Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Investigating Planer Propagation of a Shockwave in a Shock Tunnel

    By Joshua Hoffman, Braden Lusk, David McLane, John Rathbun

    The research conducted previously on Shock-Tunnel Waveform Analysis gave a brief insight into the propagation of a shockwave within a shock-tunnel compared to that of an open air arena test. As a refr

    Jan 1, 2012

  • ISEE
    New Firing Method for Underwater Blasting (Remote-Controlled Blasting System by Electromagnetic Firing Method)

    By Takeo Ueda, Masashi Nakano

    We have developed a new blasting system remotely controlled by an electromagnetic firing method, which has proved advantageously applicable to sites where rapid tidal current or deep water may cause s

    Jan 1, 1983

  • ISEE
    Conformal Symbolic Regression Applied to Rock Blasting Vibration Prediction

    By Anderson da Cunha Meireles, Pedro Garcia, Ernst Young, Leandro Coelho, Carlos Eduardo Soares Feliciano, Key Fonseca de Lima

    Rock blasting is a crucial technique employed in mining construction and quarrying industries to fragment large rocks into smaller, more manageable pieces. However, it often generates ground vibration

    Jan 21, 2025

  • ISEE
    The Evaluation of Electronic Detonators at Martha Mine, New Zealand

    By Blair Jackson, Tjaart Louw

    Martha Mine, owned by Newmont Mining, Australia appointed Macmahon Contractors (NZ) Ltd as the mining contractor to drill, blast, and crush and convey ore for processing, followed by construction of a

    Jan 1, 2003

  • ISEE
    Blasting Techniques to Prevent Coal Loss and Damage

    By Visitor Makiyi, Chris Batten

    Poor coal recovery due to coal damage or loss caused by blasting can have a significant impact on a mining operation. Increasing coal recovery by reducing blast damage can provide a significant opport

    Jan 21, 2025

  • ISEE
    Blasting the Coleson Cove Poer Plant Cooling Water Outfall Plug

    This is the story of a blast - not a large blast by todays standards as it only involved a total of approximately 50 cubic yards of rock. Nor did this blast involve any new or revolutionary blasting t

    Jan 1, 1976

  • ISEE
    The Use of Numerical Modeling to Enhance Fines Predictions

    By A. S. Tawadrous

    Fines are produced in any blasting application. Depending on the application, fines may or may not be a desirable product of the blast. In most quarry and construction applications, fines are consider

    Jan 1, 2012

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability

    "Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate

    Jan 1, 2017

  • ISEE
    Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania

    By W. De Graaf, C. Mkumbo

    Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilatio

    Jan 1, 2011

  • ISEE
    The Underwater Evaluation of the Performance of Bulk Commercial Explosives

    By Alan R. Cameron, Alastair C. Torrance

    An explosives underwater test facility has been established and commissioned in the Hunter Valley, New South Wales, Australia which allows the measurement of the actual shock and gas energies of the e

    Jan 1, 1990

  • ISEE
    Underwater Blasting Effects on Structures –A Model Approach

    By Chris Breeds, Larry Leone, Jerry Wallace

    One of the Authors was recently retained to provide a professional engineering analysis of the potential impacts from underwater blasts used to enlarge intake tunnels at the Cheesman Dam near Denver i

    Jan 1, 2012

  • ISEE
    Numerical Modelling and Electronic Initiation to Assist Blasting in Heavily Jointed Rock

    By Andrew Theobald, Peter Dare-Bryan, Trevor Byers

    The use of advanced modelling techniques and the timing flexibility of electronic initiation systems allows for unprecedented control over blast outcomes as shown in several complex blasting problems

    Jan 1, 2010

  • ISEE
    Vibration and Blasting

    By Edward J. Walter

    Our modern technology is provided with a unique but flexible power tool in the use of explosives. A by-product of explosives usage is vibration or elastic deformation of the earth which is annoying to

    Jan 1, 1975

  • ISEE
    The Mitigation Effects of a Barrier Wall on Blast Wave Pressures

    By Nathan Rouse

    This blast mitigation study examined the effects of a barrier wall on explosively driven pressures. This area of blast mitigation is of interest due to the many different applications involved in prot

    Jan 1, 2012

  • ISEE
    A Case Study on the Blasted Trench Cut for the Construction of Diaphragm Wall

    By Sehoon Lee, Duhwoe Jung, Eunsu Cha, Kyeonghwan Jeong

    This case study presents the effectiveness of underground rock blasting to facilitate the trench cut in the hard rock layer using a conventional trench cutter for the construction of a diaphragm wall.

    Jan 1, 2000

  • ISEE
    "More than Track and Trace – New Advantages of Track and Trace Software for CivilExplosives"

    By Frank Hirthammer

    "Nowadays, security in the lifecycle of explosives is more important than ever. Terror attacks all over theworld pushed the EU to decree a Commission Directive for the identification and traceability

    Jan 1, 2017

  • ISEE
    Explosive Freeze Pipe Cutting at the McArthur River Uranium Mine

    By Dale Preece, Mike Stern, Steve Piercey, Ayman Tawadrous, GC Zhao

    The McArthur River uranium mine in Saskatchewan, Canada is the world’s largest high-grade uranium mine. It has employed a freeze-wall system consisting of multiple freeze pipes to control the large qu

    Jan 1, 2011

  • ISEE
    Rock-to-Sensor Transmissibility of Vibrations

    By L. M. Lopez, J. A. Sanchidrian

    This work investigates the performance of some of the measurement techniques used in vibrations from blasting monitoring. Two tri-axial geophones with cases of different size, shape and mass were test

    Jan 1, 2014

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    It is known that the introduction of electronic timing in the sequencing of blasting has changed the vision and way in which mining is developed. It is possible to deal with more complex and sophistic

  • ISEE
    Explosive Compaction of Foundation Soils for the Seismic Upgrade of the Seymour Falls Dam

    By Frank Huber, Ed Fulop, Neil Singh, Ron Elliott, Blair Gohl, Lewis Clarke

    This paper covers the successful application of explosive compaction technology for the densification of the foundation soils for the seismic upgrade of the Seymour Falls Dam, Vancouver, BC. The origi

    Jan 1, 2009