Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Constructing a Decline Truck Entrance Tunnel Into Rock Reserves Located Beneath a College Campus

    By David R. Holberg

    In the Kansas City metropolitan area, mineable Bethany Falls Limestone occurs 80 ft below river level under the 700 acre Park College Campus on the north bank of the Missouri River at Parkville. For 2

    Jan 1, 1997

  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    How to Control Blast Vibrations in an Urban

    By R E. Langston, S M. Gazioglu

    A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e

    Jan 1, 1980

  • ISEE
    Small Scale Model Testing in Investigations of Energetic Material -- Dynamic Effects Laboratory

    By L C. Taylor

    Very small scale testing has been shown to be able to predict quite accurately, in many situations, the results of full scale testing. Small scale tests are more cost efficient, easily observed, and e

    Jan 1, 2012

  • ISEE
    Quantification of Production Quarry Blasting - the Search for the Most Effective Blasting Technologies

    By S C. Brashear, D A. Anderson, A P. Ritter, S R. Winzer, R Broughton

    Results of quarry blasts can be quantified to show the effects of controlled variables. Two studies have been carried out: one to document the effect of delay on fragmentation and the other to show th

    Jan 1, 1985

  • ISEE
    Mechanics of the Run up on Linear Shaped Charges Cutting

    By Jason Baird, Seokbin Lim

    Run up is a factor in Linear Shaped Charge (LSC) cutting for which an account must be made. It occurs on the initiation segment of the charge, and the cutting performance during this period is signifi

    Jan 1, 2006

  • ISEE
    A Blast Vibration Prediction and Data Storage Computer Program

    By Jerry W. Schweiker

    An extensive computer program has been developed which will store and analyze pertinent blast related parameters such as date, time, shot coordinates, charge, delay times, etc. In conjunction with the

    Jan 1, 1984

  • ISEE
    An Unusual Accident Re-created

    By James Stuart

    A man died when the primed charge he was holding against his chest exploded. He was doing legitimate explosive work, and he was following all the safety procedures he had been taught. He and his colle

    Jan 1, 2007

  • ISEE
    Effect of Boulder Geometry on Hydraulic Fragmentation using Small Explosive Charges

    By Paul Worsey, Richard P. Ayres, Mark F. C. Schmidt

    A new alternative technique designed to reduce rock scatter and flyrock during boulder blasting is being developed at UMR. The method uses small explosive charges and is designed for shooting in close

    Jan 1, 2000

  • ISEE
    Excavation for Underground Salt Plant (1f20b243-bfe6-4609-ad5c-cf707711398b)

    By Steven P. Case

    To meet salt production needs over the remaining life of the Cayuga Mine at Lansing, New York, the Salt Division of Cargill, Inc. decided to build a new underground screening plant. The new plant requ

    Jan 1, 1996

  • ISEE
    Blasting a Narrow Orebody at Bong Mines, Liberia

    By Dieter Froelich, Giles Turcotte

    In the near future, Bong Mining Company (BMC) will start mining a new deposit known as Zaweah II which is a narrow iron orebody requiring multiple row blasts with the bench floor as a free face. This

    Jan 1, 1980

  • ISEE
    Demolition of Reinforced Concrete Bridges during Reconstruction of the Motorway Zagreb-Krapina

    By Goran Cirkovic, Zvonimir Ester, Josip Krsnik

    During the reconstruction of the motorway Zagreb-Krapina three reinforced concrete bridges were demolished, for their width was not adequate for the new motorway. Demolition of the three bridges was c

    Jan 1, 1997

  • ISEE
    Energy and the Environment - the Nature of the Problem

    By Earl Cook

    With all our power and hope, we are part of the natural system and subject to its laws. As Francis Bacon pointed out long ago, we must understand those laws and "obey" them if we wish to "conquer natu

    Jan 1, 1979

  • ISEE
    On Explosives Useful Work and Rock Mass Fragmentation Energy

    By Lina Lopez, Jose Sanchidrian, Jean Du Mouza, Essaieb Hamdi

    This paper evaluates the actual energy delivered by the explosives used in the fragmentation of rock during blasting vs. the available theoretical explosive energy. The evaluation of the fragmentation

    Jan 1, 2002

  • ISEE
    Study of Blast Over-pressure from Intentional MEC Detonations Using Double Sandbag Mitigation

    By Daniel Haines, Benjamin Konshak, Michelle Crull

    American Technologies Incorporated Group (ATI) is the prime contractor with U.S. Army Corps of Engineers, Huntsville Center (CEHNC) in the Honolulu District for the removal of munitions and explosives

    Jan 1, 2008

  • ISEE
    Air Decking Technique for Secondary/Boulders Blasting

    By Michael Karmis, Syed Muhammad Tariq, Zeshan Hyder

    Secondary or boulders blasting is a regular feature of quarrying operations in Pakistan, especially in cement and stone crushing industries. The main reason for secondary blasting is the production of

    Jan 1, 2012

  • ISEE
    Analysis of Blast Pattern to Evaluate Extent and Causes of Overbreak in Large Cavern

    By S K. Mandal, S Dasgupta

    "Damage is classifi ed as loss in the integrity or deterioration in the quality of rock massand is infl uenced by methodology of excavation on the geo-technical properties of rockmass. Overbreak, on t

    Jan 1, 2008

  • ISEE
    Blast Modification to Improve Bench Width Reliability at the EKATI Fox Pit

    By D Anonby

    The Fox Pit at EKATI Diamond Mine is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high faces. Blasting tests were conducted to increase the percentage of be

    Jan 1, 2007

  • ISEE
    The Effect of Irregularities on Soil-Air Interface Response Due to a Buried Explosion

    By Leslie C. Taylor, Scott A. Yamada, William L. Fourney

    Previous studies have shown that the pressure load on a target by a buried explosive charge is not smoothly distributed. The effort reported here was undertaken to explore the mechanisms believed to c

    Jan 1, 2012

  • ISEE
    The Application of High Tech Automation in Drilling and Blasting

    By Paul Worsey, Robert Sickler

    Today, America's mining and construction industries are faced with operating under a condition of reduced profit margins. This makes the implementation of new technology far more sensitive to investme

    Jan 1, 1987