Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lie Company’s new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Understanding Spontaneous Detonation of Ammonium Nitrate

    By Alastair Torrance, Gary Cavanough

    Approximately 1.5 million tonnes of ammonium nitrate are transported annually across Queensland, Australia—equivalent to nearly 100 truckloads per day. This is in the form of both AN prill and ammoniu

    Jan 26, 2026

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from Blasting

    By Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham

    Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec

    Jan 1, 2018

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog Mine

    By Norman Paley

    A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput

    Jan 1, 2012

  • ISEE
    Use of Electronic detonators to control blast vibrations – a cautionary tale

    By S. Hosein, W. Birch, C. Johnson

    The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr

    Jan 1, 2024

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    Shaking the Bugs at the Center for Disease Control [CDC]

    By Mick Fritz, Ryan Gilmore

    The Center for Disease Control [CDC] is in the midst of a twenty year project, part of which includes demolishing existing buildings and erecting taller, more modern structures within the same foundat

    Jan 1, 2008

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    A Study of the Impact of Explosive Quality on Blast Performance

    By Alastair Torrance

    The performance of commercial explosives is clearly influenced by the conditions under which they are used. Mining companies are supplied with Technical Data Sheets which provide details about explosi

    Jan 1, 2013

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020