Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)By Russell C. Frith
This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b
Jan 1, 1992
-
The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - IntroductionBy Robert C. Speck
Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo
Jan 1, 1981
-
Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall PanelsBy Kenneth Rigsby
Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi
Jan 1, 2003
-
A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate RoadBy Stephen P. Signer
A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r
Jan 1, 1990
-
Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)By D. L. Price
This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog
Jan 1, 1992
-
Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic SurveyBy Wolfgang Schott
The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h
Jan 1, 2003
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997
-
Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal MinesBy Rene Rodriguez
Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ
Jan 1, 1994
-
Geological Conditions At Continuous Miner Sections; Examples From Marrowbone Development Company, Mingo County, West VirginiaBy J. Marc Coolen
Marrowbone Development Company operates a large drift mining complex in the central Appalachian coal field. In 1997, five continuous miner supersections produced close to 9 million tons of raw plant f
Jan 1, 1999
-
Development Of A Subsidence Database And Determination Of Subsidence ParametersBy Syd S. Peng
A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us
Jan 1, 1995
-
Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock SaltBy Chris T. Franke
The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation
Jan 1, 1997
-
Design Of Lower Seam Longwall Operations In Multiple Seam MiningBy P. Forrest
Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie
Jan 1, 1988
-
Control Of Mine Subsidence Utilizing Coal Ash As A Backfill MaterialBy D. W. Evans
Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method
Jan 1, 1982
-
Effect of In Situ Stresses on the Stability of Coal Mine Development WorkingsBy Murali Gadde
Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat
Jan 1, 2004
-
Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.By Styles P.
To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est
Jan 1, 1992
-
Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)By Deno Pappas
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr
Jan 1, 2002
-
Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar BehaviourBy I. L. Follington
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to
Jan 1, 1992
-
Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)By Thomas M. Barczak
The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili
Jan 1, 2000
-
Weatherability Test of Rocks for Underground MinesBy Kot F. Unrug
The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit
Jan 1, 1997
-
Design Factors In Near-Seam InteractionBy A. Grenoble
The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr
Jan 1, 1984