Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral ExplorationBy J. Asfahani
"The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration
Jan 1, 2009
-
Boulby Mine Backfill System: Operational ExperienceBy M. Keen
The backfill system at Cleveland Potash?s Boulby Mine places waste filter cake underground in the form of a high concentration slurry in worked out areas of the mine reducing the mine?s environmental
May 1, 2007
-
Recent Improvements in Grinding at the Williams MineBy T. R. Raponi
"The Williams Mine, Canada's largest gold mine, processes over 6,000 t/d of ore utilizing SAG/ball milling, leaching and CIP, carbon stripping, electrowinning and refining to produce gold dare bullion
Jan 1, 1994
-
Shovels And Draglines In Western Canada and Factors Affecting Hoist-Rope ServiceBy R. G. Hamm
A brief outline covering the shovels and draglines in use in the open-pit mines of Western Canada, including British Columbia, Alberta and the Yukon, is given, followed by the procedure for the select
Jan 1, 1979
-
The use of near surface materials in gold exploration Kirkland Lake area, OntarioBy V. N. Rampton, C. F. Gleeson
"Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w
Jan 1, 1987
-
New trends in underground mine communicationsBy Raymond C. Voige
"The use of current electronic technology in the design of new underground mine communications equipment is providing improved and expanded voice communications which can, in turn, contribute to impro
Jan 1, 1981
-
Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinatesBy J. B. Boisvert, P. Oshust
A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry
Jan 1, 2008
-
Improving the Material Flow in the Fox Mine Concentrate BinsBy J. Chlopas, D. J. Barratt, M. V. Sharp
"This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained
Jan 1, 1978
-
Z1600 Jameson Cell Test Rig – From Rental to RevenueBy A. Taylor, M. Blanchette, J. Doucet
"A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i
Jan 1, 2012
-
The Central Mukur Gold ProjectBy Elmer Stewart, Richard May
"The Central Mukur deposit was discovered by the Semipalatinsk Geological Exploration Expedition (GEE) during detailed searches from 1977 to 1980. Andas Altyn Ltd., a Kazakhstanian gold mining company
Jan 1, 1999
-
Minimum variance or maximum profitability?By R. Mohan Srivastava
"The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes
Jan 1, 1987
-
Applications for Magnetic Mill Linings at the Horne Concentrator of Noranda Mines LimitedBy P. W. Godbehere
"INTRODUCTIONMagnetic mill linings have been developed from an invention by Mr. Bertil Brandt, the originator of the Skega rubber lining. The OREBED magnetic mill lining is a concept in which rubber c
Jan 1, 1983
-
Two-Mass Vibrating Screens for High Tonnage ApplicationsBy Steve Massman, Edward Wipf, Gary Beerkircher
"As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000
Jan 1, 2017
-
Making it Happen at DeBeers CanadaBy Ingrid Hann
The Triple Bottom Line ? Economic Sustainability ? Creation of Joint Venture companies ? Planned evaluation of other kimberlites ? Social Sustainability ? Impact Benefit Agreement and Participati
May 1, 2008
-
Survey of metal values in the ground, 1987–2004By H. Agnerian
"A survey of 925 mineral property transactions worldwide was carried out between 1987 and 2004. These mineral properties with reported Mineral Resources include 457 gold properties, 322 base metal pro
Jan 1, 2006
-
Automated Cyanide Control at the New Britannia Mine, Snow Lake, Manitoba: Fall 1998By Shawn Healey, Ray Norcross
"Site IdentificationNew Britannia MineA 50/50 WX Gold Inc. - High River Gold Mines Ltd. Joint VentureTVX Gold Inc. is the OperatorLocationThe New Britannia Mine is located in the town of Snow Lake, Ma
Jan 1, 1999
-
An undergraduate pilot plant experienceBy L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall
"""Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr
Jan 1, 1980
-
Aur Resources Inc. Session Introduction (CIM 105th Annual General Meeting Montreal, May 5 - 7, 2003)By Robert Hamilton
Aur Resources is Canada's leading copper mining company with producing mines and development projects in North, Central, and South America. Copper production from Louvicourt Mine in Quebec, Quebr
May 1, 2003
-
Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic SignalsBy David G. Almond
"Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi
Jan 1, 2005
-
The G-9 Mine StoryOverview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min
May 1, 2010