Soil Grouting to Arrest Foundation SettlementBy Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Experimental Evidences From A Pile Load Test On A Driven Composite PileBy A. Garassino
A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe
Jan 1, 1991
-
Bore Pile Stabilization Issues in Offshore Marine WorksBy Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Innovative Cofferdams Used On The I-205 Columbia River BridgeBy Robert Bittner
The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for
Jan 1, 2013
-
Drivability Of Piles By VibrationBy Don C. Warrington
This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving
Jan 1, 1989
-
Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy ApplicationsBy Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown
"Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr
Jan 1, 2014
-
Technical Note Evolution Of Top Of Pile Measurement Techniques In Deep Foundation Static Load TestingBy Jon Sinnreich
Ensuring the accuracy of collected data during deep foundation static load tests is of paramount importance. Typically, pile head displacements are measured relative to a purpose-built reference syst
Jan 1, 2009
-
Evaluating Degree of Consolidation of Soft Soil by Using Asaoka, Hyperbolic and Back Analysis MethodBy Aminul Islam, Vinay M. Kumar
"About 100 Hectares of land reclamation over the very soft to soft marine clay at Uran Creek in Maharashtra is planned. The depth of marine clay varies from 10m to 24m as observed from the geotechnica
Jan 1, 2017
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The NetherlandsBy Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Recent Experiences With Bi-Directional Static Load TestingBy M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
-
2D and 3D Finite Element Analysis for Cantilever Slurry Walls in Cohesionless SoilBy Mostafa Mossaad, Ali Helwa, Manal Salem
Support of excavation (SOE) design practice tends to model SOE elements using two-dimensional (2D) analyses to avoid the complexity associated with three-dimensional (3D) analyses. Such practice overl
Jan 1, 2018
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret
Jan 1, 1989
-
Statnamic Load Testing Of High Capacity Marine FoundationsBy Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2005
-
A Contribution To The Behaviour Of Piled Raft FoundationsBy H. L. Jessberger
In recent years piled raft foundations of multi-storey buildings on weak soils have generated much interest and discussion. By taking account of the effects of each component of the system - the pile
Jan 1, 1991
-
History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982By Hal W. Hunt
Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng
Jan 1, 1984
-
Shaft End Bearing Capacity In Cavernous LimestoneBy Issa S. Oweis
Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t
Jan 1, 2009
-
Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000