Search Documents

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • AUSIMM
    A Roast-Leach Method for Recovering Valuable Metals from Nickel Refinery Copper Sulphide Precipitates

    Gold, silver and palladium may be separated from the other base metals and sulphur contained in copper sulphide precipitates derived from the Sherritt-Gordon nickel process using a process involving a

    Jan 1, 1982

  • AUSIMM
    Practical Stope Reconciliation in Large-scale Operations Part 2, Olympic Dam, South Australia

    By J Wesseloo and Y Kim, Y Potvin, G Mungur, D Grant

    At the previous MassMin conference held in Sudbury in 2012, the authors proposed a new framework going beyond dilution and equivalent linear overbreak sloughing (ELOS) for stope reconciliation in rela

    May 9, 2016

  • AIME
    Minerals Beneficiation - Production of Iron-Ore Superconcentrates by High-Tension Electrostatic Separation

    By Robert M. Funk, James E. Lawver

    The development of a laboratory and pilot-scale high-tension electrostatic flowsheet for the production of iron-ore super concentrates having silica contents in the range of 0.1% is presented, A varie

    Jan 1, 1971

  • AIME
  • AUSIMM
    Minerals Separation Flotation Plant at Kyle Copper Mines, NL

    THE ore treated is almost pure copper pyrites (chalcopyrite) in a gangue of quartz and quartz-felsite. Very little free iron sulphide (pyrite) occurs, and at the time of the erection of the flotation

    Jan 1, 1912

  • CIM
    Drum Hoisting in North America ? Approach to Design

    By Mike Robotham

    When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right

    May 1, 2011

  • SME
    Long-Term Trends in Copper Prices

    By John E. Tilton

    Real copper prices during the past several decades display two striking characteristics. First, they are highly volatile. Within a year or two, copper prices can rise or fall by 30% or more. Second

    Jan 1, 2002

  • AUSIMM
    Quantification and Controls on as Distribution in Westland, NZ

    By D Craw, J Pope

    The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised

    Jan 1, 2006

  • CIM
    Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault

    By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak

    "By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important

    Jan 1, 2009

  • SME
    Reclaiming Steep-Slope Eastern Coal Mines For Successful Reforestation

    A methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The Forestry Reclamation Approach (FRA) has been applied, almos

    Jan 1, 2011

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • SME
    Maintenance Management: Minimizing Risk to Profitability

    By Paul D. Tomlingson

    Modern production equipment has been designed with greater productive capacity and higher reliability to meet the rigorous operating demands of the mining industry. These improvements have also made

    Jan 1, 2005

  • AUSIMM
    Incorporating research data in addressing methane and coal dust fire, and explosion hazards in coalmines

    By S Kundu, J Zanganeh, D Eschebach, B Moghtaderi

    The concentrations of methane and coal dust vary from one location to another in underground coalmines. In the presence of an ignition source, such as static electricity, these mixtures can initiate e

    Aug 28, 2017

  • AIME
    The Relation Of Sulphur To The Overpoling Of Copper

    By Stanislaus Skowronski

    OVERPOLED copper, as commonly defined, is copper which has been excessively reduced during the poling period of the refining process. Owing to its porosity, such copper is unfit for commercial purpose

    Jan 3, 1918

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • AIME
    Industrial Section (ea32135b-11f0-4a3d-8254-29f8fc027276)

    Pulverized Fuel Combustion The apparatus shown in the illustration is a complete equipment f r supplying coal to boiler and metallurgical furnaces, cement and lime kilns, dryers, and to all furnaces

    Jan 11, 1915

  • CIM
    Méthode long trou à la Mine Mouska

    By Karl Marquis

    La Mine Mouska exploite depuis deux ans certains blocs de réserve à l?aide de la méthode long trou. Même si, à priori, la méthode long trou semble rentable, le contrôle de la dilution ainsi que le res

    Oct 1, 2001

  • IOM3
    Analysis by chemical potential diagram of the oxidation of molten silver selenide

    By G. G. Barbante

    An understanding of the thermodynamics of smelting copper anode slimes is a prerequisite for improvements to the process. During slimes smelting, a silver-copper selenide matte is formed and subsequen

    Jun 21, 1905

  • NIOSH
    IC 9185 - Mine Safety Education And Training Seminar

    Education and training research is a major component of the Bureau of Mines human factors research program. The goal of human factors research is to enhance human performance for the purpose of improv

    Jan 1, 1988