Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of CAVEX Hydrocyclone in the Ok Tedi Grinding Circuit

    Ok Tedi Mining Limited has recently completed the first phase of a trial to compare the performance of D26B Krebs cyclones in different configurations to the new Warman 650 mm CAVEX cyclones. From 199

    Jan 1, 2000

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Technical Note - A Test and Comment on Taylor's Rule of Mine Life

    By Schaap W

    A test on Taylor's rule of mine life using published data on open pit porphyry copper mines confirmed that mine life is, on average proportional to the fourth root of reserve tonnage. Deviations

    Jan 1, 1984

  • AUSIMM
    Discovery Performance for Gold and Base Metals in the Pacific/South-East Asia – 2005–2014

    By R C. Schodde

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Over the last decade (2005–2014), a total of 439 significant deposits of gold and base meta

    Mar 18, 2015

  • AUSIMM
    Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor

    The Fosterville Goldmine in Victoria employs bacterial oxidation (BIOX« Process) to liberate gold from its flotation concentrate. Gold occurrence is primarily as submicron particles in pyrite and arse

    Jan 1, 2009

  • AUSIMM
    The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSW

    In August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha

    Jan 1, 1983

  • AUSIMM
    The study of applying dry cobbing pre-concentration and its impact on concentrator efficiency and pit optimisation – Yogi BIF magnetite iron ore mine

    By M Saghaeian, V Sheikhzadeh, R Hejazi

    Mining dilution is one of the most important factors affecting the economy of mining projects. Instead of quantifying dilution in mining studies, it is common to assume a general dilution such as 5 pe

    Aug 24, 2022

  • AUSIMM
    Didipio - Learning the Lessons, Adapting and Getting Ready for Production

    By R Redden

    "The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late

    May 24, 2012

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

    By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew

    "Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application

    Nov 5, 2014

  • AUSIMM
    Gold Mining South Australia The First Fifty Years

    By Fradd WP

    South Australia pioneered metal mining in Australia and was the main source of copper for several decades. Gold discoveries and mining also contributed significantly to the development of the Colo

    Jan 1, 1987

  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera Concentrator

    By E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott

    "The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas

    Oct 10, 2016

  • AUSIMM
    Preconcentration at Mt Carbine Tungsten Mine using sensor-based ore sorting

    By R Kroukamp, G Rech

    CRONIMET Australia in cooperation with Speciality Metals International, the mining lease holder of the Mt Carbine Tungsten mine, have demonstrated the preconcentration and processing of large (>12 mil

    Nov 10, 2020

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    A National Code for Reporting Coal Resources and Reserves

    In November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments

    Jan 1, 1987

  • AUSIMM
    Tech Services - It's a Blast

    Two years ago I was sitting in a big lecture theatre at the School of Mines in Kalgoorlie at the annual New LeadersÆ Conference listening to a guy tell us all how much he loved his job, travelling the

    Jan 1, 2008

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    WaihiÆs 2020 Vision: Part B: Where to From Here?

    For the past 3 years Waihi as a community has been actively engaged in consultation about its future with regard to the environmental, cultural, economic and social viability. This has been made possi

    Jan 1, 2006

  • AUSIMM
    VHMS Mineralisation in NW Papua New Guinea

    By K Akiro

    Volcanogenic massive basemetal sulphide and gold mineralisation of predominantly low sulphidation style has been located within Lower Tertiary basaltic and felsic volcanic and sedimentary sequences at

    Jan 1, 1999