Search Documents

  • CIM
    Development of an Audit Procedure to Diagnose the MOP Flotation Circuit at SQM Chile

    By Carlos F. Perucca, Maria Virginia Ramírez A.

    "Chile based SQM S.A., exploits potassium chloride rich salts at the Salar de Atacama, in northern Chile. The process includes the solar evaporation of natural brines existing in the Salar salt bed, f

    Jan 1, 2004

  • AUSIMM
    The Blackwater Mine at Waiuta - Exploration Options

    The Reefton Goldfield on the West Coast of the South Island of New Zealand was a significant gold producing area between 1860 and 1951. During this period it produced approximately 2.1 million ounces

    Jan 1, 1992

  • AUSIMM
    Paleodepth Studies of Epithermal Au-Ag Deposits in the North Island of New Zealand û Progress Toward a 4D Model

    By R L. Brathwaite

    Previous paleodepth studies of low-sulphidation epithermal Au-Ag deposits in the Coromandel region indicated that economic gold mineralisation was generally limited to a depth zone of 100 to 400 m bel

    Jan 1, 2003

  • AUSIMM
    Fundamentals of Cyclone Design and Operation

    The cyclone, or centrifugal separator, ,is firmly established in industry as a low cost separator of solids from gases.While it will also separate fluids of different densities, and solids from liquid

    Jan 1, 1949

  • AUSIMM
    Gold and Water in the Coromandel

    By T J. Sprott, Associates

    A number of people have expressed concern, understandably, that if mining operations take place in the Coromandel, the flows of mineralised ground water which exist will be intercepted. This water in

    Jan 1, 1981

  • DFI
    Innovations In Scandinavia

    By Carl-John Grävare

    This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq

    Jan 1, 2000

  • AUSIMM
    Surface Tensions of Molten Heavy Metal Iodides and Their Relation to Sulphide Paragenesis

    The sulphides can be arranged in a series determined by the relative amounts of ionic and covalent bonding present. This series is similar to the paragenetic series common to most sulphide ore deposit

    Jan 1, 1956

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • AIME
    Reservoir Engineering – General - A Dynamic Programming Model of the Cyclic Steam Injection Process

    By R. G. Bentsen, D. A. T. Donohue

    The cyclic steam injection process has become the most widely applied and most successful thermal recovery technique in use today.1-4 Normally, steam stimulation is repeated several times during the l

    Jan 1, 1970

  • SAIMM
    New Trends In Submerged Arc Furnace Technology

    By J. Kunze, R. Degal

    During the last 100 years, the submerged arc furnace has been one of the most amazing diversified melting units. These furnaces have found their application in more than 20 different main industrial a

    Jan 1, 2004

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007

  • AUSIMM
    Australian Rock Bolt Steel Chemistry and Stress Corrosion Cracking

    It's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a

    Nov 25, 2010

  • AUSIMM
    Advanced Techniques for On-Line Monitoring of Brown Coal Quality

    By Lottrey A. L, Sowerby B. D, Cutmore N. G

    On-line monitoring of low rank coal quality during input to a process has the potential to provide benefits through: ò anticipation of coal quality variations prior to utilisation; ò provision of a t

    Jan 1, 1992

  • SME
    Sustainability at Bucyrus

    By U. Paschedag, H. Bussmann

    "Bucyrus manufactures the most comprehensive product portfolio of mining equipment worldwide. Its mission is to have a positive, lasting effect on our world. Bucyrus makes sustainable development a fu

    Jan 1, 2011

  • SME-ICGCM
    Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)

    By Anthony Iannacchione

    Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o

    Jan 1, 1992

  • SAIMM
    Risk Indexing Tool for Mine Planning

    By W. Abdellah

    The purpose of this paper is to establish a qualitative method to estimate the risk level (e.g. rating and ranking) resulting from mining activity. Risk is the product of two factors: probability of f

    Jan 1, 2014

  • SME
    AUV and ROV magnetometer surveys, compensation

    By Peter Kowalczyk

    Magnetic surveying and map production is well established in land based mineral exploration. Magnetic data are routinely used to map geology in covered terrains, to estimate the depth to basement in o

    Sep 1, 2014

  • NIOSH
    Roof Monitoring in Limestone-Experience with the Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall, Michael Dunn, L. J. Prosser, Anthony T. Iannacchione

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

  • NIOSH
    RI 9075 - Arch Canopy Design Procedure for Rehabilitation of High-Roof-Fall Areas

    By Richard A. Allwes

    This Bureau of Mines report presents a procedure for the design of an arch canopy for use in rehabilitating a high-roof-fall area. Only dy-namic line loading of an unbackfilled arch canopy at its crow

    Jan 1, 1987

  • CIM
    Occupational Exposure Monitoring in the Thompson Mill of Inco Metals Ltd.

    By M. L. Goble

    "Inco Metals Ltd. (Manitoba Division) operates a mining, milling, smelting and refining complex, 500 miles north of Winnipeg in central Manitoba. The Thompson Mill is presently operating at 12,000 S.T

    Jan 1, 1980