Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Best Practices In Material Choice For Design And Construction Of Hydrometallurgical Equipment
By T. Johnson
Hydrometallurgical processes can be exceptionally corrosive. This is particularly true in acid leaching processes for copper, cobalt, nickel and rare earth elements. In the last five years, several
Jan 1, 2013
-
Risk Weighted Cash Flow, A Communication Tool For Engineers And Financial Professionals On New Technology Projects (d41d36b5-72c1-4d61-8c6a-fe26069e74d8)
By Mark Kennedy
New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological
Jan 1, 2013
-
A Review On Iron Separation In Rare Earths Hydrometallurgy Using Precipitation And Solvent Extractions Methods
By Chen Xia
Iron separation from rare earth elements has always been an essential operation in almost all steps of rare earth element recovery and purification processes. As RE3+ and Fe3+ behave similarly in many
Jan 1, 2013
-
Department Methodology For Low-Grade Ni-Cu-Pge Ores
By L. J. Cabri
The metallurgical response of platinum-group element (PGE) ores to conventional grinding and bulk flotation is driven by (a) the distribution of PGE as discrete platinum-group minerals (PGM), (b) the
Jan 1, 2009
-
Phase Equilibria Studies Of Ferronickel Smelting Slags
Phase equilibria studies have been carried out on the "FeO"-Si02-MgO-A120rCr203 system in equilibrium with iron in the range of compositions and temperatures directly relevant to the nickel laterite d
Jan 1, 2009
-
Piloting Regenerative SO2 Scrubbing At Xstrata Nickel
By D. G. Tisdale
A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different
Jan 1, 2009
-
Challenges Facing Nickel And Base Metal Industries
By A. D. Dalvi
With the current economic situation, the demand for nickel and other base metals has fallen significantly. More than 440 kt/yr world nickel capacity has been taken out of production within the last ye
Jan 1, 2009
-
The Recovery of Nickel and Cobalt from the Northmet Deposit Using the Platsolt-"I Process with Production of Mixed or Separate Nickel and Cobalt Hydroxides
The NorthMet deposit of PolyMet Mining contains a large reserve of copper-nickel-cobaltprecious metal mineralization. Historically it has been difficult to recover separate copper and nickel concentra
Jan 1, 2009
-
Nickel Laterite Rotary Kiln-Electric Furnace Plant Of The Future
By C. Walker
Since the 1950's, production of ferronickel from laterites has predominantly been achieved using the Rotary Kiln -Electric Furnace (RKEF) process. The productivities of kilns and furnaces have in
Jan 1, 2009
-
Zero Liquid Discharge In Treatment Of Aqueous Effluents In Non-Ferrous Metals' Industry -An Option Who's Time Has Come
In view of the increasing environmental regulations that have been promulgated all over the world in the last 30 years, non-ferrous smelters and refineries have learnt and adapted to treat effectively
Jan 1, 2009