Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Using New Technologies to Achieve Customer Tailored Fragmentation

    By Felix Degold, Mark Ganster

    Achieving a customer optimized fragmentation by using robust data from new technologies e.g. GPS positions of boreholes, fragmentation analysis to calibrate the geology and fragmentation prediction mo

    Feb 1, 2020

  • ISEE
    Explosives Casting Technology in Surface Mining

    By D E. Shaw, J B. Case, J Gusek

    Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul

    Jan 1, 1980

  • ISEE
    The Fundamentals of a Good Electronic Initiation System Program

    By Thomas Barkley

    Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con

    Jan 1, 2011

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    The Effect of Prill Specifications on Emulsion-ANFO Blends (dfcf65b3-c26f-475a-ba27-2ec8841d710f)

    By Greg S. Williams, David L. McDorman, Richard W. Givens

    This paper examines the effect of prill size consistency, internal particle density, and oil absorbency on Ammonium Nitrate Fuel Oil (ANFO)-emulsion blends. By analyzing these physical properties of p

    Jan 1, 1990

  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle Mine

    By Tony Francelj, D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi

    Jan 1, 2002

  • ISEE
    Diamonds are a Driller's Best Friend

    By Langdon T. Mitchell, Karl Ingmarsson

    The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.

    Jan 1, 1999

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Josh Calnan, Paul M. Holmgren, Abigail N. Styer

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

    Feb 1, 2020

  • ISEE
    Underground Blast Monitoring and Rock Mass Anisotropy

    By Jody Todd, Ernesto Villaescusa, Ronald Lachenicht, Kelly Fleetwood

    In the underground environment, characterisation of a rock mass during the mining cycle becomes increasingly difficult due to a lack of rock mass exposure for measurement or observation. In most cases

    Jan 1, 2008

  • ISEE
    Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion Product

    By Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs

    Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g

    Feb 6, 2023

  • ISEE
    Aquarium Tests to Study the Detonation Behaviour of a Non-ideal Explosive.

    By M. Araos

    Non-ideal explosives can be characterised by different methods like velocity of detonation measurement, double pipe tests, underwater tests, aquarium tests, etc., to name a few. Both aquarium and velo

    Jan 1, 2024

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling with More Element Shapes and Energy Partitioning

    By Stewart A. Silling, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    GEM (Geologic Element Motion) is a Distinct Element Method (DEM) for modeling blast-induced heave. It was developed with a very fast computational algorithm that efficiently treats many different elem

    Feb 6, 2023

  • ISEE
    "Optimized Energy Distribution in Bench Blasting Through Measurement Techniquesand “Multi Energy” Explosives"

    By Pierre De Pasquale, Gilles Jauffret, Ricardo Chavez

    "When blasting in quarries or mines, the main source of inconsistent results is directly related to thenon-homogeneous energy distribution through the rock-mass volume. This variation has differentori

    Jan 1, 2016

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for Success

    By Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta

    During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru

    Jan 1, 2017

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010