Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Seam Structure - An Important Criterion for Coal Pillar DesignBy Kot F. v. Unrug
In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m
Jan 1, 2005
-
An Analytical Approach For The Estimation Of Pillar StrengthA procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
Evaluation of Anchorage Integrity for Grouted Bolts in Weak StrataBy W. C. Smith
Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c
Jan 1, 1987
-
The Elimination of Rock-fall Fatalities in Ontario Hardrock MinesBy Douglas Morrison
Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te
Jan 1, 2003
-
Change in Primary Roof Support System at Quarto Mining Company's Powhatan No. 4 Mine Results in Improved Safety, Productivity and CostsBy Michael J. Peacock
The Powhatan No. 4 Mine is located in southeastern Ohio along the Ohio River in Monroe County. The mine produces approximately 3.2 million tons of steam coal annually from the Pittsburgh No. 8 seam. T
Jan 1, 1986
-
New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)By Chris Mark
The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi
Jan 1, 2002
-
A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element ModellingBy A. K. Bhattacharyya
The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar
Jan 1, 1992
-
Single Point And Full Scale Laboratory Testing Of Timber Chock ConstructionBy Jim Galvin
4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri
Jan 1, 2000
-
Influence of joints on the elastic response of a LFUFL stope to FEM miningBy W. G. Pariseau
A new approach to the direct inclusion of the effects of joints and geologic structure in rock mechanics analyses is applied to an elastic analysis of stability of a Lucky Friday undercut and 4111 lon
Jan 1, 1989
-
Probabilistic Stability Analysis Of Embankments And Slopes (1006fe25-ccb9-48a0-86b2-57e4779408ba)By Rossen A. Halatchev
This study introduces a new probabilistic approach to seismic stability analysis of embankments and slopes. The approach is based on Sarma's solution, which is modified through presentation of th
Jan 1, 1992
-
Numerical and Physical Modeling as Planning Tools for Rockbolted RoadwaysBy Peter Griesenbrock
In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo
Jan 1, 2002
-
Evaluation Of Mobile Roof Support TechnologiesBy Hamid Maleki
This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l
Jan 1, 2001
-
Time Dependent Strength Of Coal Strata For Long-Term Pillar StabilityBy Z. T. Bieniawski
A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest
Jan 1, 1994
-
Detection and Monitoring of Surface Subsidence Associated with Mining Activities in the Witbank Coalfields Using Differential Radar InterferometryBy Gift Makusha
Surface subsidence associated with coal mining activities in the Mpumalanga Province of South Africa changes the natural environment in several ways, and current challenges for mining companies includ
Jan 1, 2011
-
Selection of Pumpable Cribs for Longwall Gate and Bleeder EntriesBy Alan A. Campoli
"Pumpable crib support for longwall gates and ventilation bleeder entries is becoming more prevalent in United States coal mines (Figure 1). The pumpable crib selection and spacing design has been gre
Jan 1, 2015
-
Tensioned Cable Bolts As Primary Support: UpdateBy John C. Stankus
At the 19th International Conference on Ground Control in Mining, a paper was presented detailing new types of Jennmar INSTáL tensionable cable bolts (Stankus and Taylor, 2000). Since that time, signi
Jan 1, 2001
-
Evaluation of the Point Load Strength for Soft Rock ClassificationBy B. (Mamas) Das
A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech
Jan 1, 1984
-
In-Situ Pillar Strength Determination for Two-Entry Longwall GatesBy H. N. Maleki
Extensive measurements and underground observations in three Western U. S. coal mines are integrated in this paper to determine in-situ pillar load-deformation characteristics for narrow (30 it wide,
Jan 1, 1988
-
Roof Bolting for Long-Term Entries in Underground Coal MinesBy Peter Zhang
As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch
Jan 1, 2011
-
Entry Design For Optimum Stability In A Multi-Seam EnvironmentBy Mohummad Akram
Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was
Jan 1, 1993