Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot-Scale and Continuous Bench Testing of the Aims Cn-DTM Cyanide Destruction Process on an Australian Gold Plant Tailings Effluent

    By S. Glen

    Cyanide management practices on modern gold plants are becoming more onerous, due to environmental pressures, particularly for signatories to the International Cyanide Management Code. Operations are

    Jan 1, 2011

  • CIM
    Influence of Selected Frothers on Pre-Flotation of the Kupferschiefer Ore

    By Andrzej Luszczkiewicz, Magdalena Duchnowska, KGHM Polska Miedz S. A., Witold Pawlos, Jan Drzymala, Alicja Bakalarz, Przemyslaw B. Kowalczuk

    A pre-flotation process of the Kupferschiefer ore with only frothers produces a concentrate enriched in carbonaceous matter and tailings for further upgrading steps. A partial removal of easy-to-float

    Jan 1, 2016

  • CIM
    Flotation Behavior and Mechanism of Chalcopyrite and Galena in Presence of O-Isopropyl-N-Ethyl Thionocarbamate

    By Yongjie Bu, Wei Sun, Zhiyong Gao, Yuehua Hu, Hongbiao Tao, Runqing Liu, Central South University

    "The flotation behavior of O-isopropyl-N-ethyl thionocarbamate (IPETC) and pH for chalcopyrite and galena was studied through pure mineral test, adsorption quantity determination, solution chemistry c

    Jan 1, 2016

  • CIM
    Overhead Protection Systems (OPS): Some Recent Applications

    By M. C. Walton, W. Roelofs

    ABSTRACT: In most cases, a refractory repair involves dealing with used refractory linings above shoulder height, defining these as overhead refractories. This paper details a method of personnel prot

    Jan 1, 2012

  • CIM
    Geology of the Churchill Copper Deposit

    By J. M. Carr

    The history, geological setting and local geology of the Magnum vein system, 100 miles west of Fort Nelson in northeastern British Columbia, are described. The system comprises a number of quartz-anke

    Jan 1, 1971

  • CIM
    Design of Teach Pendant for Robot Glazing System

    By Seungyeol Lee

    Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc

    Aug 1, 2013

  • CIM
    New Environmentally Friendly Corrosion Inhibitor as Replacement for Chromate

    By M. Reda

    Because of the adverse environmental effect of Chromate, Molybdate ions had been investigated as replacement for Chromate and the results had shown not to be encouraging. Film deposited from peroxopol

    Jan 1, 2010

  • CIM
    Pollution Problems Associated with Sullivan Mine Hot Muck

    By R. L. Brown

    The burning sulphide ores in the Sullivan Mine generate sulphur dioxide gases. This paper is concerned with a description of the environmental impact of SO2 on air quality in the mine and on the surfa

    Jan 1, 1977

  • CIM
    Automatic Generation of BIM Using Parametric Family

    By J. Lee

    A monolithic caisson is one of the major structural components commonly used in the construction of docks, breakwaters, and container terminal quay walls. Since the structure of monolithic caissons is

    Aug 1, 2013

  • CIM
    Red Lake Gold Shore Mine

    By J. B. Mawdsley

    "The Red Lake Gold Shore mine is 4/5 mile west of the town of Red Lake, Ontario, and a mile northwest of the Howey mine. It came into production in August 1936, and in a little over 2 years produced 2

    Jan 1, 1954

  • CIM
    Ductility of Magnesium Rods Continuously Cast by a Heated Mould Process

    By K. Kudo

    Magnesium rods of 99.95% purity and approximately 6 mm in diameter were continuously cast at rates of between 15 and 25 mm/min by a heated mould process and their mechanical properties evaluated. It w

    Jan 1, 2006

  • CIM
    Development and Implementation of a Risk Mitigation Strategy to Mine a Primary-Secondary Production Stope in a High-Stress Environment at VALE Creighton Mine

    By Allan R. Punkkinen

    Safe extraction of the valued ore resource in the deep levels of VALE Creighton Mine has progressed in a pillar-less fashion using vertical retreat, slot-slash and uppers retreat methods since the ces

    Jun 1, 2012

  • CIM
    Spectroelectrochemistry of Enargite II: Reactivity in Acidic Solutions

    By H. Huang, R. N. Gow

    Acidic treatment of enargite (Cu3AsS4) dissolves both arsenic and copper from the mineral and then attempts to separate them in the leach solution. The reactivity of enargite was examined in acidic to

    Jan 1, 2014

  • CIM
    Extraction of No. 2 East Pillar at Waite-Amulet Mines, Limited

    By M. A. Cawley, J. W. Jordan

    "IntroductionTHE ORE PILLARS in the lower ""A"" ore body of Waite Amulet Mines, Limited, can be divided into two groups, those mined in the open by sub-level blast-hole methods, and those to be mined

    Jan 1, 1955

  • CIM
    Phase Relations and Precious Metals Distribution in the Cu-Fe-S-As and Cu-Fe-S-Sb Systems Saturated With Carbon at 1473 K

    By L. Voisin, K. Itagaki

    In the reductive smelting of the copper concentrate like a blast furnace operation using coke as fuel and reductant or in processing the copper concentrate which contains coal in the bulk, a sulfur-de

    Jan 1, 2007

  • CIM
    Quirke Lake Trough

    By H. G. Harper, R. C. Hart

    "The Mississagi quartzite is the basal formation of the Quirke Lake trough. As it is traced around the rim, a gradual change in dip is observed, as follows:Northwest corner 50 degrees south.Algom Quir

    Jan 1, 1949

  • CIM
    Bankfield and Tombill Mines

    By A. F. Matheson

    "Bankfield Consolidated Mines, Limited, and Tombill Gold Mines, Limited, in the Little Long Lac area, Ontario, mined an orebody that was common to both. The discovery' of this orebody was made by surf

    Jan 1, 1954

  • CIM
    A Mechanistic Model of Axial Charge Segregation in Rotating Drums

    By Elbasher M. E. Ahmed, Indresan Govender

    "A mechanistic model of axial charge segregation in rotating drums is presented. We show that granular material composed of different frictional properties diffuse into axial bands as a consequence of

    Jan 1, 2016

  • CIM
    Autogenous Electron Beam Welding of Aluminum Alloy 2024

    By P. Wanjara, M. Xiao

    During fusion welding of aluminium alloys, the avoidance of defects (such as porosity, oxides, hot cracking, undercutting) as well as the ability to optimize the microstructure-property characteristic

    Jan 1, 2006

  • CIM
    Monitoring of Dynamic Energy Resistant Rockbolts: Laboratory and Field Results

    By F. Charette

    Instrumentation has been developed that can monitor the strain applied to a D-Bolt up to 7.5% elongation. The technology far exceeds the limit for foil resistance strain gauges. In the laboratory the

    Aug 1, 2013