Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Production Scheduling Using Linear and Integer Programming

    By T GRAHAM-TAYLOR

    A trend towards mining more complex and economically marginal orebodies, often combined with increasingly tight product specifications, increases the number of variables which need to be considered

    Jan 1, 1992

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    The Causes of Heavy Mineral Loss From Mineral Sands Wet Concentrators

    By Alford R. A

    The causes of the loss of heavy mineral from mineral sands wet concentrators were identified through detailed surveys of two such concentrators. It was found that tray and spiral sluices preferentiall

    Jan 1, 1991

  • AUSIMM
    Overview of the Acid Rock Drainage and Overburden Management Program at PT Freeport Indonesia Operations in Papua Province, Indonesia

    By D Michaelsen, S Miller

    The Grasberg Mine is a copper and gold open pit mine operated by PT Freeport Indonesia (PTFI) and located in the high equatorial mountains of the Indonesian province of Papua. The climate is alpine/su

    Jan 1, 2003

  • AUSIMM
    Multiple Geological Models

    By M J. Nugus

    A substantial cost is invested into the data collection phase of any exploration or development program; notwithstanding, it is impractical to expect a database of information can be collated to ensur

    Jan 1, 2006

  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Quantitative X-Ray Mineralogy of Iron Ore and Scales

    By K Knorr

    Desktop X-ray powder diffraction using a D2 PHASER equipped with fast linear detector was performed on several iron ore and mill scale samples. Data were analysed using cluster analysis and Rietveld q

    Jul 11, 2011

  • AUSIMM
    Fluid-Dynamic Aspects in Blast Furnace with Gas Injection into the Stack

    By Quintiliani G, Giordano V

    A research field of interest and a topical subject with the aim to reduce a considerable amount of coke in ironmaking is the injection into blast furnace stack of hot reducing gas combined with use o

    Jan 1, 1975

  • AUSIMM
    Characterising coalmine roof using measurement-while-drilling technology

    By M Khanal, J Qin, B Shen, Y Duan, X Luo

    Gaining confidence in interpreting rock and strata properties of the coalmine roof is necessary for design, maintenance, modelling and optimisation of roadways supports. One of the key causes of roadw

    Nov 29, 2022

  • AUSIMM
    Cobaltite in the Broken Hill Lode (03939c9c-b588-4802-a8a6-05e63bc11f8d)

    The detailed work done by Stillwell and Edwards on the occurrence of cobaltite and safilorite-Iollingite at the South Mine, followed by its presentation as a paper to the Institute, calls for, a few n

    Jan 1, 1944

  • AUSIMM
    Block Caving - Controllable Risks and Fatal Flaws

    Block caving is the lowest cost underground mining method but it has relatively high risks and a high up-front capital and development cost. It has application to large, often lower-grade orebodies wh

    Jan 1, 2000

  • AUSIMM
    Design of Underground Works for the Eastern Suburbs Railway, Sydney

    By Darby H. P, Vincent R. J

    Sydney's Eastern Suburbs Railway from Central to Bondi Junction required the construc- tion of 10.4 km of single-track tunnel and five underground stations. Much of this work took place beneath

    Jan 1, 1981

  • AUSIMM
    Improvement of Sinter Quality for the ISP

    By Kikuta K

    ISP (Imperial Smelting Process) produces zinc and lead simultaneously from zinc and lead sulphide concentrates and recovers copper and precious metals into a lead bullion. The strength of sinter is

    Jan 1, 1993

  • AUSIMM
    Biomineralisation ù A Novel Approach for Immobilising Toxic Metals in the Environment

    By L C. Thompson

    Biomineralisation is the process by which microorganisms mediate and catalyse inorganic reactions so as to form new mineral assemblages. The goal of biomineralisation as a remediation tool is to contr

    Jan 1, 2004

  • AUSIMM
    The Mineralized Rift Valleys of Tasmania - Discussion

    By King D, Dickinson S. B, Matheson R. S

    Graham Hall and V. M. Cottle (Rosebery, Tas.) : In their paper on "The Mineralized Rift Valleys of Tasmania", Campana, Dickinson, King and Matheson have summarized a wealth of data from many

    Jan 1, 1959

  • AUSIMM
    Development of Newmont's Minahasa Gold Mine in Indonesia

    The green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind

    Jan 1, 1997

  • AUSIMM
    Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)

    The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition

    Jan 1, 1980

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • AUSIMM
    Assessing Ore Loss and Ore Dilution ù Quantifying the Effects of Geological and Technical Uncertainties

    By P A. Dowd

    This paper describes an integrated approach to the evaluation of ore loss and ore dilution via geostatistical simulation of in situ geology and grade characteristics, simulation of blasting mechanisms

    Jan 1, 2004

  • AUSIMM
    Gold Mineralisation along the Nam Xiang Fault, Vieng Kham Project, North-east Laos

    By M J M Cunningham, M Greentree, J H Liu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Palaeozoic rocks of north-eastern Laos are an attractive target for gold explorers due

    Mar 18, 2015