Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineralization and Alteration of a Compound Greisen and Skarn Deposit

    Shizuyuan deposit is a compound type of greisen and skarn associated' with W,mo,Sn,and BI mineralization. Tungsten-bearing skarns are located at the contacts between carbonate rocks and gran

    Jan 1, 1987

  • AUSIMM
    Sustainable Success

    Every year my consultancy business reviews over 100 mines worldwide, primarily focusing on property and business interruption risk. What we have found is that the most successful mines have: identifi

    Jan 1, 2003

  • AUSIMM
    Equity Financing (From the Risk Management Perspective)

    Equity finance provides the most suitable and frequently the only access to capital during the exploration and evaluation stages of resource projects when project risk is at its highest. Investors a

    Jan 1, 1994

  • AUSIMM
    The Benefits of Flotation Bank Air Profiling

    By J J. Cilliers, K Hadler

    The potential of air rate profiling to significantly improve the flotation performance of a bank of cells has been shown by numerous studies. To date many profiles have been evaluated; balanced, incre

    Jan 1, 2009

  • AUSIMM
    Study on a New Technology of Separating Seabeach Placer with Mixed Collectors

    By Baoqi S, Zhengbing C, Wenguang L

    A new flotation method is introduced for separating zircon from rutile and other Ti-bearing minerals at normal temperature, using a mixture of cationic and anionic collectors without any acid, alkal

    Jan 1, 1993

  • AUSIMM
    Underground Mine Development - Past and Future

    By Bounsombath P

    Underground mine development remains as one of the most important factors in cost effective mining. Various forms of continuous development have been proposed with some of the earliest conceived centu

    Jan 1, 1992

  • AUSIMM
    Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant

    The reasons for including treatment of water in Whites and Intermediate open cuts in the overall rehabilitation strategy are given in the introduction. The target quality of the treated water also

    Jan 1, 1984

  • AUSIMM
    Porphyry Copper-Molybdenum (Gold) Deposits of Southern and Western China - Contrasting Arc and Intracontinental Settings for Ore Formation

    By N C. White, C M. Allen, I H. Campbell

    Porphyry Cu-Mo (Au) deposits of southern and western China are localised in ancient arc environments and continental-collision orogenic belts. Despite the contrasting tectonic setting, the known depos

    Jan 1, 2008

  • AUSIMM
    Cost-Effective Native Revegetation on Alluvial Tin Mining Sites in the New England Region of New South Wales

    Tin mining has taken place in the New England region of New South Wales since 1872. Until fairly recent times there was little pro- vision made for environmental protection. Mining methods,which in

    Jan 1, 1987

  • AUSIMM
    Converter Slag Flotation Practice at Mount Isa Mines Limited

    By Watsford RMS, Schache IS, Slaughter PJ

    As part of the overall Copper Smelter expansion activities at Mount Isa Mines from 1970 - 1975, a decision was made to open circuit the converter slag from the Smelter and treat this product by flo

    Jan 1, 1978

  • AUSIMM
    Golden Cross Mine - Gold Mining in a Sensitive New Zealand Environment (7e135577-c7a0-4219-a3fe-f7032e5b9261)

    The Golden Cross mine is situated in a sensitive environmental setting on the North Island of New Zealand, about 150 kilometres south-east of Auckland and about 8 kilometres NW of Waihi. The mine is

    Jan 1, 1995

  • AUSIMM
    Productivity Improvement

    Cordeaux Colliery is more logically sited than the historic escarpment Corrimal Colliery, on the same reserve. At Cordeaux the modernisation of mine plans and equipment and the introduction of high pr

    Jan 1, 1991

  • AUSIMM
    Application of Semtech Optical Process Control System at Mount Isa MinesÆ Copper Converters

    By O Pasca, B Hogg

    Consistent slag blow end point detection remains one of the challenges in the Peirce-Smith converters at Mount Isa MinesÆ Copper Smelter. Under blowing results in foaming on copper blow and carry forw

    Jan 1, 2005

  • AUSIMM
    Non-Mining Costs Associated with a Mine Development

    All companies and individuals who embark on a business venture incur costs. For the most part these costs can be conveniently categorised, firstly into capital and operating costs and then into the va

    Jan 1, 1977

  • AUSIMM
    The Origins of Western Mining Corporation and Some of the Men Who Shaped It

    During its 60 years of existence the growth and development of Western Mining Corporation (WMC) has been greatly influenced by the men who led it. For the most part they, rather than any chance circum

    Jan 1, 1993

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    Decreasing Operating Costs and Soluble Loss in Copper Hydrometallurgy With Use of Innovative Solvent Extraction Circuits

    By A Nisbett

    The largest single operating loss in many hydrometallurgical plants is the poor recovery of leached product in the solids sent to tailings. Any reduction in the concentration of the valuable species i

    Jan 1, 2005

  • AUSIMM
    Improved Recovery in Highwall Mining using Backfill ACARP Project C3052

    By G K. Searle

    In Australia, coal mines have generally not adopted filling to increase mining recovery. The aim of this project, entitled æImproved recovery in highwall mining using backfillÆ, was to examine the fea

    Jan 1, 1998

  • AUSIMM
    Quality Assurance

    Quality Assurance has become a buzzword amongst governments and industry. Notwithstanding the world class work done by its committees in developing codes of ethics and of practice in field geological

    Jan 1, 1994

  • AUSIMM
    The Behaviour of Cobalt During Nickel Smelting and Converting

    This paper outlines the thermodynamic and mass balance principles which affect the distribution of cobalt between matte and slag during the pyrometallurgical treatment of nickel-copper sulphides and c

    Jan 1, 1994