Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings ImpoundmentBy G W. Wilson
Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b
Jan 1, 2003
-
Benefits of Utilising an Increased Tailings Slurry DensityBy D A. Williams
The conventional method of transporting mine tailings from a process plant to a tailings storage facility (TSF) is in the form of a low to medium density1 slurry, which can be pumped using centrifugal
Jan 1, 2002
-
Prefeasibility Studies and the Problems in their AuditingThere is considerable variability in the level of detail incorporated in prefeasibility studies relating to mining developments. Hence, when undertaking a review or audit, it is critical to attempt to
Jan 1, 1990
-
Technical note-outbursts in Australian coal mines: a petrographic factorBy Botz R. W
Macroscopic and microscopic studies of the outburst-prone Gemini Coal (Bowen Basin) showed that outbursts were associated with a localized inertinite-rich ply. Previous studies of the Gemini Coal had
Jan 1, 1986
-
Milling at Great Western Consolidated No Liability, Bullfinch, W.A.By Howard G. L
The gold treatment plant of Great Western Consolidated N.L. is at Bullfinch, Western Australia, 22 miles north of Southern Cross, which is 100 miles west of Kalgoorlie. A railway to Southern Cross con
Jan 1, 1956
-
A Clearer View on Thickener ResearchBy J B. Farrow
The AJ Parker Cooperative Research Centre for Hydrometallurgy carries out research on behalf of, and in collaboration with, the Australian mining industry. As might be expected, much of its research i
Jan 1, 2000
-
System of Geological Plans and Sections of North Broken Hill LimitedThe inauguration of a geological department for the mines of North Broken Hill Limited necessitated the provision of accurate plans and sections upon which geological facts and projections might be pl
Jan 1, 1940
-
Performance Driver Trees for Optimising Open Pit OperationsPerformance driver trees or KPI trees are reasonably well-known tools for analysing performance in mining operations. However, the tools are often not user friendly. They may be technically correct bu
Jan 1, 2007
-
The Use of Computers in the Analysis and Steady State Optimization of Metallurgical ConcentrationsBy Weller KR
Computer programs are described which help the metallurgist to process sample data from a plant survey; to carry out simple mass balance calculations; to present the results of circuit and equipmen
Jan 1, 1983
-
Portable Data Collection in the Mining IndustryBy Churchill J
A suite of software programs has been written to provide the field engineer or geologist with the capability to collect and store data directly into small, portable handheld computers. This allows
Jan 1, 1986
-
Comparative Cost of Rock Drilling UndergroundDURING a period extending over about the last two and a half years, the performances of various types of rock drills in use at the mining department of the Zinc Corporation have been recorded as close
Jan 1, 1923
-
Telfer Project ù Mine Dewatering ù Risk Assessment and Concept OptimisationThe Telfer Gold Mine, owned and operated by Newcrest Mining and located in Western Australia, is currently being expanded. A new underground sublevel cave development is proposed along with an appreci
Jan 1, 2003
-
The ôPassiveö Continental Margin of Eastern Australia û The Myth Shattered by the 1989 Newcastle Earthquake: The Need for More Realistic Earthquake Risk EstimatesDisastrous earthquakes are a reality on the Australiancontinent. Unfortunately it has taken the fatal 1989 New-castle earthquake to demonstrate to all Australians that we do not reside on a "stable co
Jan 1, 1990
-
Risk Analysis and Decision-Making - A Case StudySolid EnergyÆs project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each level, sp
Jan 1, 2007
-
Numerical Simulations of Bulk Handling in Screw Conveyors by Three-Dimensional DEMBy P Cundall
Three-dimensional DEM (Distinct Element Method) simulations were conducted in order to examine the performance of screw conveyors, which are installed to transport bulk materials as parts of many indu
Jan 1, 2000
-
Effective CommissioningBy Lane G
This paper addresses project commissioning, that is, activities that culminate in the transfer of a project from the construction phase to routine plant operation. These activities should be initia
Jan 1, 1997
-
Minimising Greenhouse Emission from Coal by the Collection and Use of Coal Seam MethaneBy Zamel GI
The utilisation of fossil fuels, including coal (of which Australia is a large producer and exporter) is a significant contributor to the emission of greenhouse gases. Methane gas, formed during the
Jan 1, 1989
-
Use of Ion Exchange Resin for Cyanide Management During the Processing of Copper-Gold OresBy K Lee, K Fernando, S Rayner
Copper-gold ores have been technically difficult and uneconomical to process due to high consumptions of cyanide. Many copper oxide and sulphide minerals react with cyanide to form copper cyanide comp
Jan 1, 2000
-
Old Iron, New Iron - A Story of Revival at Frances CreekTerritory Iron has seen fit to revive the old Frances Creek iron ore mine some 30 years after it ceased operations in AustraliaÆs Northern Territory. The key to this revival has been the changes that
Jan 1, 2007
-
Can a simple price-rise unlock complex copper orebodies?By R Valenta, J Owen, D Kemp, E Lebre, G Corder, J Thomas
Numerous recent analyses have shown that future demand for a broad range of critical commodities is unlikely to be met by new discoveries and recycling alone. The only practical alternative source to