    A Progress Report On Ultra-High-Pressure Waterjet Cutting Underground: The Future Of Narrow Reef Gold And PGE Mining

    By C. D. K. Gauert

    High-pressure waterjet technology is proposed as an alternative tool for selective underground mining of high-grade ore sections in stratiform orebodies showing a preferred ?bottom? or ?top? enrichmen

    Jan 1, 2013

  • SME
    Rewards and Frustrations of Female Mining Engineers

    By Christy Z. Lueders

    Introduction More and more women engineers are joining the traditionally male mining industry. Are they successful? Do they encounter special problems? How do men in mining respond? How can the minin

    Jan 10, 1981

  • TMS
    A Thermodynamic Model For The Reaction Zone Of Lead Blast Furnace

    By Pengfu Tan

    A thermodynamic model has been developed to predict the distribution behaviors of Cu, Fe, S, O, Pb, Zn, As, and heat balance in a lead blast furnace. The modeling results have been validated by the pl

    Jan 1, 2005

  • NIOSH
    RI 3495 The Eykometer - A New Device For Measurement Of The Yield Point Of Clay Suspensions And Oil-Well Drilling Muds ? Introduction (7fd31193-d283-41c7-90b4-e8cc03288534)

    By A. George Stern

    In the examination of bentonitic clay suspensions used for oil-well drilling fluids3/ (and for other purposes, such as a core binder for foundry sand) it is important to have comparative tests for eva

    Jan 1, 1940

  • NIOSH
    Improved Rail Haulage Communications

    By Harry Dobroski

    Communications with moving tracked vehicles in a rail haulage mine pose a difficult problem. These communications take place from dispatcher to vehicles or from vehicle to vehicle via the trolley line

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • DFI
    "Comparative Pile Load Tests In Alluvial Sands" - I. Introduction

    By Lawrence F. Johnsen

    In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje

    Jan 1, 1993

  • SME
    Fine Coal Cleaning Using A Centrifugal Fluidized Bed Separator

    By Mutombo Nombe, Avimanyu Das, Rick Honaker

    Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub

    Jan 1, 2005

  • IIMP
    Caracteristicas estructurales y estratigraficas de los yacimientos epitermales de baja sulfuracion en el corredor estructural San pablo - Porculla

    By José Antonio Enríquez

    El presente texto describe las características estructurales y estratigráficas de los yacimientos epitermales de baja sulfuración en el corredor estructural de San Pablo en Porculla, Cajamarca. En est

    Sep 12, 2005

  • TMS
    Weibull Analysis of Tensile Tested Piassava Fibers with Different Diameters

    By Denise Cristina Oliveira Nascimento

    Environmental considerations in addition to technical, economical and societal benefits are increasingly promoting the substitution of natural fibers for glass fiber in polymer matrix composites. Howe

    Jan 1, 2010

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • NIOSH
    RI 5824 Particle-Size Reduction Of Coal By Attrition In A Tube ? Summary And Conclusions

    By J. L. Konchesky

    In gasifying pulverized coal with steam and oxygen, the particle size of the coal fed to a gasifier should be as small as economically possible. A potential way to achieve this advantage is to reduce

    Jan 1, 1961

  • NIOSH
    Instrumentation For Diesel Particulate Matter Emissions Research

    By J. D. Noll, S. E. Mischler

    Measurement and sampling of diesel particulate matter in mine air presents a challenge due to the complexity of the diesel aerosol. The results of a series of tests carried out by the National Institu

  • CIM
    Grinding: Why So Many Tests?

    By Alex Doll, Derek Barratt

    "There is a number of comminution tests commonly used in the mining industry. Many of the tests are used for a particular grinding model or mill sizing program and are incompatible with other tests of

    Jan 1, 2011

  • ISEE
    Trench Blasting Guidelines & Pitfalls

    By Vic Sterner

    As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the

    Jan 1, 2004

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987

  • NIOSH
    OFR-140-84 Development Of Engineering And Cost Data For Foreign Gold And Silver Properties

    By Robert E. Green

    This Final Report summarizes the results of work accomplished under Contract No. J0215039. It is in an executive overview or executive summary format. The number and description of the various techni

    Jan 1, 1983

  • SME
    Integrated Sustainability Assessment in the Mineral Industry - Framework and Example

    By R. J. Baumgartner

    Sustainability issues are from rising interest and importance for the mineral industry worldwide. In order to bring them into management processes and to improve decision processes, economic, ecologic

    Jan 1, 2005