Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Open Pit TBM Driven Drainage Tunnel?Ok Tedi MineBy Tony Peach
Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost
-
Keeping an Eye on Safety Improves the Bottom LineBy Steve Kral
Worker safety is an issue that transcends industries, whether it be mining, construction, manufacturing or even general office work. In the mining industry, safety and training are particularly impor
Jan 1, 2003
-
Mining Phospates in Yunnan - Potential is Great, But So Are ProblemsRecent accelerated exploration efforts in southwest China have progressively quantified the vast phosphate resources in the Yunnan Province. To date, according to Chinese geologists, potential reserve
Jan 3, 1980
-
The Application Of Automation In Modern Mining Analytical LaboratoriesBy Andre Balt, Pierre Hofmeyr
It is only recently that automation has been applied to mining analytical laboratories. This paper describes the use of automation in the laboratory analytical process of hard-rock mining and geologic
Jan 1, 2005
-
Solvent Extraction Of Al(III) From Sulfate Solutions Using Bis (2,4,4-Trimethylpentyl) Phosphinic Acid - Mechanism And ComplexationBy D. Mohapatra
Extraction of Al(III) from aqueous sulfuric acid solutions into organic Cyanex 272®-carbon tetrachloride systems was investigated from a multi-component mixture containing aluminum, cobalt and nickel.
Jan 1, 2008
-
Rock Remediation Techniques For Mining And Quarry OperationsBy Daniel Journeaux
Introduction Daniel Journeaux is President of Janod Incorporated. Janod is a family owned and operated company that has been working in the field of slope stabilization since 1970. Daniel has worke
Jan 1, 2005
-
A Commentary on the Reporting of Coal Exploration Results, Resources and ReservesBy S. Rupprecht
"This article addresses the prevalence of poor public reporting practices of coal exploration results, coal resources and coal reserves in southern Africa. Currently, the reporting of coal tonnage wit
Jul 1, 2019
-
Underground Construction Photography: Documenting a Success StoryBy Susan L. Bednarz
Recent advances in digital cameras and image processing allow photographers to produce excellent high-resolution action shots in low light and high contrast conditions commonly encountered underground
Jan 1, 2008
-
Aynak: A World-Class Sediment-Hosted Copper Deposit, AfghanistanBy S. Coats, G. Norton, A. Benham, P. Ková
The Aynak copper deposit, located 30 km south of Kabul in Afghanistan (Figure 1), was discovered by Soviet geologists in the 1970s. Extensive exploration undertaken in the area between 1974-80 include
Jan 1, 2007
-
Application Of Ac Induction Motors With Variable Frequency DrivesBy B. J. Sauer
Variable frequency drives (VFD’s), or adjustable frequency controls (AFC’s) as they are more precisely identified, have been available to the mining industry for over 20 years. However, in recent yea
Jan 1, 2002
-
The Mechanism of Grouting Reinforcement of Broken Rocks Surrounding the Gob-Side Retained EntryIn this paper, uniaxial compression tests were conducted on intact rocks and broken rocks that were reinforced by grouting, and the effects of grouting on the strength of broken rocks were analyzed. T
Jul 28, 2020
-
Ten years of conducting level 1 simulated emergency exercises in Queensland?s underground coal minesThe inquiry into the explosion at the Moura No. 2 Mine in August 1994 recommended -?Emergency procedures should be exercised at each mine on a systematic basis, the minimum requirement being on an ann
Jan 1, 2009
-
Software For Hydrologic Monitoring Of In Situ Leaching OperationsBy Peter K. Mathison
The U. S. Department of Interior, Bureau of Mines (Bureau) is developing a hydrologic monitoring system for in situ leaching operations. A working prototype of this system was installed and tested at
Jan 1, 1992
-
Surface Force Measurements Between Precious Metals Under Controlled Potential ConditonsMany investigators measured surface forces between hydrophobic macroscopic surfaces using atomic force microscope (AFM). Some investigators observed long-range attractions and attributed them to the p
Jan 1, 2012
-
A Critical Analysis of Overcoring Stress Measurements from US Underground Coal MinesBy J. A. Rusnak, M. M. Gadde, S. S. Peng
In situ stresses are one of the key inputs to a successful underground excavation design. Because of the complex mechanisms involved in arriving at the current state of stress at a point in the Earth’
Jan 1, 2006
-
San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger ShieldBy Brett Campbell
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa
Jan 1, 2008
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsBy Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
Bottom Stability of Shafts with Cohesive Soil Plugs Overlying an Artesian AquiferBy Steven W. Hunt, Safdar A. Gill
Design and construction of temporary shafts for underground facilities often require evaluation of bottom stability due to rupture (blow-ins) caused by water pressure acting on a bottom plug. This pa
Jan 1, 1997
-
Design And Construction Of Lake Mead Intake No. 3 Shafts And TunnelBy Jon Hurt
INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3