Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Keynote Address: Coal Mining - The Future - IntroductionBy R. P. Mohring
Before we look at what the challenges and opportunities for future coal mining will be, it is appropriate to have a look at whether there will be a coal industry in the future. There is much talk abo
Jan 1, 2001
-
A Risk Consequence Approach To Open Pit Slope DesignBy P.J. Terbrugge
Open pit slope design has conventionally been effected as a bottom-up function utilizing available geotechnical information. This results in a decision criterion based on probability of failure and fa
Jan 1, 2006
-
Hybrid Energy Flotation?? On The Optimization Of Fine And Coarse Particle Kinetics In A Single Row - SynopsisBy D. Govender
Theoretical flotation models suggest that there is a positive relationship between bubble-particle collision rates and turbulent kinetic energy dissipation. Fine particle flotation performance is gene
Jan 1, 2013
-
Single Level Extraction At KoffiefonteinBy R. L. Pienaar
Paper written on project work carried out in partial fulfilment of B Eng (Min. Eng.) degree A study was conducted to investigated and compare the feasibility of two single level extraction layouts
Jan 1, 2006
-
Strain-softening behaviour of a schistose rock under triaxial loadingBy A. Varadarajan, M. Hashemi, K. G. Sharma
Quartz mica schist collected from Nathpa-Jhakri Hydropower Project, Himachal Pradesh, North India is tested under triaxial loading using a servo-controlled loading system. Complete stress-strain-volu
Jan 1, 2003
-
Applications of seismic hazard assessment methods in minesBy G. van Aswegen
Large structures in mines (faults, dykes, pillars, abutments) fail when the load exceeds the strength. If the loading system stiffness (LSS, also referred to as the ‘local mine stiffness’) is lower th
Jan 1, 2003
-
Management Of A Major Slope Failure At Nchanga Open Pit, Chingola, Zambia. - Synopsis:By SDN Wessels, WA Naismith
On 16 July 2004, at 07:10 a collapse of about 1.8 million m3 (about 4 ½ million tonnes) took place on the north wall on Nchanga Open Pit This collapse was the result of a developing instability th
Jan 1, 2005
-
Hydraulic mining of an in situ heavy mineral ore reserveBy M. Berger
The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at
Jan 1, 2003
-
What Is The Best Energy-Delivery System For Hand-Held Stope Drilling And Associated Equipment In Narrow-Reef Hard Rock Mines? ? SynopsisBy P. J. Petit
Changing mining conditions, legislative issues, rising costs, and the constrained supply of skills and electricity in South Africa, have been some of the criteria forcing mine operators and engineers
Jan 1, 2013
-
Sulphuric Acid Leaching Of Zinc And Copper From Nigerian Complex Sulphide Ore In The Presence Of Hydrogen PeroxideBy P. A. Olubambi
The leaching of zinc and copper from Nigerian bulk sulphide ore with sulphuric acid in the presence of hydrogen peroxide was studied. The aim of the study was to investigate the effectiveness of hydr
Jan 1, 2006
-
Grain Size Modelling Of A Low Carbon Strip Steel During Hot Rolling In A Compact Strip Production (CSP) Plant Using The Hot Charge RouteBy W. Stumpf
Mill log analyses and complementary hot deformation studies were carried out on the as-cast structure and on a hot rolled structure of the same low carbon steel (SAE 1006) that had been processed acco
Jan 1, 2003
-
Risks Associated With Rockpasses In Deep-Level Tabular Mines Based On Historical Pass PerformanceBy W. C. Joughin
Problems with the stability and performance of rockpasses in deep-level mines are common. This paper presents the results of an investigation into the recorded performance of rockpasses in deep-level
Jan 1, 2005
-
Behaviour of large-span rock tunnels and caverns under favourable horizontal stress conditionsBy X. H. Zhang, J. G. Cai
This paper discusses the behaviour of large-span tunnels and caverns in hard rock in a major underground storage project. In-situ stresses were measured using hydraulic fracturing during site investig
Jan 1, 2003
-
Characterization and distribution of chrome spinel grains in magnetically fractionated ilmenite concentratesThe distribution of chrome spinels in a magnetically fractionated ilmenite concentrate sourced from the Murray Basin was characterized by XRF assaying, quantitative electron microprobeanalysis, grain
Jan 1, 2003
-
Quantifying The Differences In Hangingwall ConditionsBy M. Grodner
Underground excavations exhibit different hangingwall conditions in response to varying geotechnical and mining situations. These differences need to be quantified so as to accurately determine the ef
Jan 1, 2000
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
The Development Of A Jet Reactor For The Leaching Of Valuable MetalsBy B. M. Loftus
An investigation into the use of impinging stream (jet) reactors for the leaching of a free milling ore produced an increase in gold recovery by 10% while decreasing leaching time by up to 90%.Tests o
Jan 1, 1997
-
A CFD Simulation Of A Single Phase Hydrocyclone Flow FieldBy M. F. Dlamini
The hydrodynamics of a hydrocyclone present a complex internal flow structure, the numerical simulation of which remains a non-trivial task. We report on three-dimensional water-only computational flu
Jan 1, 2005
-
The Use Of Commercial Oxygen Probes During The Production Of High Titania SlagsBy J. M. A. Geldenhuis
This work is concerned with studying possible reactions in the ilmenite furnace which may control the product quality of both slag and metal. Two different approaches were followed: comparing actual f
Jan 1, 1999
-
Project Report - Pillar Mining At No. 1 And 2 Sub-Shaft On Kloof Gold MinePaper written on project work carried out in partial fulfilment of BSc Engineering (Mining) The aim of this project is to determine whether certain pillars occurring within the no. 1 shaft and no.
Jan 1, 2005