Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flotation control using froth stability: past, present and futureBy C Smith, J Cilliers, K Hadler
Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be
Aug 29, 2018
-
Automated Drilling Features for Improving Productivity and Reducing Costs in Underground DevelopmentBy J Välivaara
The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines
May 9, 2016
-
Power Development at Mount Isa Mines LimitedThe development of Mount Isa Mines Limited power supply is traced through the history of the mine operations. As would be expected, growth of the power supply system follows closely the increase in mi
Jan 1, 1961
-
Mine Closure Guidelines for Western Australia and Consultation ProcessBy X T. Nguyen
Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a
Jul 10, 2012
-
Dore Metal Production with a Top Blown Rotary ConverterIn 1985 a 2.5-tonne top blown rotary converter was installed in the silver refinery at Cominco's Trail Operation to carry out the final cupellation of burndown metal to Dore metal. The furnace
Jan 1, 1989
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiativesBy S J. Loach
F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade
Sep 18, 2023
-
Experience of Operating a Pilot Heavy Medium Separation PlantOperation of a pilot heavy medium separation plant allows flexibility of operation not normally possible in an operating plant. Much useful data can be obtained, although some limitations apply.
Jan 1, 1987
-
Mass Blasting at Elura MineBy G Kennewell
At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp
Jan 1, 1999
-
Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold MineBy R Steven
"Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra
Nov 15, 2016
-
Design and Rehabilitation of Large External Waste Dumps: a Case StudyBy Fletcher G
This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba
Jan 1, 1992
-
A Review of the Stratigraphy of the Singleton Coal Measures and its Significance to Coal Geology and Mining in the Hunter Valley Region of New South WalesThe stratigraphy of the Singleton Coal Measures is reviewed and a revised stratigrapixy which has been ratified by the N.S.W. Standing Committee for Coalfield geology is nominated and defined by a
Jan 1, 1972
-
Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the PitBy D Gerrard, J Begelhole, J Gerber
The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir
Jul 13, 2015
-
The necessary role of the geologist in geotechnical data gatheringBy P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
Harsh Prospects: Early Mining in the Northern Flinders RangesBefore the arrival of the first Europeans, Aborigines living in the northern Flinders Ranges mined ochre - an earthy form of haematite used for pigment.The discovery of copper ore at Kapunda and Burra
Jan 1, 1993
-
Determination of Noble Metals at Crustal AbundancesBy Ryan CG, Cousens DR, Suter GF, Griffin WL
A novel method utilizing PIXE with microbeams following fire-assay has been developed to determine PGE and Au at sub-ppm levels suitable for application in exploration. Analyses of the prills from
Jan 1, 1989
-
A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and LeadingBy J Nixon
I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co
Mar 21, 2011
-
The Lead-Zinc Mineralization at Box Hole Bore, Georgina Basin, Northern TerritoryThe common notion that the Box Hole Bore mineralization represents a variant of the Mississippi Valley type, has not been supported by the present investigation. Most of the common characteristics
Jan 1, 1984
-
Olympic DamÆs Underground Rail Haulage System ù Six Years OnBy C Fearon
This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse
Jan 1, 2005
-
Mine Life Cycle Planning – Creating Lasting Value for CommunitiesBy S Robertson, I Buitrago
Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in
Jul 16, 2014