Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Tying Acceleration And GPS Location Information Together To Create A Mine Management Tool (46eb7fa8-c025-4c28-b865-1393c124ce32)

    By J. Walden, S. Rhoades, R. E. Miller, R. Gibbs, P. Boman

    Accelerometers and pressure transducers mounted in suspension components can be used to monitor the ride of haulage trucks. Presently, it is difficult to tell what caused a jolt to the truck using eit

    Jan 1, 1999

  • SME
    Colorado School of Mines Research Institute Involved in Variety of Projects

    By Paul R. Smith

    The Colorado School of Mines Research Institute (CSMRI) was founded in 1949 to fill mining industry and government needs for minerals research and development. The operations of scores of mines, mills

    Jan 2, 1982

  • SME
    Daylighting Thorn Creek Tunnel Into Chicago?s Tarp Thornton Composite Reservoir

    By Cary Hirner

    The Metropolitan Water Reclamation District of Greater Chicago (District) is in the final phase of completing the Calumet System component of the Tunnel and Reservoir Plan (TARP) by bringing the Thorn

  • SME
    Development Of An Energy-Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska

    By J. T. Hollow

    The Fort Knox Mine is located in Alaska?s interior, where the average ambient air temperatures range from -24°C (-11°F) in January to 16°C (61°F) in July. The mill processes a free-milling gold ore ut

    Jan 1, 2007

  • SME
    Beneficiation Of Low-Grade Limonite Ore By HIMS-Cationic Reverse Flotation And Magnetic Roasting-LIMS Techniques

    By L. Xinghua

    Limonite is a general term for a group of amorphous iron oxide and iron hydroxide materials. It is considered as one of the very refractory iron ore types due to its wide variation in chemical composi

    Feb 27, 2013

  • SME
    Proposed Contracting Practices For The Caltrain Downtown Extension

    By Derek J. Penrice

    The Caltrain Downtown Extension (DTX) project will extend commuter and future statewide high-speed rail service into the Transbay Transit Center, which will be located in the business district in down

  • SME
    2009 Permeation Test Results For Grouts Made With Ultrafine Cements

    By Raymond W. Henn

    The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2

    Jan 1, 2009

  • SME
    Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced Tunneling

    By Peter Bigwood

    Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come

    Jan 1, 2012

  • SME
    Economy Version Of Small Diameter Rock Boring

    By Daniel Connor, O&apos

    The Cal-Sag Relief Sewer is a 2.6 m (8 ft 6 in.) diameter 9.1 km (5.7 mile) rock tunnel bored in dolomite for the Metropolitan Sanitary District of Greater Chicago. Included in the project are 18 shaf

    Jan 1, 1985

  • SME
    Extraction Metallurgy Of Copper From Chalcopyrite Concentrates Without Sulfuric Acid Generation Via Chlorination III. Integration Of Gaseous Chlorination And Selective Oxidation

    By T. Tamagawa, N. S. Fu, I. Iwasaki, M. Kobayashi

    A 3-stage fluidizing bed process of chlorination, selective oxidation and sulfur chloride conversion was tested for processing of a chalcopyrite concentrate. It was found that the use of excess oxygen

    Jan 1, 2000

  • SME
    Key Regulatory Issues Planned And Controlled Subsidence

    By Gary E. Slagel

    The year was 1974. The event - the United States Congress was embroiled over what issues should be included in the proposed national surface mining law. The question - what should be done with undergr

    Jan 1, 1986

  • SME
    An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical Modeling

    By Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson

    Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen

    Jan 1, 2000

  • SME
    Geochemical Profiling Of A Sulfide Leaching Operation: A Case Study

    By S. M. Flaherty, R. E. Scheffel, A. Guzman

    Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me

    Jan 1, 2006

  • SME
    Miners Remain Upbeat at NWMA Meeting

    By Steve Kral

    As the current boom in the global mining industry rumbles on, mining companies have had to step up their efforts to replace mined reserves. Many of the majors are replacing and adding to their reserv

    Jan 1, 2006

  • SME
    Assessment Of A Selectivity Criterion For Upgrading Ultrafine Iron Ores By Selective Flocculation

    By A. A. El-Midany

    Traditionally, the choice amongst different upgrading techniques or in finding the optimum operating conditions for a given upgrading technology depends on whether one is looking at the grade or the r

    Jan 1, 2008

  • SME
    How To Increase Plant Performance With Artificial Intelligence And Expert Systems - Preprint 09-074

    By L. B. Hales

    Expert control of grinding and flotation plants has been successfully used in the minerals industry since the 1970?s. The earliest of these systems were written in a hard-coded fashion in FORTRAN, BAS

    Jan 1, 2009

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • SME
    Automatic Landslide Monitoring Using Terrestrial-Based Static Lidar

    By M. Leslar

    Slope monitoring has been an important issue in static terrestrial lidar for some time. Several solutions for monitoring the progress of a slide have been devised over the years. All of these solution

    Feb 27, 2013

  • SME
    Connection of TARP Tunnel to Thornton Quarry Reservoir

    By Djavid Mohammad

    Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad

    Jan 1, 2008

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007