Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Industrial Minerals 2005 – Construction Aggregates

    By T. J. Nelson

    Natural aggregates, primarily stone, sand and gravel, are recovered from widespread, naturally occurring mineral deposits and processed for use primarily in the construction industry. They are mined,

    Jan 1, 2006

  • SME
    Analysis Of Failure Modes For Fully Grouted Resin Bolts

    By K. Heasley, A. Yassien, A. Khair, S. Peng

    There are three major components of a fully grouted roof bolt which primarily determine its ability to develop and sustain load: the steel rebar, the resin annulus, and the rock/grout interface. The u

    Jan 1, 2004

  • SME
    Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero Emissions

    By Tuncel M. Yegulalp, Anuta Belova

    This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu

    Jan 1, 2005

  • SME
    Mining on the Edge of the Murray Mine

    By Sam Ash

    The Murray Mine was one of the first mechanized cut-and-fill underground gold operations in northern Nevada. At the end of 2002, mine production began to decline. So the mine entered a phase of remnan

    Jan 1, 2006

  • SME
    Numerical simulation on diffusion phenomena in mine airways by using a method of discrete tracer movements

    By K. Sasaki

    Diffusion phenomena in mine airways are important to trace gas and dust introduced into mine ventilation flows. Authors have carried out tracer gas measurements to check mine ventilation using concent

    Jan 1, 2009

  • SME
    A New Packed Column Flotation System

    By David C. Yang

    A packed column (or static tube) flotation system is an innovative technology which utilizes a controlled dispersion reagent scheme and a new machine. The unique aspect of the machine is its packed-be

    Jan 1, 1988

  • SME
    Past, Present, and Future of Texas Industrial Minerals Mining, Metallurgy and Exploration

    By Brent A. Elliott, J. Richard Kyle

    Texas is a major producer of industrial mineral resources required by the state’s ever-growing population that now exceeds 28 million. Texas typically ranks in the top three states for the value of no

  • SME
    An Assessment Of Engineering Noise Controls At A Talc Processing Plant

    By E. R. Spencer

    National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi

    Jan 1, 2008

  • SME
    Brij Moudgil: An Interview With the 2006 SME President

    Your assessment of the minerals business. I would first like to express our profound sadness and sincere condolences to the families of the miners who lost their lives in recent mine mishaps part

    Jan 1, 2006

  • SME
    Minnesota Mining Boasts Another Boom Year

    By William R. Yernberg

    The combined 80th Annual Minnesota Section of SME Meeting and 68th Annual University of Minnesota Mining Symposium was held April 17 and 18, 2007, in Duluth, MN. About 350 mining industry professional

    Jan 1, 2007

  • SME
    Incorporation Of Silicate Buffering In Predicting Acid Rock Drainage From Mine Wastes: A Mechanistic Approach

    By A. D. Nicholson

    This paper presents an approach to quantitatively calculate the neutralization of acid by silicate minerals, based on the chemical kinetics of acid reacting with silicates. This approach incorporates

    Jan 1, 2002

  • SME
    Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In Boston

    By Verya Nasri

    The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr

  • SME
    Geometallurgy For A Two Recovery Process Operation ? Cripple Creek And Victor Gold Mine, Colorado

    Cripple Creek and Victor Gold Mine is an epithermal gold deposit located in the Rocky Mountains of Colorado. Surface operations are continuing along with an expansion for an onsite mill to take place

    Feb 27, 2013

  • SME
    Performance Of An Intelligent Proximity Detection System For Continuous Mining Machines

    By J. L. Carr

    Continuous mining machines are extensively used in the underground coal mining industry. These machines are typically remote-controlled, and severe injuries and fatalities occur every year when a mine

    Feb 27, 2013

  • SME
    A comparison of globe, wet and dry temperature and humidity measuring devices available for heat stress assessment

    By S. Hardcastle

    Various controlled and ambient tests were undertaken to evaluate the performance of a variety of digital heat stress monitors, psychrometers and simpler temperature/relative humidity data loggers that

    Jan 1, 2009

  • SME
    Impact of air velocity and support advance on shield-generated dust

    Steady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee

    Jan 4, 2010

  • SME
    Connections to Old Tunnels - Design Guidelines

    By Jozef F. Zurawski

    Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi

    Jan 1, 2008

  • SME
    Uncertainty Based Push-Back Design Algorithm In Open Pit Mining

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi

    Jan 1, 2007

  • SME
    Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2

    By William H. Hansmire

    The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during

  • SME
    The Route To More Efficient Blind Shaft Drilling?

    By Colin P. Pigott

    The paper describes a variety of existing techniques and equipment which when combined together permit faster and cheaper drilling of shafts in soft to medium strength formations. Drilling fluid circu

    Jan 1, 1985