Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geology of the Chatree Epithermal Gold Deposit, Thailand

    By V A. Diemar

    The Chatree Gold Project represents a greenfields discovery of metallurgically clean shallow gold mineralisation in a logistically simple terrain. Total Measured, Indicated and Inferred Resources are

    Jan 1, 1999

  • AUSIMM
    Technical Note - Polygonal Blocks of Influence in Triangular Grids

    For an exploration area with a predetermined grid of data points, a construction is given for elementary blocks which subdivide the entire area without omission or overlap, and with the property that

    Jan 1, 1985

  • AUSIMM
    Review of Trailings Dam Design and Construction Techniques in North America

    There are many factors influencing the way in which a mining company disposes of tailings. Some of the more important factors include physical and chemical properties of tailings, cost, availabilit

    Jan 1, 1989

  • AUSIMM
    Mineralisation of the Tom's Gully Gold Deposit, Northern Territory

    By Mizuta T, Sakurai M

    The Pine Creek Inlier produced 12 440 kg of gold in the period from the first gold discovery in the 1860s to the early-1900s. During the 1930s renewed large-scale prospecting took place and gave a

    Jan 1, 1994

  • AUSIMM
    Developments in the Use of Waikato Refractory Clays

    The refractory industry in New Zealand is small, consisting of two main manufacturers - one at Huntly and the other at Kamo. Together these would have an annual refractory production of about 30 000 t

    Jan 1, 1976

  • AUSIMM
    Resource Classification ù A Case Study From the Joffre Hosted Iron Ore of BHP Billiton Æs Mt Whaleback Operations

    It is recognised by the current JORC (1999) code that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological continuity and

    Jan 1, 2002

  • AUSIMM
    Investigation of Gas-Dynamics Processes and their Transience in Blast Furnaces

    By Ovchinnikov YN, Novikov VS, Spirin NA, Babushkin NM, Mysik AF, Shcherbatskii VB, Kukarkin AS

    Laboratory investigations were carried out to determine the resistance coefficient of the flow through beds irrigated with wetting and non-wetting liquids. A formula was obtained which may be used to

    Jan 1, 1975

  • AUSIMM
    The Impact of Landslides on the National Highway System in the Highlands Region

    The Highlands Region of Papua New Guinea has 3 major national highways. The locations of these national highways are shown in Figure 1. The Highlands Highway begins at Lae City on the coast and pas

    Jan 1, 1997

  • AUSIMM
    Recovery Optimisation at Oaky Creek Coal

    A simple production technique has been initiated and implemented at Oaky Creek open cut coal mine to optimise recovery of coal from the relatively thin geological seams. The production technique is ba

    Jan 1, 1990

  • AUSIMM
    Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave

    By P Nichols, C te Kloot, A Harrison

    Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/

    Nov 21, 2018

  • AUSIMM
    Dragline Digging Methods in Australian Strip Mines - A Survey

    By Baafi EY

    Open cut mining in Australia is facing the greatest challenge in its history in attempting to compete not only with other operations internationally, but also with underground operations domestically.

    Jan 1, 1998

  • AUSIMM
    Raise Drilling in Australian Coal Measures

    By Fraser RJ

    A Robbins Raise Drill Model 61R was used to provide one 7' diameter shaft 1050' deep in Clutha Development's exploratory mine at Blackwater in Central Queensland and two 7' diam

    Jan 1, 1972

  • AUSIMM
    Digital Simulation Model of Sub-Level Caving

    By Ham G. I, Just G. D

    The model considers a range of design parameters and operating condit- ions and evaluates the significance of these in the ultimate design of a mine. It also considers organizational features associ

    Jan 1, 1974

  • AUSIMM
    A Simulation Model of the Waste Handling System Proposed for the Lihir Project in Papua New Guinea

    By Ritter K-C, Sturgul J. R, Filess T

    The proposed Lihir open pit gold mine is located on Lihir Island in New Ireland Province, Papua New Guinea. The mine will be located within a volcanic caldera, part of which forms the adjacent Luise

    Jan 1, 1995

  • AUSIMM
    Use of Alkaline Industrial Wastes and Mine Tailings to Neutralise Acid Mine Drainage

    By I Doye

    Acid mine drainage is a serious environmental problem caused by the oxidation of sulfide minerals responsible for highly acidic, sulfate and metals-rich drainage. Several methods of mine waste managem

    Jan 1, 2003

  • AUSIMM
    ISO/TC 34/SC 16 horizontal methods for molecular biomarker analysis – molecular biomarker analysis and sampling management system

    By M D. Sussman

    A large number of countries in the world now have some regulation for labelling the presence of genetically modified organisms (GMO) in food. For the last ten years, ISO/TC 34/SC 16 has been providing

    May 9, 2017

  • AUSIMM
    Analysis of the melting behaviour of CaF2-free welding fluxes using hot thermocouple technique

    By S Basu, S L. A Gowravaram

    CaF2 has been a common constituent in a wide variety of welding fluxes, including those used for submerged arc welding (SAW). The widespread use of CaF2 stems from its role in lowering the liquidus te

    Jun 19, 2024

  • AUSIMM
    Shaft Sinking at Foster - Kambalda Nickel Operations

    Western Mining Corporation began shaft sinking operations at it's Foster orebody, south of Kambalda, on the 20th June, 1984. The top levels of the orebody are currently being mined via a decline

    Jan 1, 1985

  • AUSIMM
    Shell-supported Grinding Mill for the Ernest Henry Project

    Tumbling mills have been used in the minerals indusu) for occr WO years, with the design changing little, but the size of the individual pieces of equipment increasing significantly with the lowerin

    Jan 1, 1997

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011