Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Roof characterisation for hazard planning at Oaky North mine using geophysical data

    By B Vorster, T Medhurst, A Huey

    Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional

    Nov 29, 2022

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008

  • AUSIMM
    Integrated Communications for Surface and Open Pit Applications

    By G Booth

    Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope

    Jan 1, 2008

  • AUSIMM
    Protection of Sacred Sites in the Northern Territory

    The role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli

    Jan 1, 1984

  • AUSIMM
    Review of Some Recent and Current Open Cut R&D Projects

    By Brett J. R

    Some recent and current research and development projects relating to strip type open cut coal mining are reviewed. The projects include a dragline-hopper-truck mining system, an overburden slusher

    Jan 1, 1991

  • AUSIMM
    Comparison of Experiment and Simulation of Blast Loading on the Steel Beam

    By A Hosseinzadeh Barforoosh, A Abedi, M Taji

    The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t

    Aug 24, 2015

  • AUSIMM
    Planning for Optimal Post Mining Land Use

    By Thatcher R

    In areas where undeveloped land represents a scarce resource, an upgraded post mining land use can result in economic benefits to both the mining company and to the community. A study undertaken at

    Jan 1, 1987

  • AUSIMM
    Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in Jarosite

    By A M. L Smith, W E. Dubbin, K A. Hudson-Edwards

    Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an

    Jan 1, 2008

  • AUSIMM
    Planning for Optimal Post-Mining Land Use (bdec56ac-e3cb-4751-a0ca-697e767dce0d)

    By Thatcher R

    In areas where land suitable for development is a scarce resource, an upgraded post-mining land use can result in economic benefits to both the mining company and to the community.A study undertaken a

    Jan 1, 1990

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Sinking the New Broken Hill Consolidated Circular Airshaft

    The New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the

    Jan 1, 1940

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Planning revegetation for relinquishment

    By S D. Fox, P B. Swart

    Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc

    Jul 25, 2018

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021