Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding Performance

    By Robert E. McIvor

    The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov

    Jan 1, 2005

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Alberta Energy and Utilities Board (EUB) Field Surveillance Branch Building Relationships with Aboriginal Communities

    By Rob Barber

    This paper shares the experience of the Alberta Energy and Utilities Board (EUB) Field Surveillance Branch over the past few years in building relationships with Aboriginal communities. Our goal is to

    May 1, 2004

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold Corporation

    By P. W. Jensen

    Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,

    May 1, 2003

  • CIM
    Challenges & Improvements in Milling at Omai Gold Mines

    By Gregg Vickell

    "High tonnage, low grade gold mines such as Omai’s afford economies of scale that are unto their own insufficient to sustain profitability at today’s depressed gold price. Complimenting profitability

    Jan 1, 1999

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Introduction of China’s Copper Converting Technologies

    By Huilan Yang, Feng He

    This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting

    Jan 1, 2019

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017