Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Rockburst Control Measures at INCO's Creighton Mine

    By P. Oliver

    Rockburst conditions were first encountered at Inco's Sudbury area operations in the mid 1930's when mining advanced to below the 610 m (2000 ft.) horizon. Now, mining is being carried out a

    Jan 1, 1987

  • SME-ICGCM
    The Ground Response Curve, Pillar Loading and Pillar Failure in Coal Mines

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The response of the surrounding rock mass to the creation of mining excavations determines the ultimate load on a pillar support system. In conditions where the ground is relatively soft and weak, th

    Jan 1, 2010

  • SME-ICGCM
    An Area Calculation of the ARBS Support Intensity

    By Ihsan B. Tulu, Keith A. Heasley, Aanand Nandula

    "The objective of this paper is to present the development of a software tool that will assist in an area calculation of the Analysis of Roof Bolting Systems (ARBS) support intensity while incorporati

    Jan 1, 2018

  • SME-ICGCM
    An Overview Of Bureau Of Mines Ground Control Research

    By John M. Karhnak

    The Bureau of Mines has a long history of research in Ground Control. For many years, this work was done at Bureau facilities by Bureau researchers. As the tiles changed, however, the area of research

    Jan 1, 1981

  • SME-ICGCM
    Ground Control Design For Multiple Seam Mining Using Finite Element Analysis

    By John Stankus

    Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre

    Jan 1, 1999

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    Fundamental Principles of an Effective Reinforcing Roof Bolting Strategy in Horizontally Layered Roof Strata and Areas of Potential Improvement

    By Martin McKinnon, Guy Reed, Russell Frith

    "It is arguable that the development of reinforcing roof bolting systems has largely stagnated in recent times, primarily due to the prevailing industry view that few, if any, further improvements can

    Jan 1, 2017

  • SME-ICGCM
    Effects of Overburden Characteristics on Dynamic Failure in Underground Coal Mining

    By Douglas Tesarik, Mark K. Larson, Habte Abraham, Heather E. Lawson

    Dynamic failures, or "bumps", remain an imperative safety concern in underground coal mining, despite significant advancements in engineering controls. While many factors have been empirically linked

    Jan 1, 2016

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    SDPS For Windows: An Integrated Approach To Ground Deformation Prediction

    By David Newman

    The latest version of the Surface Deformation Prediction Software (SDPS) package is presented through its application to a number of case studies. The package now exploits all the benefits of the Micr

    Jan 1, 2001

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Critical Appraisal Of Pillar Design As Required By Coal Mines Regulations Of India VIS-VIS Latest Rock Mechanics Formulae

    By S. K. Sharma

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae, Equivalent material modelling was the approach

    Jan 1, 1992

  • SME-ICGCM
    Roof Geotechnical Properties for Roof Control Purposes in Illinois Coal Field

    By Abdolreza (Reza) Osouli

    Determining the roof stability condition of underground coal mines in the Illinois Basin is sometimes very challenging. The roof stability of Illinois mines are mostly affected by two types of shales:

    Jan 1, 2014

  • SME-ICGCM
    Analysis of Cutter Roof Using the Boundary Element Method

    By Mikko Ahola

    This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac

    Jan 1, 1987

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Mining Subsidence Of An Urban Area In Ipswich, Queensland (3581bf43-8b41-4e5e-a797-55082bdbc493)

    By D. J. Maconochie

    This paper describes the investigations and results of monitoring of deformations of houses located within the area of influence of a pillar collapse over the Westfalen No. 3 coal mine near Ipswich, Q

    Jan 1, 1992

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Estimating Coal Pillar Strength for Low Coal Seam

    By Andre Cezar Zingano

    "The objective of this paper is to estimate the coal seam strength and the pillar safety factor for low coal seams using back analysis and rock mass characterization. The coal seam strength is very im

    Jan 1, 2015