Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Study Of Coal Mine Roof Behavior During MiningBy R. T. Langland
The U.S. Bureau of Mines has conducted underground tests and computer analyses to study coal mine roof behavior. Southern Ohio Coal Company provided test sites it) their Heigs mines located near Athen
Jan 1, 1977
-
Santa Fe Pacific Gold Targets Million Ounces/Year ProductionBy William R. Yernberg
Santa Fe Pacific Gold, headquartered in Albuquerque, NM is expanding its operation at the Twin Creeks Mine in Nevada. The $250-million sulfide expansion project, including the Sage Mill, is under con
Jan 1, 1996
-
Surface Subsidence Due To Underground Longwall Mining In The Northern Appalachian Coal Field (fdbb1db2-e079-41b4-9da3-36a13eef9d11)By K. K. Kohli
Since the adoption of the Surface Mining Reclamation and Control Act of 1977, which mandates that surface subsidence be an intergral part of the underground coal mine design, there has been a sudden r
Jan 1, 1980
-
Prestressed And Precast Concrete; A Newcomer Comes Of AgeBy W. Burr Bennett
The prestressed concrete industry in particular, and the precast concrete industry to some extent, are rank newcomers to the concrete construction field compared to the cement, ready-mixed or concrete
Jan 1, 1971
-
Characterizing the Mitigation of Substrate Damage Within Underground Structural Liners Through Utilization of Waterjet - Mining, Metallurgy & Exploration (2021) Technology for Rehabilitation WorkBy ERIK CHARRIER, HUGH MILLER, JOSEF BOURGEOIS
In this study, a unique excavation system was characterized, utilizing waterjet technology as the primary tool for material removal during rehabilitation of reinforced concrete and shotcrete structura
Sep 23, 2021
-
Tunneling?s Role In Sustainable Development Discussed At United NationsThe Earth?s population is approaching 6.6 billion people. More than half live in urban areas. And, as those figures continue to grow, the need to make wise use of the world?s natural resources as we
Jan 1, 2008
-
Optimum Auxiliary Fan Location to Control Air Recirculation (Mining, Metallurgy & Exploration)By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal
This paper presents the optimum auxiliary fan(s) location to control air recirculation in dead-end workings where dieselpowered vehicles operate. Investigations were conducted with various secondary f
Oct 18, 2022
-
Salt (3e774718-0534-43ca-850b-16dafb29fc52)By Dennis S. Kostick
Sodium is a silver-colored metal that is so unstable that it reacts violently in the presence of water, and chlorine is a greenish-colored gas that is dangerous and lethal. Yet the combination of thes
Jan 1, 1994
-
The Expansion Of Tarkwa CIL Plant From 4.2mtpa To 12mtpaBy E. Barnard
Tarkwa Gold Mine is located in south western Ghana, and is majority owned and operated by Gold Fields Ghana Limited. The Tarkwa CIL plant utilises a single low aspect 27' x 42' 14MW dual pin
Jan 1, 2008
-
Mineral Appraisal Issues In Court TestimonyBy J. S. Limb
Actual issues which arose during the discovery process or subsequent court testimony are presented. While most of these issues relate to the author’s specialty of mineral appraisal some are more g
Jan 1, 2001
-
An Intelligent Task Control System For Dynamic Mining EnvironmentsAutomation and robotics are the keys to new intelligent autonomous mining systems which can remove operators from the hazardous and stressful mining environment and provide the tools for greater produ
Jan 1, 1994
-
Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans
Jun 23, 2024
-
New Frontiers in Mining: Meeting 21st Century Challenges – Theme of SME Annual Meeting 2022By Tim O’Neil
Nearly 4,800 mining professionals and exhibitors occupying 580 booths attended the 2000 SME Annual Meeting and Exhibit, Feb. 28-March 1, in Salt Lake City, UT. The technical program included80 sessio
Jan 1, 2000
-
Improved Drilling Accuracy Results in Reduced Ore Dilution at Evolution, Cracow (1d6c6ec6-cb87-45aa-b167-63ded86fbade)By Phil Jones
"Dilution — planned and unplanned – remains a significant cost impairment in the mining process. A series of trials were held over a sixmonth period in fiscal year 2018 (FY18) that established the cos
May 1, 2019
-
Are We Testing Enough in Feasibility Studies? - SME Annual Meeting 2025By Marcos de Paiva Bueno, Leonardo Ribeiro Lara, Rajiv Chandramohan, Thiago de Almeida, Greg Lane
This paper explores the impact of the significant difference between the number of geochemical assays conducted for grade estimation and the number of comminution tests performed for throughput and pe
Feb 1, 2025
-
Use of Structure from Motion Photogrammetry for Monitoring of Underground Storage FacilitiesBy Malte J. M. Gurgel, Axel Preusse
The planning, construction, and monitoring of underground storage facilities is a key factor in meeting upcoming challenges as part of the energy transition from fossil fuels to renewables. Therefore,
Jul 1, 2023
-
Mini Symposium - Lignite Mining And Stability ? Coal/Mining & Exploration - Lignite Mining And Stability - Geotechnical Considerations Of The Design Of Highwall And Spoil Slopes In Lignite Mines ? IntroductionBy K. K. Bhattacharyya
Vast deposits of lignite occur in the Gulf Coast states and northern plain states. Lignite resources are cited to be over 43 billion tons in the Gulf Coast states. An additional resource of 16 billion
Jan 1, 1982
-
Using Simulation to Quantify Uncertainty in Ultimate-Pit Limits and Inform Infrastructure Placement (cfb5b753-1dd1-4b26-ba46-16856224ab1e)By M. Deutsch, E. González, M. Williams
"Uncertainty exists in ultimate-pit limits due to geologic variation and unpredictable economic landscapes. In this work, we show how this uncertainty affects the ultimate pit and how it can be analyz
Jan 1, 2015
-
The Acceleration Of Trackless Underground Ore MiningBy R. S. Shepard
The closing remarks of a paper which I presented at the annual AIME meeting at Dallas, Texas during February of 1963; contained a forecast of increased activity in trackless underground ore mining whi
Jan 1, 1967
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023