Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Statnamic Load Testing Of Strain Instrumented Large Diameter Bored Shafts - SynopsisBy Matthew Janes
Statnamic load testing is becoming widely accepted as a method to quickly and economically determine the load-deflection behaviour and ultimate static resistance of high capacity deep foundations. Str
Jan 1, 1996
-
The Settlements Of Buildings On Pile FoundationsBy Mait Mets
In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th
Jan 1, 2002
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance ProgramBy Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain SoilsBy Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge RehabilitationBy Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement DataBy Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam
A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice
Jan 1, 2018
-
A Decade Of Concrete Embedded Walls In UK - SynopsisBy Robert Fernie
Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u
Jan 1, 2000
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil ParametersBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003