Search Documents

  • NIOSH
    OFR-131-83 Safety And Health In Underground Mine Waste Disposal

    By J. P. Schmid

    Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer

    Jan 1, 1982

  • CIM
    Scales or Scoundrels

    By Ron Board

    "Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo

    Jan 1, 1975

  • SAIMM
    Utilisation Of The Mineral Density Separator In The Coal Industry

    The Mineral Density Separator (MDS) was developed by Mintek to predict mineral separation in a plant, evaluate efficiencies and develop scale-up parameters. This study investigated the influence of pa

    Jan 1, 2006

  • SME
    Gold and Silver Assay Methods in the Mining and Metallurgy Industry

    By L. C. Stone, J. C. Parr, T. N. Anderson, D. Metcalf

    An increase in the importance of low-grade materials as sources of gold and silver has led to the need for improved analytical methods on leach solutions, ores and various effluents, residues, and in-

    Jan 1, 1981

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • SME
    New Insitu Instrumentation Technique For Tunneling & Mining Design: Field Examples

    By Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida

    A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to

    Jan 1, 1976

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • NIOSH
    Evaluation of the Effects of Length on Strength of Slender Pillars in Limestone Mines Using Numerical Modeling

    By Dennis R. Dolinar, Gabriel S. Esterhuizen

    In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • IIMP
    Antamina and Huascarán national Park: A case study in mining, conservation and sustainable development

    By Steven D. Botts

    The paper point out the Antamina's social policies with Huascarán National Park. The project had required the mine engage with the communities most affected by the mine development, its operation, and

    Sep 13, 2001

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • AUSIMM
    Recovery of Copper from Chalcopyrite Concentrate by Means of Sulphur Activation, Cupric Chloride Leach, and Electrolysis

    Extraction of copper from a chalcopyrite concentrate by means of a cupric chloride leach is described. Initially the concentrate is mixed with sulphur in a 9: 1 ratio, and heated to 350-400°C. Th

    Jan 1, 1974

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001