An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring

    By Greg Hendon

    Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t

    Jan 1, 1990

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Effects of Transverse Isotropy on Vertical Stresses When Multi?Seam Mining under Supercritical Longwall Panels

    By Anastasia M. Suchowerska

    The design of effective ground support requires a sound understanding of the pre-mining state of stress in the stratum to be mined. Irregularities in the stress field encountered during multiseam mini

    Jan 1, 2012

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    Application of Chain Conveyor Cutter (Ccc) to Highwall Mininig System

    By Takashi Sasaoka

    Chain Conveyor Cutter (CCC) is a chainsaw-type machine and originally developed for the construction of underground walls and/or ground improvements. CCC was developed from the accumulated technology

    Jan 1, 2012

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor Tunnel

    By John Rusnak

    The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech

    Jan 1, 1998

  • SME-ICGCM
    Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower Seam

    By Vedala Sastry

    Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall

    Jan 1, 2007

  • SME-ICGCM
    Developments of a Prototype Borehole Profilometer to Estimate Roof-Bolt Anchorage Capacity from Borehole Roughness Measurements-Laboratory Tests

    By Mark K. Larson

    Researchers at the National Institute for Occupational Safety and Health?s (NIOSH) Spokane Research Laboratory are developing a borehole profilometer to dynamically measure the roughness pro-file of b

    Jan 1, 2007

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012