Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021
-
Roof characterisation for hazard planning at Oaky North mine using geophysical dataBy B Vorster, T Medhurst, A Huey
Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional
Nov 29, 2022
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Digital mapping for rock mass discontinuities – opportunities and challengesBy J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song
Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc
Sep 1, 2024
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
Design of Copper-Cobalt Hydrometallurgical CircuitsCopper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni
Jan 1, 2008
-
Integrated Communications for Surface and Open Pit ApplicationsBy G Booth
Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope
Jan 1, 2008
-
Protection of Sacred Sites in the Northern TerritoryThe role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli
Jan 1, 1984
-
Review of Some Recent and Current Open Cut R&D ProjectsBy Brett J. R
Some recent and current research and development projects relating to strip type open cut coal mining are reviewed. The projects include a dragline-hopper-truck mining system, an overburden slusher
Jan 1, 1991
-
Comparison of Experiment and Simulation of Blast Loading on the Steel BeamBy A Hosseinzadeh Barforoosh, A Abedi, M Taji
The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t
Aug 24, 2015
-
Planning for Optimal Post Mining Land UseBy Thatcher R
In areas where undeveloped land represents a scarce resource, an upgraded post mining land use can result in economic benefits to both the mining company and to the community. A study undertaken at
Jan 1, 1987
-
Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in JarositeBy A M. L Smith, W E. Dubbin, K A. Hudson-Edwards
Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an
Jan 1, 2008
-
Planning for Optimal Post-Mining Land Use (bdec56ac-e3cb-4751-a0ca-697e767dce0d)By Thatcher R
In areas where land suitable for development is a scarce resource, an upgraded post-mining land use can result in economic benefits to both the mining company and to the community.A study undertaken a
Jan 1, 1990
-
Process Integration and Optimisation - A Case Study in Productivity ImprovementBy J Col, D La Rosa, W Valery, A Jankovic
Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and
Jan 1, 2007
-
Sinking the New Broken Hill Consolidated Circular AirshaftThe New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the
Jan 1, 1940
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011
-
On-Belt Analysis at Sepon Copper OperationBy T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
Planning revegetation for relinquishmentBy S D. Fox, P B. Swart
Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc
Jul 25, 2018
-
A Managed Approach to Project InsuranceHistorically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th
Jan 1, 2007
-
Empowering tailings operators through educationBy D Brett
The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i
Jul 1, 2021