    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • DFI
    Ground Disturbance Due to Static Pressure Driving of Opened-Ended PHC Piles

    By Xiaocen Lu, Guowei Li, Jiantao Wu, Thang N. Nguyen, Andrew C. Amenuvor

    "This paper investigates the effect of driving a group of 52 open-ended Prestressed High Strength Concrete (PHC) piles on an existing highway embankment based on field measurements of excess pore pres

    Jan 1, 2016

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • DFI
    Identification and Quantification of Pile Relaxation

    By Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam

    Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of

    Jan 1, 2019

  • DFI
    Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In Virginia

    By Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed

    Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw

  • DFI
    Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big Dig

    By Paul Pedini

    The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth

    Jan 1, 2002

  • DFI
    Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations

    By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi

    Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2009

  • DFI
    Use of APG Piles for Support of New Hospital Replacement Wing in a Site Susceptible to Excessive Ground Settlement Ventura, California

    By Maria Flessas, Justin Ray, Danielle Steinmetz, Brian Zuckerman

    "The Ventura County Medical Center Hospital Replacement Wing project consists of the construction of a 2- to 3-story building with a basement encompassing the entire footprint and two corridors connec

    Jan 1, 2016

  • DFI
    Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System

    By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim

    "In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality

    Jan 1, 2005

  • DFI
    Probabilistic Subsurface Characterization for Transmission Line Foundation Design

    By Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok

    "Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc

    Jan 1, 2017

  • DFI
    Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban Developments

    By Abid Adekunte

    "Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa

    Jan 1, 2017

  • DFI
    Quality Control And Estimation Of Axial Resistance By Using An Expander Body, A Large-scale Pressuremeter

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    This paper describes the general principles of the expander body with post-grouting (EBI) system, and how it is similar in nature to a large-scale pressuremeter device. The results from the installati

  • DFI
    Extra Deep Cut-Off at 250 m Depth - A Case Study

    By Federico Pagliacci

    "Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa

    Jan 1, 2017

  • DFI
    Fundamentals First

    By Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler

    Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha

    Jan 1, 2019

  • DFI
    Analysis of Laterally Loaded Free-Head Pile Groups in Sand

    By Ashraf M. Eid

    Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall

    Jan 1, 2005

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.