Search Documents

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • SAIMM
    A theoretical model for the characterisation of rock mass mechanical properties—Application at the Äspö HRL, Sweden

    By A. Fredriksson, R. Christiansson, I. Staub

    A theoretical model based on DFN models and 2D DEM numerical modelling has been developed for evaluating the rock mass mechanical properties. The description of the methodology is non-site related and

    Jan 1, 2003

  • SME
    Gold and Silver Assay Methods in the Mining and Metallurgy Industry

    By L. C. Stone, J. C. Parr, T. N. Anderson, D. Metcalf

    An increase in the importance of low-grade materials as sources of gold and silver has led to the need for improved analytical methods on leach solutions, ores and various effluents, residues, and in-

    Jan 1, 1981

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • CIM
    Scales or Scoundrels

    By Ron Board

    "Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo

    Jan 1, 1975

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • DFI
    New Technologies For Quality Control Of Augered Cast-In-Place Piles

    By Tracy Brettmann

    In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r

    Jan 1, 2000

  • SAIMM
    Mineral Resource Throughput Management: From An Iron Ore Mine To Steel In India (b7c708d0-4ac4-4078-9cb8-41844cba4156)

    Mineral Resource Throughput Management is based on the extraction of the maximum potential value from an ore reserve with the emphasis to generate maximum ROI and ROR (return on reserve). A stee

    Jan 1, 2007

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • NIOSH
    OFR-131-83 Safety And Health In Underground Mine Waste Disposal

    By J. P. Schmid

    Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer

    Jan 1, 1982

  • SAIMM
    Utilisation Of The Mineral Density Separator In The Coal Industry

    The Mineral Density Separator (MDS) was developed by Mintek to predict mineral separation in a plant, evaluate efficiencies and develop scale-up parameters. This study investigated the influence of pa

    Jan 1, 2006

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • NIOSH
    FLAC Simulation Of Split-Pipe Tests On An Instrumented Cable Bolt (a0c51804-b6b1-4b6f-b8ba-d2b4c1ab8f67)

    By Marc Ruest, Lewis Martin

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are avail

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • AUSIMM
    Enhancing Magnetite Returns - The Benefits of IsaMilling

    By T Do, J Siliezar, M Larson

    With the expansion of magnetite projects in Australia has come the opportunity to take advantage of newer technologies that were not necessarily available when the magnetite industries of North Americ

    Aug 12, 2013

  • SME
    Results given of studies concerning methane extraction from coalbeds

    By M. A. Trevits, G. L. Finfinger

    Various methods have been developed through US Bureau of Mines research to remove gas in advance of, during, and subsequent to mining. These include drilling horizontal or cross-measure boreholes from

    Jan 8, 1986