Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek MineBy Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Methods Used To Monitor Roof Geology And Entry SupportsBy James M. Tennant
In the mid 1970's, American Electric Power significantly expanded its internal coal production. This involved opening several large mines in seams that had never been mined on a large commercial
Jan 1, 1982
-
Design And Planning Of Lower Seam Longwall GateroadsCase study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be
Jan 1, 1995
-
Prediction Of Rock Cutting Performance Using Fracture Mechanics Principles - A Review (0b1a12ed-9606-4d46-b68d-eea006d52e76)By Gexin Sun
This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process of
Jan 1, 1992
-
Pillar Design - Continuous Miner Butt Section And Longwall Development SectionsBy Lawrence R. Artler
The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"
Jan 1, 1984
-
Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)By S. Bensehamdi
An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur
Jan 1, 1992
-
Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008By Anthony T. Iannacchione
Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5
Jan 1, 2011
-
Floor Heave in Shallow Room-and-Pillar MiningBy André Zingano
This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40
Jan 1, 2002
-
Effect of the Approaching Longwall Faces on Barrier and Entry StabilityBy Klaus-Dieter Beck
RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred
Jan 1, 2004
-
Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead LineBy Axel Preusse
A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate
Jan 1, 2003
-
Bolt Load Changes During Initial Face Advance And Cross-Cut BreakthroughBy Steve Signer
The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w
Jan 1, 2004
-
Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case StudyBy Lance R. Barron
The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th
Jan 1, 1990
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Hazard Mapping Combining Geostatistical Modeling Of Coal Mine Roof Quality Ratings With Numerical Modeling Of Stress DataBy J. Riefenberg
U.S. Bureau of Mines (USBM) researchers are developing a personal computer-based hazard mapping system for use in underground coal mines. Hazard mapping is rapidly gaining interest as delineating area
Jan 1, 1994
-
Shear Bond Characteristics in Grouted Cable BoltsBy Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Image Analysis Development And Application To Fracture Pattern AnalysisBy Ali Benbia
The paper shows results from the physical modelling of longwall excavations concentrating on the fracture pattern development above longwall panels. The modelling technique is briefly described and th
Jan 1, 1993
-
Geomechanical Substantiation Of Extraction Of Undermined Ore DepositBy M. V. Kurlenya
The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo
Jan 1, 1990
-
Multiple-Seam Mining - A State-Of-The-Art ReviewBy Chris Haycocks
The relevant literature concerning ground control, mine planning and reserve conservation in multi- seam mining is reviewed. Factors affecting interaction, interaction mechanisms, and design guideline
Jan 1, 1990
-
Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)By Wilfried Ufer
[1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl
Jan 1, 1984
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine