Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)

    By D. L. Price

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog

    Jan 1, 1992

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal Mines

    By Rene Rodriguez

    Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ

    Jan 1, 1994

  • SME-ICGCM
    Geological Conditions At Continuous Miner Sections; Examples From Marrowbone Development Company, Mingo County, West Virginia

    By J. Marc Coolen

    Marrowbone Development Company operates a large drift mining complex in the central Appalachian coal field. In 1997, five continuous miner supersections produced close to 9 million tons of raw plant f

    Jan 1, 1999

  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Design Of Lower Seam Longwall Operations In Multiple Seam Mining

    By P. Forrest

    Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie

    Jan 1, 1988

  • SME-ICGCM
    Control Of Mine Subsidence Utilizing Coal Ash As A Backfill Material

    By D. W. Evans

    Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method

    Jan 1, 1982

  • SME-ICGCM
    Effect of In Situ Stresses on the Stability of Coal Mine Development Workings

    By Murali Gadde

    Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat

    Jan 1, 2004

  • SME-ICGCM
    Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.

    By Styles P.

    To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est

    Jan 1, 1992

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Weatherability Test of Rocks for Underground Mines

    By Kot F. Unrug

    The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit

    Jan 1, 1997

  • SME-ICGCM
    Design Factors In Near-Seam Interaction

    By A. Grenoble

    The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr

    Jan 1, 1984