Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Telfer Commences Underground Mining - A Case StudyNewmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main
Jan 1, 1991
-
Synthesis of actinide chlorides for molten salt preparationBy S Serp, M Duchateau, P Chevreux
Molten salt reactor (MSR) is a promising advanced reactor system aiming to the transmutation of minor actinides such as americium in order to reduce the inventory of ultimate nuclear waste. The fuel i
Jun 19, 2024
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Modelling Blast Movement for Grade Control at an Open Cut Gold MineBy E J. Sellers, A Cocker
Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref
Aug 18, 2014
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Computational density functional theory study of triazine adsorption on sperrylite (100) surfaceBy X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini
There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou
Aug 24, 2022
-
Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work ProgramBy T Bookless, J Pownell, D Meadows
The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more
Sep 26, 2013
-
Geometallurgical Evaluations of Mine Waste – an Example from the Old Tailings Dam, Savage River, TasmaniaBy L Jackson, A Parbhakar-Fox, N Fox
"Characterisation of sulfide minerals (eg pyrite, sphalerite) in historic tailings can assist in determining whether there are economic benefits of reprocessing such materials using modern metallurgic
Jun 15, 2016
-
The design and implementation of the Kibali gold mine off-shaft developmentBy T Peters
The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with
Mar 29, 2023
-
Submarine deposits of base and precious metals in Papua New GuineaThe deep seafloor in Papua New Guinea's proposed Exclusive Economic Zone appears to be a gold-rich province in the same sense as the territory above sea level. Two significant sites with polymeta
Jan 1, 1994
-
Process Development for the Marampa Iron Ore Tailings Project, Sierra LeoneBy P Dunn
Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi
Jul 11, 2011
-
Chemical Leaching of Iron from Industrial MineralsBy Falbo A, Barbaro M, Esposito MA, Passariello B
Acidic reductive leaching is one of the best known and most widely employed chemical processes for beneficiating minerals of industrial interest. Conventional acidic leaching with sodium dithionite
Jan 1, 1993
-
HIT – a Portable Field Device for Rapid Testing at SiteBy T Kojovic
"The index A*b, determined from the Julius Kruttschnitt Mineral Research Centre (JKMRC) drop weight tester (DWT) results, has become well-known in the mining industry as a reliable measure of ore hard
Oct 10, 2016
-
The Flow Properties of Colliery Spoil Rockpaste as Used in the Infilling of Abandoned Mine Workings (3bed0e3c-7be6-4717-a5a7-48443e75e4fa)By Jarvis ST
Colliery spoil is the major constituent of colliery spoil 'rockpaste' which has been used to infill abandoned limestone mines in the West Midlands of England since the early-1980s. The oth
Jan 1, 1998
-
High-voltage pulse pre-concentration study using a low-grade copper-gold oreBy F Shi, W Huang, D Seaman, K Runge
High Voltage Pulse (HVP) technology is a novel process that could potentially be the step-change needed in ore processability in the mining industry. The propensity of high voltage pulses towards mine
Aug 29, 2018
-
Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed TomographyBy I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt
For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty
Aug 21, 2012
-
The Resistance of Cyclone Underflow Material to Flow LiquefactionBy J Boshoff, D Reid
It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where
Jul 27, 2015
-
Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant PerformanceBy A L. Zawadski, B G. Putland
"This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as
Oct 10, 2016
-
Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha MineBy R Shrimali, P Rajmeny, L Shekhawat, A Joshi
Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a
Aug 24, 2015
-
Development and implementation of low-cost sensors and LiDAR for managing dust emissions due to mining activityBy J Holdsworth, L Sutton, A Lavrinec, D Ilic
Air quality is a big topic of discussion in regional mining communities as well as urban environments situated close to port terminals handling bulk solids. Community perception of poor air quality ca
Sep 18, 2023