Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study Of Stability Of Mercury And Silver Polythiocarbonate Nanofilms Generated During Optimized Mercury Removal From Cyanidation Pregnant EluateBy C. Bucknam, M. McComb
Mercury and silver polythiocarbonate sludge that was generated from the pilot testing of optimized mercury removal from cyanidation pregnant eluate solutions prior to Merrill-Crowe recovery of gold an
Jan 1, 2007
-
Safeguards To Prevent Airflow Reversal From Ventilation ChangesBy R. D. Peterson
As underground mine operations expand, the ventilation systems supporting them become complex. Complexity increases with periodic ventilation changes. New diagonal connections require a rebalance of
Jan 1, 2012
-
Regional Metallogenesis Of Central AlaskaBy W. J. Nokleberg, B. A. Bouley, T. K. Bundtzen
Central Alaska contains a wide variety of pre-, syn-, and post -accretionary mineral deposits that are related to the growth and evolution of the north-west North American continental margin. Withinp
Jan 1, 2000
-
Three-Dimensional Cfd Modeling Of Purging From Refuge ChamberThe MINER Act of 2006 mandated that all underground coal mines must install and maintain refuge chambers. Refuge chambers serve as a temporary shelter in case of emergency. Several factors affect the
Feb 27, 2013
-
Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone TechnologyBy R. Bokotko, J. D. Miller, J. Hupka
Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption
Jan 1, 2002
-
Geotechnical Conditions and TBM Selection for the Bay TunnelBy Luke Erickson
San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f
Jan 1, 2008
-
Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage ProjectBy Pratoomkhuan N. Lertsgoon
A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study
Jan 1, 2003
-
Characterization And Flotation Of Gold In Carbon Fines At The Fort Knox Mine, Alaska (cc005bca-da85-4fae-a40c-e9e9228511f1)By J. M. Hollow, D. E. Walsh, H. K. Lin, J. L. Oleson
At the Fort Knox Mine, Fairbanks, Alaska, carbon fines are generated during stripping, acid washing and kiln regeneration operations. Carbon fines are collected by a filter press because of their gol
Jan 1, 2001
-
Hydraulic Lifters Aid in Dragline MaintenanceDraglines are one of the largest land-based equipment moving across the earth. They typically ranging in size from2.5 to 6.5 kt (2,750 to 7,100 st). Their size, though, makes them difficult to mainta
Jan 1, 2004
-
Ventilation on demand (VOD) project ? Vale Inco Ltd. Coleman MineBy C. Allen
Vale Inco Ltd. is trialing several energy conservation initiatives in an effort to minimize costs and reduce green house gas emissions. The Ventilation on Demand (VOD) concept is a major project being
Jan 1, 2009
-
Technology News – Caterpillar to Produce Electric Drive Mining TrucksCaterpillar said it will produce a Cat line of ac electric drive mining trucks. The world’s largest manufacturer of mining and construction equipment said the addition of an AC electric drive truck l
Jan 1, 2006
-
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest InterceptorBy Samuel J. Gambino
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p
Jan 1, 2008
-
Uncertainty Based Push-Back Design Algorithm In Open Pit MiningBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Got Wet Or Dry? Get Mist Drilling.By Dan Armour
Bolting solutions traditionally offered only wet drilling or dry drilling options; each with advantages and disadvantages. Joy Mining Machinery has developed a Mist Drilling System that incorporates t
Jan 1, 2005
-
Ventilation And Climatic Simulation Of Drift/Stope In Metal Mines (79b7ea50-1959-4187-8956-bc551a79c260)By R. Gunda
Due to the rapidly increasing production rates and deepening of mine working areas, there is a drastic rise in the number of thermal issues to be addressed for maintaining a safe mine environment. As
Jan 1, 2011
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery SystemThe recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
Sights and Sounds of the Second Mexican Mining Rail ExcursionBy Beth Robinson
This first of two articles on the Second Mexican Mining Rail Excursion describes some of the more casual experiences participants enjoyed on last fall’s rail tour of major Mexican mining operations. I
Jan 1, 1982
-
Vale Inco?s international search to curtail diesel emissionsBy J. S. Stachulak
The Diesel Emissions Evaluation Program (DEEP), a research consortium formed in 1997 by Canadian mining companies, labour unions, and provincial and federal government departments, completed its work
Jan 1, 2009
-
Geology of the Clean Water Coalition?s Proposed Reach 4 Tunnel and its Effect on Design, Las Vegas, NVBy Ray Brainard
Treated effluent from the Clean Water Coalition (CWC) member agencies is currently discharged at an annual average rate of 6,570 l/s into the Las Vegas Wash, and is increasing annually. As the effluen
Jan 1, 2008