Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Inconsistency in gravimetric sampling pumps and cyclones

    By R. J. R. Cornelissen

    The elimination of the incidence of silicosis in employees in industries such as mining and pottery is an ongoing international initiative. After many decades of industrial activity in these industrie

    Jan 1, 2009

  • SME
    Performance Characteristics For Welded Wire Screen Used For Surface Control In Underground Coal Mines - Preprint 09-104

    By D. R. Dolinar

    The fall of small pieces of rock between roof bolts causes over 80 pct of the ground fall injuries in underground coal mines. Roof screen, if installed on the bolting cycle, can significantly reduce

    Jan 1, 2009

  • SME
    Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer Settler

    By B. Gigas, M. Preston, M. Giralico

    Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability

    Jan 1, 2004

  • SME
    Brightwater Conveyance System Will Expand Seattle?s Wastewater Treatment

    By John E. Newby

    Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide

    Jan 1, 2007

  • SME
    Big Truck and Big Tire – Caterpillar and Michelin

    By Tim O’Neil

    If you build a big truck, build a big tire to match it. Let that haulage synergy aid the economics, productivity and lessened maintenance for the unit. Now, Cater-pillar and Michelin have done just

    Jan 1, 2002

  • SME
    Creating A New Work Environment Through HF/E - Design Considerations For A Successful Control Room Project

    By I. Nimmo

    Since the beginning of Aluminum mining and refining the industry has lived with distributed control rooms and suffered from many behavioral problems common with this design. When Human Factor/Ergonomi

    Jan 1, 2011

  • SME
    Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake Mine

    By Z. J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda

    Jan 1, 2011

  • SME
    Three-Dimensional Cfd Modeling Of Purging From Refuge Chamber

    The MINER Act of 2006 mandated that all underground coal mines must install and maintain refuge chambers. Refuge chambers serve as a temporary shelter in case of emergency. Several factors affect the

    Feb 27, 2013

  • SME
    Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project

    By Jean Habimana

    The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather

    Jan 1, 2008

  • SME
    Has Minerals Industrial Technology Peaked?

    By Robin J. Batterham

    We still need to innovate, but it is getting harder. The real price of metals is declining, return on shareholder value is lower than other industries, and there is a shorter-term focus on staying via

    Jan 1, 2004

  • SME
    Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping Operations

    By R. Bauer

    Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c

    Jan 1, 2007

  • SME
    Mill Feed: By 8 m Ore Block Assay, Or By 8 cm Rock Sensing? Sorting Technology Can Fill The Gap Between Mine And Mill.

    By G. Van Weert

    Mining project feasibility is projected from a geological model and a mining plan. Ore grade is assumed to be continuous, based on drill hole assays as much as 80 m apart. Eighty meter is 80,000,000 m

    Jan 1, 2008

  • SME
    Horizontal directional drilling implementation at MIMOSA Mines

    By M. Santillan

    Minerales Monclova S.A. de C.V. (MIMOSA) has applied different methane gas drainage technologies, according to the top industry requirements in order to keep the methane gas at the lowest possible con

    Jan 1, 2009

  • SME
    Raw Ore Selection By Artificial Vision (cc61426b-f93b-4b6c-89d5-720512c7133c)

    By P. Massacci, F. La Marca, G. Bonifazi

    Certain deposits of incoherent materials which are near the surface and exploitable by open-pit mining may be characterized in real time before they are mined through an analysis of ground-surface ima

    Jan 1, 1999

  • SME
    Enhanced Fire Escape Training For Mine Workers Using Virtual Reality Simulation - Preprint 09-126

    Recent U.S. mine disasters identified a need for improved training of miners in escape from mine fires and explosions. Researchers at the National Institute for Occupational Safety and Health?s (NIOS

    Jan 1, 2009

  • SME
    DREYER AWARD - How Orebodies are Found

    By J. David Lowell

    The first part of this article is a review of industry techniques and styles during the past 50 years. It is followed by my career history during the same period. The second part covers my ideas abo

    Jan 1, 2000

  • SME
    Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking

    By Peter van Dijk, Gary Almeraris, Philip Rice

    This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A

    Jan 1, 2001

  • SME
    Practical Applications For The Silicon Drift X-Ray Detector In SEM-Platformed Image Analysis: The Bruker-MLA In Practice

    Preface The intention of this paper is to provide the reader with knowledge gained here at Memorial University regarding the practical use of the Bruker SDD x-ray detector for applications in image a

    Jan 1, 2007

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • SME
    Differences In Design Considerations For Tunnel Vs. Mine Ventilation Fan Systems -Preprint 09-056

    By G. A. Gamble

    Fans used to ventilate subway, passenger rail and vehicular tunnels are similar to the fans used to ventilate underground mines. However, tunnel ventilation fan systems are typically designed to meet

    Jan 1, 2009