Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
"A Geometallurgical Proxy for Nickel Laterite Heap Leaching"By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman
"Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long
Jun 15, 2016
-
The Benefits of Automated Sampling and Analysis of Iron OreBy R Shaw, R Williamson
Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras
Jan 1, 2007
-
Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and ReconciliationAn integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore
Jan 1, 1990
-
An Environmental Collaborative Research Program ù Field Studies Contributing to the Sustainability of Ne w ZealandÆs Mineral IndustryBy T Clemens, D Trumm
Adopting environmentally acceptable practices in New Zealand is a crucial requirement for mineral wealth development. Recent planned expansions in the coal and gold industry have increasingly placed m
Jan 1, 2004
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
A Petrographic Approach to the Coking of Coals from the Illawarra Coal Measures of the Southern Coalfield, N.S.W.By Teague JK, Read HW
The relationship between the maceral composition of coal and the strength of the coke produced from that coal has received a great deal of attention in recent years. Studies using two Bulli Seam coal
Jan 1, 1970
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
BOCCOST Modelling Tracking and Relating Mine and Mill Performance Indicators in Real Time to Increase SAG Mill ThroughputBy L E. Setiawan
The mining and milling groups at Batu Hijau are tasked with increasing SAG mill throughput by approximately ten per cent. Avenues used for this process are blasting and crushing optimisation, ore blen
Jan 1, 2002
-
Waste Rock Geochemistry as an aid to the Development of Cost-Effective Mine Waste Planning and Rehabilitation StrategiesThe geochemistry of waste rock from mining operations is critical to the development of acidity-related environmental problems during mining operations, and following mine closure. Failure to recognis
Jan 1, 1993
-
Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide SlurriesBy Hawes GW
Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv
Jan 1, 1988
-
Education for the Mineral Industry: The Effective Design of Courses with Particular Reference to Mining and Mineral TechnologyAn attempt has been made in tftis paper to review the general situation regarding the needs of the Mining and Minerals Industry for skilled and qualified personnel. Having defined the behavioural o
Jan 1, 1981
-
Past Achievements and Future Challenges in the Underground Coal SectorBy B Robertson
Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and
Jul 1, 2013
-
Polish Scale of Harmfulness of Vibrations (SWD by its Polish Acronym) and Actual Damages to One-Family HousesIn this paper presented are the criteria used when assessing the harmfulness of shocks affecting the buildings. Those criteria are based on the value of speed or accelerations of building vibrations.
Jan 1, 2003
-
An Overview of the Proposed Guidelines to Standardise the Respirable Dust Sampling Strategy for Risk Determination in CollieriesThe introduction of gravimetric sampling of respirable dust in the mining industry ne- cessitated the standardisation of techniques. The paper reviews the legislation con- trolling respirable dust mo
Jan 1, 1988
-
Spectral Characteristics of the Ravenswood Gold Deposit, North Queensland, and its Application to Near-Mine and Regional ExplorationBy L Ryan, S Halley
The use of a field spectrometer to systematically analyse drill samples from over 200 holes around the Permian-Carboniferous Ravenswood gold deposits in north-east Queensland has successfully identifi
Jan 1, 2008
-
Successful Management of Mining Companies ù What Have We Learned From the 16th Century to the 21st Century?This short paper outlines the authorÆs views regarding the progress we have made as an industry in managing mining assets over the past 500 years. It represents a personal view û but one founded in fa
Jan 1, 2004
-
Evaluation of Exploration ProjectsIt is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment
Jan 1, 2007
-
Sustainability in Mining Engineering - Strategies Through Education and ResearchBy A J. Gunson
The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain
Jan 1, 2009
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressuresBy W Y. Kim, Y B. Kang, Y J. Park
The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th
Aug 21, 2024