Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    Power Development at Mount Isa Mines Limited

    The development of Mount Isa Mines Limited power supply is traced through the history of the mine operations. As would be expected, growth of the power supply system follows closely the increase in mi

    Jan 1, 1961

  • AUSIMM
    Mine Closure Guidelines for Western Australia and Consultation Process

    By X T. Nguyen

    Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a

    Jul 10, 2012

  • AUSIMM
    Dore Metal Production with a Top Blown Rotary Converter

    In 1985 a 2.5-tonne top blown rotary converter was installed in the silver refinery at Cominco's Trail Operation to carry out the final cupellation of burndown metal to Dore metal. The furnace

    Jan 1, 1989

  • AUSIMM
    Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?

    By R Jacobs

    "The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile

    Mar 8, 2016

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    Experience of Operating a Pilot Heavy Medium Separation Plant

    Operation of a pilot heavy medium separation plant allows flexibility of operation not normally possible in an operating plant. Much useful data can be obtained, although some limitations apply.

    Jan 1, 1987

  • AUSIMM
    Mass Blasting at Elura Mine

    By G Kennewell

    At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp

    Jan 1, 1999

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Design and Rehabilitation of Large External Waste Dumps: a Case Study

    By Fletcher G

    This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba

    Jan 1, 1992

  • AUSIMM
    A Review of the Stratigraphy of the Singleton Coal Measures and its Significance to Coal Geology and Mining in the Hunter Valley Region of New South Wales

    The stratigraphy of the Singleton Coal Measures is reviewed and a revised stratigrapixy which has been ratified by the N.S.W. Standing Committee for Coalfield geology is nominated and defined by a

    Jan 1, 1972

  • AUSIMM
    Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the Pit

    By D Gerrard, J Begelhole, J Gerber

    The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir

    Jul 13, 2015

  • AUSIMM
    The necessary role of the geologist in geotechnical data gathering

    By P B. Hills

    Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t

    Sep 20, 2017

  • AUSIMM
    Harsh Prospects: Early Mining in the Northern Flinders Ranges

    Before the arrival of the first Europeans, Aborigines living in the northern Flinders Ranges mined ochre - an earthy form of haematite used for pigment.The discovery of copper ore at Kapunda and Burra

    Jan 1, 1993

  • AUSIMM
    Determination of Noble Metals at Crustal Abundances

    By Ryan CG, Cousens DR, Suter GF, Griffin WL

    A novel method utilizing PIXE with microbeams following fire-assay has been developed to determine PGE and Au at sub-ppm levels suitable for application in exploration. Analyses of the prills from

    Jan 1, 1989

  • AUSIMM
    A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and Leading

    By J Nixon

    I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co

    Mar 21, 2011

  • AUSIMM
    The Lead-Zinc Mineralization at Box Hole Bore, Georgina Basin, Northern Territory

    The common notion that the Box Hole Bore mineralization represents a variant of the Mississippi Valley type, has not been supported by the present investigation. Most of the common characteristics

    Jan 1, 1984

  • AUSIMM
    Olympic DamÆs Underground Rail Haulage System ù Six Years On

    By C Fearon

    This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse

    Jan 1, 2005

  • AUSIMM
    Mine Life Cycle Planning – Creating Lasting Value for Communities

    By S Robertson, I Buitrago

    Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in

    Jul 16, 2014