Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Tailings Dam Monitoring And Pre-Alarm System (TDMPAS) And Its Applications In MinesBy E. Sun
Tailings disposal is a significant consideration for the mining industry, with the majority of the ore processed in most mining operations ending up as tailings. Several tailings dam failure accidents
Jan 1, 2012
-
Investigation of Occupational Accidents in Western Lignite Corporation by Using the Efficiency Assessment Approach Mining, Metallurgy and Exploration (a017703a-5db6-4c3d-94be-c80359dfab6f)By Cem Şensöğüt, Özer Ören, Yaşar Kasap
The mining sector, which has an important place in terms of raw material and energy supply, is referred as a sector with one of the highest fatal accidents in comparison with other sectors. In this ce
-
Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54By J. J. Gusek
Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions
Feb 24, 1997
-
An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage FragmentsBy John F. Gamble
Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes
Jan 1, 2007
-
Identification And Enumeration Of Asbestos Fibers In The Mining Environment: Mission And Modification To The Federal Asbestos StandardBy Arthur M. Langer
Since the promulgation of the first Federal Asbestos Standard by the Occupational Safety and Health Administration in 1972, other federal agencies have modified the standard to better carry on their
Jan 1, 2008
-
Assessment Of Stable And Failed Pillars In Underground Limestone MinesPillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na
Jan 1, 2008
-
The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. MetroBy Carl G. Bock
INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven
Jan 1, 1976
-
Coal Beneficiation via the Tapered Fluidized Bed Using Magnetite with a Wide Size Range Mining, Metallurgy and Exploration (57dbcb5f-d720-4602-989e-b44427f0ae7a)By Xuchen Fan, Chenyang Zhou, Yuemin Zhao, Liang Dong, Chenlong Duan
A gas–solid fluidized bed using magnetite particles is an effective methodology for coal beneficiation in the field of dry coal cleaning. Broadening the size range of magnetite used in the bed decreas
-
Gold and Silver Exploration in Irian JayaBy D. Potter
In 1990, Freeport Exploration began regional reconnaissance exploration programs in Irian Jaya, the easternmost province of the republic of Indonesia (Fig. 1). Irian Jaya occupies the western half of
Jan 1, 1999
-
Inner City Slurry Tunneling—Project Asdam, Antwerp, BelgiumBy Klaus Rieker
North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified
Jan 1, 2007
-
Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station ProjectBy James McNally, Adam Stremcha, John MacGregor
With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i
Jan 1, 2007
-
An Investigation On The Surface Chemistry Of Some Rare Earth Minerals During Flotation By TOF-SIMS (I-Bench Scale Tests)By S. C. Chelgani
The Thor lake deposit is a world class resource of rare earth (REE) metals and minerals in Canada. Development work to optimize a REE mineral recovery process flow sheet is underway, however, given th
Feb 27, 2013
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic ShakingBy Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008
-
Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case StudyBy Y. Q. Zhang, S. S. Peng
Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st
Jan 1, 2004
-
Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control ProblemsBy K. Saikiran, A. R. Nalla
Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat
Jan 1, 2000
-
Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a
Jan 1, 2009
-
The Coronado Traffic Diversion TunnelBy Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone
The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado
Jan 1, 2001
-
International Standards in Public Participation in Financing Oil and Gas Pipelines: The Transparency of Risk Management Measures and Emergency Response PlansBy E. Nickel
"Bi- and multilateral banks as well as export credit agencies in the OECD countries, but also numerous commercial banks, last year committed themselves to compliance with the World Bank’s standards. T
Jan 1, 2005
-
Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady
Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp
-
Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development frameworkBy Z. Hyder, M. Karmis
Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.
Jan 1, 2011