Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Non-Destructive Testing Of Piles - A Case History - Summary

    By Manish Kumar

    One of the recent advances in the field of testing of concrete piles is the Non-Destructive testing (NDT) of piles. This paper deals with a specific project where this technique was employed along wit

    Jan 1, 1996

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 260 Load Tests

    By Jesús E. Gómez

    A recent bridge underpinning project provided a unique opportunity to obtain information on the load-deflection response of 260 hollow-core bar micropiles. All production micropiles were proof-tested

    Jan 1, 2007

  • DFI
    Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway

    By Dharmil Patel, Michael J. Chow

    "Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;

    Jan 1, 2016

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Load Tests Of Bored Piles In Weathered Bedrock

    By James C. Scott

    Compression and tension load testing were performed on bored concrete piles installed to depths of 18 to 34 meters below excavation levels for a large mixed-use development in Kuala Lumpur, Malaysia.

    Jan 1, 2007

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff Clays

    By Alexander Scheuermann, Martin D. Larisch, David J. Williams

    "Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den

    Jan 1, 1900

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building

    By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi

    "The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States

    Jan 1, 2005

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Optimization Of Pile Length Using Decision Analysis With Information From Load Tests During Construction

    By Jiun-Yih Chen

    Pile load tests are regularly used to verify pile capacities. Sometimes, they are used to optimize pile designs. This paper presents a case study based on a real project, in which the information ob

    Jan 1, 2009

  • DFI
    The Miniaturization Of Diaphragm Wall Technique – The Cube System

    By Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off

    Oct 1, 2022

  • DFI
    The Stability Of A Diaphragm Wall ? Synopsis

    By X. L. Chen

    The diaphragm walling has been recently adopted in one of the largest excavation of deep foundation engineerings in Shanghai, China with dimension of 90m in length, 50m in width and 13m in depth to so

    Jan 1, 2010

  • DFI
    Verification of Installation and Performance of ACIP Piles for Bridges

    By W. Morgan NeSmith

    "The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu

    Jan 1, 2017

  • DFI
    Axial Capacity Of Drilled Shafts In Soft Shale

    By Kanagarajah Ravishankar

    Drilled shaft (caisson) foundations are extensively used in the past. In the central part of New Jersey, the soils consist of silt and clayey silt overlying Triassic age shale bedrock. The shale is fr

    Jan 1, 2006

  • DFI
    St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program

    By Jeffrey A. Gebhard

    As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes

    Jan 1, 2009

  • DFI
    Interpretation Of Full Scale Horizontal Pile Loading Tests In Sand Analysis Of P-Y Curves

    By Ali Bouafia

    Five full-scale horizontal loading tests of piles carried out by the LCPC in France are interpreted in order to analyse P-Y load-transfer curves. The experimental piles are either bored or jacked into

    Jan 1, 2002

  • DFI
    Dynamic Testing Of Model Piles - A Laboratory Study - Synopsis

    By P. Srinivasulu

    The popular theoretical models used for assessing the dynamic behaviour of piles under vertical and lateral excitations are critically reviewed. An experimental study is presented on model piles with

    Jan 1, 1996