Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Background Information on N.B. Reclamation Project

    By B. B. Meadows

    "The Minto-Chipman Strip Mining Reclamation Project was initiated to re-vegetate the spoil piles remaining from strip mining operations.All available information was studied by the team responsible, a

    Jan 1, 1970

  • CIM
    The Australian coal industry future developments

    By Trevor McGiddy

    "Australia's prosperity relies significantly on income generated from exports of resources and agricultural products. In 1989-1990, coal was Australia's most valuable export commodity, contr

    Jan 1, 1992

  • CIM
    Établissement D?un Programme Académique En Gestion Environnementale Minière En Bolivie

    By Denis Bois

    La Bolivie est un pays en développement qui compte une tradition minière qui précède même l?établissement espagnol en Amérique. Pendant toutes ces années, l?exploitation minière s?est faite sans grand

    May 1, 2001

  • CIM
    Wet grinding of asbestos ores through reduction of slurry viscosities (d23459a3-b729-4556-9e3c-f23ec7e052f3)

    By D. E. M. Plaumann

    "The wet grinding of asbestos has attracted the attention of engineers for many years as a means of improving fibre liberation from the ore. Today, added impetus for wet grinding has resulted from a n

    Jan 1, 1988

  • CIM
    Design of steel arch supports for gate roadways

    By Pierre Choquet

    "The whole work carried out both in situ and in laboratory by a research group of the West German collieries is presented. This work has led to a design method of steel arch supports for gate roadways

    Jan 1, 1986

  • CIM
    Stress Measurement: The GRC Perspective

    By N. Bahrani

    Knowledge of the state of stress in the Earth?s crust is very important to the safe and efficient development of underground excavations in mining and civil engineering projects. A number of methods h

    Aug 1, 2013

  • CIM
    Training Operators for Today’s Concentrator

    By S. Kaushik

    The control room in a mineral processing plant has become increasingly complicated with complex unit operations coupled with rapidly evolving systems of sensors and control. Even with significant auto

    Jan 1, 2014

  • CIM
    Understanding Surface Subsidence Parameters of Fully Mechanized Caving Mining Based on Those of Fully Mechanized Mining in China

    By Naizhong Xu

    During the past 30 years, fully mechanized caving mining has played a positive role in the improvement of the efficiency of coal production, but which has also had a great influence on the mining envi

    Aug 1, 2013

  • CIM
    People, quality and processing improvement

    By L. M. Ame, W. D. Harwood

    "This paper outlines a management philosophy aimed at promoting employee involvement, quality and process improvement at Inco 's Thompson operations. It describes the use of statistical process c

    Jan 1, 1990

  • CIM
    A Field Assessment of the SIUC Innovative Spray System for Continuous Miners

    By Yoginder P. Chugh

    Beginning in 2010, a scientifically-founded water spray system for continuous miners (CMs) has been in development at Southern Illinois University that significantly reduces respirable dust exposure f

    Aug 1, 2013

  • CIM
    Cassiar Asbestos Mine, Cassiar, British Columbia

    By Fred G. Hewett

    Cassiar Mine in northern British Columbia began development in 1952. The deposir is found on rhe west limb of rhe McDame Synclinorium in a Mississippian serpentinite body. The serpenltntte, one of the

    Jan 1, 1984

  • CIM
    Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, Ontario

    By Victor A. Sowa

    "Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body

    Jan 1, 2003

  • CIM
    Carbon-in-Pulp and Carbon-in-Leach Adsorption Circuits -Optimization of Design Using the Carousel System

    By N. Morrison, E. J. Rogans, A. J. Macintosh, N. Schoeman

    "The design of carbon-in-pulp (CIP), and carbon-in-leach (CIL) adsorption circuits has essentially remained unchanged since the early days of the carbon process for gold recovery. For CIP circuit the

    Jan 1, 1998

  • CIM
    Estimation and Planning Tool for Industrial Construction Scaffolding

    By C Kumar

    Scaffolds are temporary structures built to facilitate construction activities on site. A considerable amount of resources are allocated to scaffolding on industrial projects. Variability in geometric

    Aug 1, 2013

  • CIM
    Perlite and pumice in British Columbia

    By Z. D. Hora

    has been no commercial production of either perlite or pumice in British Columbia. Several promising occurrences are known to exist but their development has been delayed due to difficult access and /

    Jan 1, 1984

  • CIM
    Assessment of LHD Operator Visibility and Posture Using Computer Simulation

    By A. Jeffkins

    Visibility is restricted when operating load haul dump vehicles resulting in a number of serious accidents in the Ontario Mining Industry. One of the leading causes of these accidents is the inability

    May 1, 2003

  • CIM
    Establishing Total Airflow Requirements for Underground Metal/Nonmetal Mines with Tier IV Diesel Equipment

    By J. D. Stinnette

    Traditionally, airflow requirements for diesel equipment operating in underground environments such as mines and tunnels were determined by multiplying the vehicle power by a ventilation rate that was

    Aug 1, 2013

  • CIM
    Uranium Recovery from Saline Solutions with Weak Base Anionic Resins

    By M. Fainerman-Melnikova

    The use of strong base ion exchange resins for the extraction of uranium was pioneered in the 1950?s. Ion exchange technology is applicable to dilute leach solutions such as those obtained from in-sit

    Aug 1, 2010

  • CIM
    Long-Term Planning of an Underground Mine Using Linear Programming

    By George McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    May 1, 2003

  • CIM
    Calculation of Confidence Intervals of the Block Estimates using Block-Support Anamorphosis and Discrete Gaussian Variogram

    By Abani R. Samal

    The Fe assay values from the diamond drill-holes within a magnetite deposit of magmatic origin are utilized in this study. Only assay data from the unoxidized magnetite mineralization was utilized. Th

    Oct 1, 2009