Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    Erosion/Corrosion Effects on the Design and Maintenance of a Potash Refinery

    By J. Davis, M. G. Reading

    "INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t

    Jan 1, 1983

  • CIM
    Geology and Mineral Deposits of the Gallinas Mountains REE Deposit, Lincoln and Torrance Counties, New Mexico, USA

    By Virginia T. McLemore

    The Gallinas Mountains are in northern Lincoln County and southern Torrance County, New Mexico, USA where a series of alkaline igneous bodies, including porphyritic latite, trachyte/syenite, andesite,

    May 1, 2011

  • CIM
    Applications of fracture mechanics in failure analysis case studies

    By M. N. Bassim, W. W. Tennese

    "Concepts of linear elastic fracture mechanics were applied to study two cases of failure, namely an equalizing beam from a tandem rear axle of a highway tractor unit and the main beam of a flat bed t

    Jan 1, 1985

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Rubber Lining of Autogenous Mills at Sherman Mine

    By R. W. Watson, H. D. Peer

    "This paper outlines the history of steel linings in the Autogenous Mills, the factors influencing the decision to convert to rubber lining, and the operating and cost experience with the rubber liner

    Jan 1, 1981

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    The North American Iron Ore Industry A Decade into the 21st Century

    By J. D. Jorgenson

    ?? U.S. domestic production peaked at 120 Mt during years of the Korean Conflict120 Conflict ?? Pellet production increased, as highPellet high-grade ores decreasedores decreased ?? Until 1982 reces

    May 1, 2011

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Alimak Mining at the David Bell Mine

    By Andrew G. Patton

    The Alimak mining method was introduced at the David Bell mine in 1998 to extract an otherwise uneconomic and inaccessible reserve. The success associated with the extraction of these reserves led to

    Oct 1, 2001

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Inflation in project evaluation

    By L. D. Smith

    "Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and

    Jan 1, 1987

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011