Search Documents

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • CIM
    Engineered Membrane Separation® (EMS®) Systems for Hydrometallurgical Applications

    By Larry A. Lien

    "A brief summary of the different membrane separation options currently available to the mining industry will be presented and discussed. The processes described involve operating membrane plants on t

    Jan 1, 2010

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • AUSIMM
    The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.

    Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib

    Jan 1, 1963

  • SME
    Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

    By Jamal Rostami, Ataollah Rahbar

    "Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a

    Jan 1, 2016

  • AUSIMM
    An Elementary Statistical Examination of Some Mine Sampling Problems

    At an early stage of the examination of most prospects, samples are taken; and the sample values obtained play an important part in determining the subsequent history of the prospect. It is, therefore

    Jan 1, 1950

  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AUSIMM
    The Port Hedland FINMET« Project - Fluid Bed Production of High Quality Virgin Iron for the 21st Century

    By Mayfield P. L J, Honeyands T. A

    BHP's two million tonne per annum nominal capacity Hot Briquetted Iron (HBI) plant at Port Hedland in the Pilbara region of Western Australia is based on FINMET¦¦ direct reduction technology. T

    Jan 1, 1999

  • AUSIMM
    Past and Future Parameters for Mining the Otago Alluvial Gold Deposits

    The early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o

    Jan 1, 1992

  • SME
    Preventing Roof Falls in Weak Ground

    By Ryan C. Stephan, Christopher Mark

    "Some of the weakest roof in United States coal mines is found in the Illinois Basin. Historically, the Illinois Basin has also suffered from high rates of unplanned roof falls and rock fall injuries.

    Jan 1, 2019

  • ISEE
    Using Photogrammetry Data from Unmanned Aerial Vehicle (UAV), Small Unmanned Aircraft Systems (sUAS) for Blast Design

    By Luis Valentim, John E. Wiegand

    Highwall or face profiling has long been used to facilitate the design and placement of front row blastholes to ensure optimum burdens. Traditionally, a large number of laser measurement points obtain

    Jan 1, 2016

  • AUSIMM
    The Blue Asbestos Deposits of the Hamersley Ranges (19c1a807-8e29-4e48-b49c-0186628feb0e)

    Crocidolite deposits in the Hamersley Ranges, NW. of Western Australia, occur over a length of 180 miles and a width of 20' to 30 miles. Their stratigraphic environment and mineralogy is comparab

    Jan 1, 1964

  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynch A. J

    A method has been developed for the prediction of the performance of multi-stage grinding-cyclone classification circuits of any degree of complexity on any ore for a wide range of operating condition

    Jan 1, 1965

  • AUSIMM
    Some Variations in the Bulli Seam (72de16ac-67f4-41d6-a112-99d725dba8e1)

    The Bulli Seam, New South Wales, comprises medium to low volatile bituminous coal, generally of coking quality. It is worked over an area embracing 300 square miles.Variations in several factors are f

    Jan 1, 1963

  • NIOSH
    Report Submitted To The Trail Smelter Arbitral Tribunal - Part I. - Operational Features Of Trail Smelter - Introduction - Instructions Given By Tribunal

    By R. S. Dean

    As set forth in the decision of the Trail Smelter Arbitral Tribunal, dated April 16, 1938 This Tribunal is constituted under and its powers are derived from and limited by the convention between the

    Jan 1, 1944

  • AUSIMM
    An Improved Method of Dumping Spoil

    About twelve months ago, owing to the increasing quantity of stone and dirt being drawn frQm the Victorian State Coal Mine due to the large amount of dead work below ground, cutting, faults, etc, and

    Jan 1, 1918

  • AUSIMM
    Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine

    By M Nehring, E Topal

    Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a to

    Jan 1, 2009

  • NIOSH
    RI 8782 Physical Property Data on Coarse Anthracite Waste

    By Bill M. Stewart

    Since 1974, a large amount of data has been developed concerning the physical properties and stability characteristics of waste generated by the mining and preparation of bituminous coal. However, ver

    Jan 1, 1983

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • SME
    Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan Operations

    By A. Koski

    A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U

    Jan 1, 2007