Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Large-scale deformation in underground hard-rock minesBy P. Turcotte, E. Karampinos, F. Mercier-Langevin
In some underground hard-rock mines, squeezing compressive ground conditions are influenced by the presence of rock foliation and high stress. In these cases, the orientation of the foliation with res
Jan 1, 2015
-
Optimization of shuttle car utilization atan underground coal mineBy P. R. Segopolo
"The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc
Jan 1, 2015
-
Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold MineBy D. F. Malan, Y. Jooste
"SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac
Jan 1, 2015
-
Blast optimization at Kriel Colliery - SynopsisBy A. M. Neale
Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe
Jan 1, 2010
-
Development Of High Resolution 3D Vertical Seismic Profiles - SynopsisBy C. C. Pretorius
3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit
Jan 1, 2011
-
Laser surface alloying of Al with Cu and Mo powdersBy S. T. Camagu, J. Dutta Majumdar, S. L. Pityana
Laser surface alloying was used to develop copper and molybdenum aluminides by injecting premixed copper and molybdenum powder particles into a laser-generated melt pool on an aluminium substrate. Dif
Jan 1, 2015
-
Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore DepositA localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area
Jan 1, 2014
-
Neural network performance versus network architecture for a quick stop training applicationThe relationship between neural network (NN) performance and the parameters that form the architecture of the neural network is complicated. This paper studies an issue that is still controversial—the
Jan 1, 2003
-
Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite MineBy Vinay Kumar Agrawal, Rama Nath Praharaj
IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh
Jan 1, 2007
-
Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? SynopsisCaving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by
Jan 1, 2008
-
A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum MinesBy B. P. Watson
Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor
Jan 1, 2004
-
A Case Study Of Risk Evaluation At Cerrejon MineBy Luis-Fernando Contreras, Juliano Maran, Richard LeSueur
A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res
Jan 1, 2006
-
Evaluation of dynamic grouting effect for Low-permeable rockBy S. Wakita, K. Aoki, Y. Mito, K. Date
It is of great importance to prevent a leakage of hazardous substances from underground storage plants, because this certainly leads to a fatal disaster for human societies. Therefore, effective grout
Jan 1, 2003
-
Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - SummaryBy Philippe Dumont
?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs
-
Alarm and evacuation systems in underground miningBy J. L. Fuentes-Cantillana, Á. Rodríguez, P. Morillo
Evacuation operations from work places in the case of an emergency are the key to minimising the effects of catastrophic type accidents such as fires, explosions, cave-ins, floods, etc. The correct pl
Jan 1, 2003
-
Explosives utilization at aWitwatersrand gold mineBy M. Gaula
"Gold bearing deposits of the Witwatersrand basin are generally less than 2m thick and require conventional narrow-reef mining methods for extraction and employ explosives as a means of rock breaking.
Jan 1, 2015
-
Production Reconciliation of a Multivariate Uniform Conditioning Technique for Mineral Resource Modelling of a Porphyry Copper Gold DepositThe paper provides a brief review of a multivariate uniform conditioning and a localized multivariate uniform conditioning (LMUC) technique, and presents a production reconciliation case study based o
Jan 1, 2014
-
Positive Risk Management: Hidden Wealth in Surface MiningBy J. A. Luckmann
"SynopsisThe purpose of this paper is to introduce an innovative approach to risk management in surface mining operations, namely, positive risk. Traditionally, risk management focused on mitigating l
Jan 1, 2015
-
Copper Solvent Extraction: Status, Operating Practices and Challenges in the African Copper BeltBy Kathryn C. Sole, Owen Tinkler
"Although the first large-scale application of copper recovery by solvent extraction (SX) took place in Zambia in the early 1970s, it is only in the last decade that this technology has become widely
Jan 1, 2015
-
Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for DisplacementBy D. Fenn, A. du Kanda, D. Dukhan
"SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen
Jan 1, 2015