Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-131-83 Safety And Health In Underground Mine Waste DisposalBy J. P. Schmid
Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer
Jan 1, 1982
-
Scales or ScoundrelsBy Ron Board
"Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo
Jan 1, 1975
-
Utilisation Of The Mineral Density Separator In The Coal IndustryThe Mineral Density Separator (MDS) was developed by Mintek to predict mineral separation in a plant, evaluate efficiencies and develop scale-up parameters. This study investigated the influence of pa
Jan 1, 2006
-
Gold and Silver Assay Methods in the Mining and Metallurgy IndustryBy L. C. Stone, J. C. Parr, T. N. Anderson, D. Metcalf
An increase in the importance of low-grade materials as sources of gold and silver has led to the need for improved analytical methods on leach solutions, ores and various effluents, residues, and in-
Jan 1, 1981
-
Instrumented Load Tests On Closed-And Open-Ended PilesBy Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
New Insitu Instrumentation Technique For Tunneling & Mining Design: Field ExamplesBy Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida
A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to
Jan 1, 1976
-
Engineering Geology Of The Mica Underground PowerplantBy Douglas D. Campbell, Alan S. Imrie
INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m
Jan 1, 1976
-
Site Specific Blasting Model For Mine-To-Mill OptimizationBy K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
A Preliminary Comparison of Coal Classification and Processing between Canada and ChinaBy Ting Lu, Gerard Laman
"This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u
Jan 1, 2012
-
Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken HillThe 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The
Jan 1, 1965
-
Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United KingdomBy Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler
National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci
Jan 1, 2007
-
Evaluation of the Effects of Length on Strength of Slender Pillars in Limestone Mines Using Numerical ModelingBy Dennis R. Dolinar, Gabriel S. Esterhuizen
In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a
-
Rapid Lateral Load Testing Of Deep FoundationsBy Dan A. Brown
This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of
Jan 1, 2007
-
Journal: Junction Chamber Blasting November 22,1999By Edward Walter
Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m
Jan 1, 2001
-
Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - SummaryBy Basem Sh. Hazzan
In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on
Jan 1, 1999
-
Antamina and Huascarán national Park: A case study in mining, conservation and sustainable developmentBy Steven D. Botts
The paper point out the Antamina's social policies with Huascarán National Park. The project had required the mine engage with the communities most affected by the mine development, its operation, and
Sep 13, 2001
-
Seismic Hazard In Western Australian MinesA Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western
Jan 1, 2004
-
Global Approach to Managing Deep Mining HazardsA series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced
May 1, 2009
-
Recovery of Copper from Chalcopyrite Concentrate by Means of Sulphur Activation, Cupric Chloride Leach, and ElectrolysisExtraction of copper from a chalcopyrite concentrate by means of a cupric chloride leach is described. Initially the concentrate is mixed with sulphur in a 9: 1 ratio, and heated to 350-400°C. Th
Jan 1, 1974
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001