Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • SME
    Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In Illinois

    Roof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution

    Feb 27, 2013

  • SME
    Daniel Island Surprise?Sand Lens Lurking In Cooper MARL, Charleston, SC

    By Ray Brainard

    Charleston Water System?s Daniel Island Extension Tunnel, initially thought to be the simplest of the four replacement tunnels to design and build, became the most challenging after the discovery of a

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • SME
    Large diameter tunneling in Seattle is a sign of things to come

    By Christopher Bambridge

    The Washington State Department of Transportation (WSDOT) is constructing a new tunneled route under Seattle to replace the existing State Route 99, Alaskan Way Viaduct (AWV), which follows the histor

    Sep 1, 2013

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007

  • SME
    Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump Equipment

    By A. Yazadni-Chamzini

    Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl

    Jan 1, 2012

  • SME
    Underground Construction Is Crucial To Success Of Olympic Games Venues

    When the 2008 Olympic Games begin in Beijing, China is September it will not only mark the end of the journey for the Olympic torch and the thou-sands of participating athletes, but the games will als

    Jan 1, 2008

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • SME
    Industrial Minerals 2001

    Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committee

    Jan 1, 2002

  • SME
    Heap Leaching Discussed at Roundtable

    By Kerry Lahti, Bryan Ulrich

    On Feb. 11, 2005, more than 20 mining professionals gathered in Elko, NV for a day-long round-table discussion on heap leaching. Attendees included project managers, operators and environmental profe

    Jan 1, 2005

  • SME
    Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method

    A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor

    Jan 7, 2020

  • SME
    The Lithium Industry - Challenges For The Future - Introduction

    By I. A. Kunasz

    This paper is not intended to review and re-state general information on lithium, but rather to analyze the paradigm that has caused such a rapid rise in lithium production and the development of new

    Jan 1, 2011

  • SME
    Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)

    By J. Drelich, J. Pletka

    Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr

    Jan 1, 2001

  • SME
    More Than 30,000 Expected At MinExpo 2008

    From Sept. 22-24, the Las Vegas Convention Center will be home to MinExpo 2008, the world?s largest mining equipment show that comes along once every four years. Sponsored by the National Mining Assoc

    Jan 1, 2008

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    Techniques for Assessing and Mitigating Longwall Subsidence Effects on Highway Bridges Mining, Metallurgy and Exploration (81ecdff2-8ca5-451f-abf7-490db849ce9c)

    By Yi Luo, Jian Yang, Hua Jiang

    Surface subsidence events induced by underground longwall coal mining operations can cause various disturbances to surface structures ranging from integrity and stability to functionality problems. Hi

  • SME
    Effects Of Chemistry, Mineralogy, Petrography And Alteration On Rock Engineering Properties Of The Goathill North Rock Pile At The Molycorp Questa Mine, New Mexico

    By V. McLemore, A. Fakhimi, K. Donahue, D. Sweeney, V. Viterbo

    In order to evaluate the relationships between weathering and durability and strength of rock samples from the Goathill North rock pile at the Molycorp Questa mine, NM, we conducted slake durability a

    Jan 1, 2007