Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    An Overview of Capital and Operating Cost Estimation Techniques for Heap Leach Projects

    By William E. Cobb

    15.1 INTRODUCTION The mine development process, as discussed in Chapter 2, is a series of data gathering and analysis steps. As the mine development process proceeds, information about the geology, m

    Jan 1, 1988

  • SME
    Sustainable Drilling For Oil And Gas: Challenging Drilling Environments Demand New Formulations Of Bentonite Based Drilling Fluids

    By V. C. Kelessidis

    Demand for multifunctional drilling fluids continuously increases. In the quest for more hydrocarbons, drilling has extended to deep water areas (now in excess of 2.000 m) and to very deep wells (now

    Jan 1, 2007

  • SME
    Procedural Aspects of Grouting Shafts, Tunnels and Drifts

    By Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams

    The STG integrated method of grouting can be divided into the several phases as outlined in preceding chapters. For convenience in describing technical procedures, they can be grouped as: 1. Investig

    Jan 1, 1993

  • SME
    Valorization from waste: Combined reduction of chromite ore-processing tailings and subgrade manganese ore to produce 200 series stainless steel scrap

    By NILAMADHABA SAHU, Gajanan U. Kapure, Pankaj Kumar, Sunil Kumar Tripathy

    Chromite ore processing tailings and low-grade manganese ores are typically considered waste due to their limited or negligible utility, leading to environmental and storage concerns. Researchers glob

    May 1, 2024

  • SME
    Geology Of The Black Fox Mine Matheson, Ontario, Canada

    By E. J. Berentsen, R. F. Nanna, D. Dell’ Elce, R. Lougheed

    Apollo Gold’s Black Fox project is located 10 km (6.2 miles) east of Matheson, Ontario, Canada, on Hwy 101 East It is located within the prolific Destor Porcupine Fault Zone, which is also the host fo

    Jan 1, 2004

  • SME
    The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway Tunnels

    By Jens Classen, Thomas Kurth, Karl G. Holter

    High performance sprayed concrete equipment installed on two 9.4 m diameter hard rock TBMs enabled a continuous sprayed concrete lining for the entire contour in both tunnels to be performed concurren

    Jan 1, 2003

  • SME
    Estimation of pre-mining conditions for trace metal mobility in mineralized areas: An overview

    By Charles N. Alpers, D. Kirk Nordstorm

    A variety of approaches have been used in the recent literature for the estimation of pre-mining (or natural background) metal concentrations in areas affected by mining. The following is a list of so

    Jan 1, 2000

  • SME
    Liberation modeling and parameter estimation for multicomponent mineral systems

    By R. K. Mehta, G. T. Adel

    A review of the literature reveals that methods for simulating the coupled behavior of size reduction and liberation are limited to binary mineral systems containing one composite particle class. The

    Jan 1, 1991

  • SME
    Comparative Evaluation Of Conventional And Resin Bolting Systems

    By George J. Karabin

    Over the past few years, the use of fully grouted bolts to support the roof of underground openings has increased dramatically. While conventionally anchored bolts effectively reinforce the strata of

    Jan 1, 1976

  • SME
    Application Of A New Synthetic Reagent For Treatment Of Complex Sulphides: Results Obtained At The Sotiel Plant (Spain)

    By A. M. Marabini, G. Belardi, V. Alesse, M. Acosta

    Sotiel mine is situated in the Iberian Pyrite Belt in southern Spain, some 40 km north of the port of Huelva. Although mining operations at the site date back to Roman times, the present mine came int

    Jan 1, 1995

  • SME
    Should discounted cash flow projections for the determination of fair market value be based solely on proven and probable reserves? (1c5a4eae-a519-4990-a14e-97d602d3d0e8)

    By Ross D. Lawrence

    Suggestions have been made that the appraisal of mining assets using discounted cash flow techniques should be based solely on proven and probable reserves in reliance upon the widespread internationa

    Jan 1, 2002

  • SME
    Off-Highway Truck Body True Capacity . . . Why Can’t I Get Rated Payload On My Off-Highway Trucks Without Hungry Boards And Tail Extensions?

    By L. Hagenbuch

    Off-highway truck purchasers know the amount of tonnes, pounds, kilograms, etc, a truck will carry. However just because a truck is rated at 240 tons may in no way correlate to what that truck will a

    Jan 1, 2002

  • SME
    Plant Waste and Environmental Considerations

    By John G. Groppo, Bonnie Webb-Groppo

    INTRODUCTION The first portion of this chapter is concerned primarily with the contamination aspects of fine coal cleaning that include both the solids and water discharged as waste products after c

    Jan 1, 1991

  • SME
    Hydroalkaline Processing Of High-Silicon Bauxites

    By Leonid P. Ni, Askar M. Kunayev

    It is well known that processing of the high-silicon bauxites for obtaining alumina by the hydrochemical Bayer process is irrational due to the significant losses of alumina and alkali with red mud. T

    Jan 1, 1984

  • SME
    Social And Economic Feasibility Analysis For Uses Of Underground Space

    By Richard M. Michaels

    In considering the use of underground space for civil works functions, there are several criteria that must be met if transfer of any of them is to occur. It is important to recognize that these crite

    Jan 1, 1974

  • SME
    Stability Analysis of the VCR Study Stope at The Homestake Mine

    By F. Duan, W. G. Pariseau, C. S. Schmuck

    Three dimensional comparisons between calculated and measured displacements in the hanging wall of a rock mechanics study region at the Homestake Mine show correlation coefficients of 0.7 or higher. T

    Jan 1, 1987

  • SME
    Longwall Mining Near an Impoundment Embankment - A Case Study

    By Donald D. Born

    Mine No. 95 is located in Harrison County about 5 miles west of Shinnston, WV, with coal properties covering the northwest corner of Harrison County and the southwest corner of Marion County and with

    Jan 1, 1986

  • SME
    The Time-Dependent Compaction of Porous Rocks and Its Consequences for Laboratory Testing

    By John F. Schat, T. William Thompson

    Laboratory data on the time-dependent compaction of porous rocks are presented, and various attempts to model this behavior are described. These lead to a discussion of the problems that arise in usin

    Jan 1, 1986

  • SME
    HILTI Powder Actuated Tool Technology And Applications In Us Underground Gassy Mines

    By J. Pinkley

    In June of 2002 Hilti North America received the first MSHA permissible approval for usage of a powder actuated tool device in a gassy mine atmosphere. The purpose of this paper is to discuss the imp

    Jan 1, 2008

  • SME
    What The Mining Industry Wants From Technical Software

    By Betty L. Gibbs

    Computer software for mining applications has been in development since before 1970. These packages cover tasks from exploration data management through final reclamation planning. These programs were

    Jan 1, 1999