Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Moisture Adsorption And Desorption Characteristics Of Some South African CoalsBy Q. P. Campbell
The high final total moisture content of fine coal after mining and processing is one of the major reasons that this resource is not extensively used in subsequent power generation, combustion, or oth
Nov 1, 2013
-
Reservoir Engineering - General - Effect of Composition and Temperature on Phase Behavior and Dep...By T. K. Perkins, L. R. Kern, R. E. Wyant
Many factors influence the results of hydraulic fracturing to stimulate well productivity. Most of these factors have been studied and their effects discussed in the literature. However, the movement
-
RI 5969 Radiation Hazards Encountered In Arc Melting Thorium ? SummaryBy R. R. Lowery
This project was proposed to provide information on the hazards associated with arc melting of thorium. A general air-sampling analysis was made to determine the separation, concentration, and distrib
Jan 1, 1962
-
A New Process For The Thermal Refining Of Zinc: A Case Study Of Technology Development At MintekBy A. McKenzie
During the late 1990s Anglo American PLC was evaluating the Gamsberg zinc deposit in the Northern Cape Province. As the primary South African metallurgical technology provider, Mintek became involved
Jan 1, 2004
-
An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement SuspensionsBy Christian Wawrzyniak
An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol
-
Practical aspects of large-scale conditional simulationsBy M. E. Rossi
All large-scale applications of conditional simulations intend to benefit from the ‘correct’ (or’ accurate’) characterization of uncertainty, adequately describing the variability observed from the da
Jan 1, 2003
-
The Elephant in the MillMinerals processing needs a step change in energy efficiency. While the search for new technology breakthroughs is important, huge gains are still available by better using existing research outcomes.
Sep 13, 2010
-
Digital Terrain Modelling for Exploration and MiningBy H North, J Barringer, S McNeill, D Pairman
Models of ground surface elevation, slope, aspect, curvature, roughness, deformation, as well as other features are gathered together in the term Digital Terrain Model (DTM). DTMs can be generated fro
Jan 1, 2000
-
Total Primary Milling Cost Reduction By Improved Liner Design - SynopsisBy J. Dahner
Total milling cost is composed of energy, liner and grinding media costs. In primary high ball load milling, the grinding media play the biggest role in total milling cost. This cost can be drastical
Jan 1, 2011
-
Application Trends of Gold-Tin Solder Paste for Fine Pitch DevicesBy Masayuki Ishikawa
In a radio frequency and optoelectoronic device packaging, Gold-Tin (Au-20 wt% Sn eutectic) solder is used widely due to the excellent electrical and thermal conductivity, high strength, and negligibl
Oct 1, 2003
-
Pushback 8 South ? A Case Study In Pit Slope ManagementBy P Knight, P A. Walker, H E. Speight
Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i
Jan 1, 2006
-
Anamolies Ammednments And Revision Of Is Code On Underreamed Piles - SynopsisBy A. V. Shroff
The Indian Standards code of practice for design and construction of underreamed piles contains provision for installing such piles in expasive soils. In recent years, a large amount of research work
Jan 1, 1996
-
Advances in Continuous Miner AutomationThis paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa
Dec 6, 2010
-
The Adams Mine Iron Ore to PelletsBy G. B. Bell
"INTRODUCTION On February 1, 1962, after five years of exploration and research, Jones & Laughlin Steel Corporation announced that they would develop the Adams Mine. Plant construction began immediate
Jan 1, 1973
-
Nitrogen Inertization At San Juan Coal Company’s Longwall OperationBy Jacques F. Abrahamse, Kevin A. Bahe, T. Arthur Palm, Gregory E. McCluskey, Stephen L. Bessinger
Introduction Basis For System San Juan Coal Company (SJCC) is a subsidiary of BHP Billiton. Until recently, BHP Billiton operated three surface mines in northwestern New Mexico: Navajo, San Juan,
Jan 1, 2005
-
Common Granulation System Problems With A Focus On Non-Ferrous ApplicationsBy Art Cooper
Granulation systems are customarily viewed as problem areas in metallurgical operations. The inherent risk of explosion when combining a high temperature melt with water creates a safety hazard. Separ
Jan 1, 2006
-
Resource evaluation of Nsuta manganese carbonate deposit, GhanaBy S. Al-Hassan
The deposit has been exploited for Mn oxide and carbonate since 1916. Known reserves of MnO, however, are almost depleted and the survival of the mine will depend on the exploitation of the carbonate.
Jun 19, 1905
-
Water Treatment at Waikato North Head Mine SiteBy B Orchard
New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.
Jan 1, 2002
-
New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)By M. Hopf
The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper
Jan 1, 2006
-
A Case Study Application Of Linear Programming And Simulation To Mine Planning ? SynopsisBy J. A. de Carvalho Junior
This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod
Jan 1, 2012