Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • AUSIMM
    Synthesis of actinide chlorides for molten salt preparation

    By S Serp, M Duchateau, P Chevreux

    Molten salt reactor (MSR) is a promising advanced reactor system aiming to the transmutation of minor actinides such as americium in order to reduce the inventory of ultimate nuclear waste. The fuel i

    Jun 19, 2024

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work Program

    By T Bookless, J Pownell, D Meadows

    The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more

    Sep 26, 2013

  • AUSIMM
    Geometallurgical Evaluations of Mine Waste – an Example from the Old Tailings Dam, Savage River, Tasmania

    By L Jackson, A Parbhakar-Fox, N Fox

    "Characterisation of sulfide minerals (eg pyrite, sphalerite) in historic tailings can assist in determining whether there are economic benefits of reprocessing such materials using modern metallurgic

    Jun 15, 2016

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Submarine deposits of base and precious metals in Papua New Guinea

    The deep seafloor in Papua New Guinea's proposed Exclusive Economic Zone appears to be a gold-rich province in the same sense as the territory above sea level. Two significant sites with polymeta

    Jan 1, 1994

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    Chemical Leaching of Iron from Industrial Minerals

    By Falbo A, Barbaro M, Esposito MA, Passariello B

    Acidic reductive leaching is one of the best known and most widely employed chemical processes for beneficiating minerals of industrial interest. Conventional acidic leaching with sodium dithionite

    Jan 1, 1993

  • AUSIMM
    HIT – a Portable Field Device for Rapid Testing at Site

    By T Kojovic

    "The index A*b, determined from the Julius Kruttschnitt Mineral Research Centre (JKMRC) drop weight tester (DWT) results, has become well-known in the mining industry as a reliable measure of ore hard

    Oct 10, 2016

  • AUSIMM
    The Flow Properties of Colliery Spoil Rockpaste as Used in the Infilling of Abandoned Mine Workings (3bed0e3c-7be6-4717-a5a7-48443e75e4fa)

    By Jarvis ST

    Colliery spoil is the major constituent of colliery spoil 'rockpaste' which has been used to infill abandoned limestone mines in the West Midlands of England since the early-1980s. The oth

    Jan 1, 1998

  • AUSIMM
    High-voltage pulse pre-concentration study using a low-grade copper-gold ore

    By F Shi, W Huang, D Seaman, K Runge

    High Voltage Pulse (HVP) technology is a novel process that could potentially be the step-change needed in ore processability in the mining industry. The propensity of high voltage pulses towards mine

    Aug 29, 2018

  • AUSIMM
    Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt

    For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty

    Aug 21, 2012

  • AUSIMM
    The Resistance of Cyclone Underflow Material to Flow Liquefaction

    By J Boshoff, D Reid

    It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where

    Jul 27, 2015

  • AUSIMM
    Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant Performance

    By A L. Zawadski, B G. Putland

    "This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as

    Oct 10, 2016

  • AUSIMM
    Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha Mine

    By R Shrimali, P Rajmeny, L Shekhawat, A Joshi

    Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a

    Aug 24, 2015

  • AUSIMM
    Development and implementation of low-cost sensors and LiDAR for managing dust emissions due to mining activity

    By J Holdsworth, L Sutton, A Lavrinec, D Ilic

    Air quality is a big topic of discussion in regional mining communities as well as urban environments situated close to port terminals handling bulk solids. Community perception of poor air quality ca

    Sep 18, 2023