Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quality Control Systems at BHP's Mount Whaleback Iron Ore Mine, Newman, Western Australia

    The Mount Whaleback iron ore deposit at Newman, Western Australia comprises the largest known continuous iron ore deposit in Australia, originally with a Measured Resource in excess of 1700 Mt of h

    Jan 1, 1997

  • AUSIMM
    Underground Mine Production Scheduling Using Mixed Integer Programming

    Production scheduling is an important element of the mine planning process. The production schedule specifies the quantities of mineral to extract, the source of this ore, the timing of extraction a

    Jan 1, 1995

  • AUSIMM
    Rehabilitation At Stawell Joint Venture

    It was once considered sufficient to revegetate old mine sites using grass or trees. At the commencement of the Stawell JV (SJV) operation in 1981, management determined that pre-existing vegetation w

    Jan 1, 1992

  • AUSIMM
    Conventional Mining of Coal for Power Generation

    The Electricity Commission of New South Wales operates three power stations located on Lake Macquarie and Lake Munmorah. Coal for these power stations is supplied by three collieries operated by th

    Jan 1, 1972

  • AUSIMM
    Energy for TomorrowÆs World

    The reality is that in today's world almost half of nearly six billion people on the planet do not have access to commercial energy and the services it brings. Based on UN projections, in 30 ye

    Jan 1, 1997

  • AUSIMM
    Development of Design Criteria for Upgradeable Friction Hoists

    Future depth and production limitations of an ore hoisting system are fixed by its initial design criteria. There is little scope to extend these limitations once installation is completed. Depth and

    Jan 1, 2005

  • AUSIMM
    Process Control Developments at Isa Mine Mount Isa

    By Wickham P

    Digital computer based control systems are used to implement control and monitoring over most unit operations in Mount Isa Mines Limited lead-zinc concentrator and copper concentrator. Implementati

    Jan 1, 1978

  • AUSIMM
    Trial of 14/12 millMAX <sup>TM</sup> Pump in the Ok Tedi Grinding Circuit

    By O K. Paki

    A 14/12 millMAXTM pump was installed in the SAG1 grinding circuit as a trial replacement for the existing 12/10 Warman for performance comparison and in an attempt to overcome process difficulties. Kr

    Jan 1, 2000

  • AUSIMM
    Case Studies on the Performance and Characterisation of the Froth Phase in Industrial Flotation Circuits

    By S R. Grano, M Vera

    This paper deals with two separate case studies investigating the froth phase performance and characterisation of two industrial rougher/ scavenger flotation circuits. Froth phase performance was quan

    Jan 1, 2005

  • AUSIMM
    Production of Zirconia from Zircon Sands

    By Sinha NH

    ICI Australia and CSIRO have developed a novel process for extraction of zirconia from zircon sands. The two stage process involves a high temperature step and a wet chemical processing step. A pilot

    Jan 1, 1986

  • AUSIMM
    Exploration Techniques for Platinum Group Metals in Papua New Guinea

    By Collins AR, Meares RMD, Graham JM

    Exploration programs for both alluvial (placer) and hardrock platinum group metal deposits are being conducted in Papua New Guinea by a joint venture between Degussa AG and Pancontinental Mining L

    Jan 1, 1987

  • AUSIMM
    The Art of Coarse Mining (9bfbf208-e7d5-4f60-88bb-3a72fd04f1a8)

    As an Inspector of Mines in Queensland, my main responsibilities include the enforcement of the Mining Act 1968 - 1986, the Mines Regulation Act 1964 - 1989 and the Metalliferous Mining regulations 19

    Jan 1, 1990

  • AUSIMM
    Green Policies at Home and Abroad (a85b276b-7aa1-4e39-bcf3-9163721e5461)

    Green policies have gained momentum since the 1972 Stockholm Environment Conference. The environmental movement has influenced political initiatives both in New Zealand and abroad. Governments and int

    Jan 1, 1990

  • AUSIMM
    Pyrite Activation in Amyl Xanthate Flotation With Nitrogen

    By G L. Simmons, K M. LeVier, R Kappes

    The low potential hydrophobic state of pyrite in amyl xanthate (PAX) flotation with nitrogen is of particular interest with regard to the N2TEC flotation technology currently being used for the recove

    Jan 1, 2005

  • AUSIMM
    Investigation of the internal mechanical structure of Mars based on geometrical patterns of faults

    By Y Tsukurimichi, D Asahina, T Endo, T Takemura

    Scientific knowledge of Mars’ surface morphology and internal geological structure has been accumulated through satellite imagery and numerical topographic data using remote sensing technology, as wel

    Nov 29, 2022

  • AUSIMM
    A Method for the Accurate Determination of the Viable Mineral Leaching Bacteria Thiobacillus Ferrooxidans, Using Radioisotopic 14CO2 and Autoradiography

    By Madgwick J

    A novel method for determining viable cells of the mineral leaching bacterium Thiobacillus ferrooxidans has been developed. The cells were collected on 0.45/Lm cellulose acetate filters, washed with a

    Jan 1, 1987

  • AUSIMM
    Taxation of Mining Companies in New Zealand

    New Zealand&apos;s Land and Income Tax Act 1954 contains unique incentives for companies engaged in mining certain specified minerals or petroleum. Sections 152 and 153 provide for the taxable incom

    Jan 1, 1971

  • AUSIMM
    Arc Obduction and Polyphase Mineral Plumbing System in the New Guinea Highlands

    ABSTRACT&apos; Mainland Papua New Guinea is formed of a microcontinental / island arc system (?Eocene - latest Oligocene Sepic arc) which in Middle to Late Miocene times was obducted over the northw

    Jan 1, 1997

  • AUSIMM
    Mine Environment Neutral Drainage (MEND) Initiative

    By E J. Gardiner, C M. Hogan

    Acidic drainage has long been recognised as the largest environmental liability facing the mining industry, and to a lesser extent, the public, through abandoned mines. The Canadian Mine Environment N

    Jan 1, 2003

  • AUSIMM
    Men and Materials Handling In 1100 Orebody Of Mount Isa Mines Limited

    By Kennedy B. J

    The 1100 Orebody is the main copper production area of Isa Mine with an output of 390 000 tonnes per four week period and a work force of approximately 260 men per shift. Currently a total of 56 ni

    Jan 1, 1977